Next Article in Journal
Towards an Inclusive Walking Community—A Multi-Criteria Digital Evaluation Approach to Facilitate Accessible Journeys
Next Article in Special Issue
Power Plant Construction Projects Risk Assessment: A Proposed Method for Temporary Systems of Commissioning
Previous Article in Journal
Influences of the Plot Area and Floor Area Ratio of Residential Quarters on the Housing Vacancy Rate: A Case Study of the Guangzhou Metropolitan Area in China
Previous Article in Special Issue
Critical Factors Influencing Early Contract Termination in Public Design–Build Projects in Developing and Emerging Economies
 
 
Article

Article Versions Notes

Buildings 2022, 12(8), 1198; https://doi.org/10.3390/buildings12081198
Action Date Notes Link
article pdf uploaded. 9 August 2022 14:58 CEST Version of Record https://www.mdpi.com/2075-5309/12/8/1198/pdf-vor
article pdf uploaded. 9 August 2022 15:01 CEST Updated version of record https://www.mdpi.com/2075-5309/12/8/1198/pdf-vor
article xml file uploaded 11 August 2022 04:30 CEST Original file -
article xml uploaded. 11 August 2022 04:30 CEST Update https://www.mdpi.com/2075-5309/12/8/1198/xml
article pdf uploaded. 11 August 2022 04:30 CEST Updated version of record https://www.mdpi.com/2075-5309/12/8/1198/pdf
article html file updated 11 August 2022 04:32 CEST Original file https://www.mdpi.com/2075-5309/12/8/1198/html
Back to TopTop