Advances in Project Development and Construction Management

A special issue of Buildings (ISSN 2075-5309). This special issue belongs to the section "Construction Management, and Computers & Digitization".

Deadline for manuscript submissions: 20 August 2024 | Viewed by 5021

Special Issue Editors


E-Mail Website
Guest Editor
School of Civil Engineering, Tsinghua University, Beijing 100084, China
Interests: construction management; energy management; engineering–procurement–construction (EPC) project delivery; construction standards; project investment; partnering; cooperative risk management; international project management
Special Issues, Collections and Topics in MDPI journals
Department of Civil Engineering, Xi’an Jiaotong-Liverpool University, Suzhou 215123, China
Interests: green buildings assessment; carbon emission; construction waste management; waste-to-energy; waste valorization; cost and benefit analysis of recycled materials; life cycle assessment
Special Issues, Collections and Topics in MDPI journals

Special Issue Information

Dear Colleagues,

This Special Issue, entitled “Advances in Project Development and Construction Management”, aims to publish research outcomes that address the advances related to construction engineering and management. The themes of this Special Issue cover engineering project planning, design, procurement, construction, project delivery, operation, sustainable project development, green buildings, construction waste management, and information technologies. Papers on new theoretical and technological advancements together with practical approaches, which help achieve the multiple objectives of engineering projects associated with economic, social and environmental sustainability, are invited.

More examples of Special Issues of Buildings at: https://www.mdpi.com/journal/buildings/special_issues.

Prof. Dr. Wenzhe Tang
Dr. Jianli Hao
Guest Editors

Manuscript Submission Information

Manuscripts should be submitted online at www.mdpi.com by registering and logging in to this website. Once you are registered, click here to go to the submission form. Manuscripts can be submitted until the deadline. All submissions that pass pre-check are peer-reviewed. Accepted papers will be published continuously in the journal (as soon as accepted) and will be listed together on the special issue website. Research articles, review articles as well as short communications are invited. For planned papers, a title and short abstract (about 100 words) can be sent to the Editorial Office for announcement on this website.

Submitted manuscripts should not have been published previously, nor be under consideration for publication elsewhere (except conference proceedings papers). All manuscripts are thoroughly refereed through a single-blind peer-review process. A guide for authors and other relevant information for submission of manuscripts is available on the Instructions for Authors page. Buildings is an international peer-reviewed open access monthly journal published by MDPI.

Please visit the Instructions for Authors page before submitting a manuscript. The Article Processing Charge (APC) for publication in this open access journal is 2600 CHF (Swiss Francs). Submitted papers should be well formatted and use good English. Authors may use MDPI's English editing service prior to publication or during author revisions.

Keywords

  • project planning
  • design
  • procurement
  • construction
  • project delivery
  • operation
  • sustainable project development
  • green buildings
  • construction waste management
  • information technologies

Published Papers (6 papers)

Order results
Result details
Select all
Export citation of selected articles as:

Research

25 pages, 947 KiB  
Article
The Impact of Change Orders Caused by Legislative Changes on Program Management in the UAE Construction Industry
by Yara Mattar, Mhd Amer Alzaim, Mariam AlAli, Inas Alkhatib and Salwa Beheiry
Buildings 2024, 14(5), 1294; https://doi.org/10.3390/buildings14051294 - 03 May 2024
Viewed by 340
Abstract
Program management is an important strategy for organizing and managing multiple interdependent construction projects to achieve strategic goals. However, when change orders occur, they can have a serious impact on the quality, time, cost of projects and, ultimately, affect the construction program. Furthermore, [...] Read more.
Program management is an important strategy for organizing and managing multiple interdependent construction projects to achieve strategic goals. However, when change orders occur, they can have a serious impact on the quality, time, cost of projects and, ultimately, affect the construction program. Furthermore, when change orders are caused particularly by legislative changes, such as environmental laws, taxes, tolls, safety codes, transportation, design or building codes, their impacts are unavoidable, yet can be managed through mitigation strategies. The existing literature only reports the implications of change orders on the project level and reports legislative changes as one of the contributing factors to change orders, but does not consider the implications on a program level. This study aims to close this knowledge gap by assessing the implications of change orders caused by legislative changes on program management in the construction industry during the construction phase, and explore what the possible mitigation strategies to manage change orders caused by legislative changes are. The objectives of the study include identifying the implications of change orders on construction projects in the UAE through a literature review using peer-reviewed journals and reliable industry sources. Additionally, we investigate the implications of change orders caused by legislative changes on construction programs through interviewing subject matter experts, evaluating the importance of the reported impacts, with possible mitigation strategies, through a structured questionnaire and Relative Importance Index (RII) and, finally, proposing a set of recommendations for key industry stakeholders. A mixed methods approach is adopted in this qualitative study, and the participants include clients, contractors and consultants from the construction industry, with a defined scope covering the construction stage only. The outcomes of the study can guide program managers, decision-makers and practitioners in the construction industry to successfully deliver all projects by directing proper resources to accommodate legislative changes. Full article
(This article belongs to the Special Issue Advances in Project Development and Construction Management)
Show Figures

Figure 1

24 pages, 3148 KiB  
Article
Sustainability Evaluation of Residential Buildings Based on the Footprint Family: Application to Case Studies in Andalusia
by Jaime Solís-Guzmán, Paula Garzón-González, Patricia González-Vallejo and Madelyn Marrero
Buildings 2024, 14(4), 1131; https://doi.org/10.3390/buildings14041131 - 17 Apr 2024
Viewed by 777
Abstract
The criteria on green public procurement of the European Union establish that the economic budgets of building projects must be complemented by their derived environmental and social costs. These criteria are currently being adapted to the requirements related to the circular economy, such [...] Read more.
The criteria on green public procurement of the European Union establish that the economic budgets of building projects must be complemented by their derived environmental and social costs. These criteria are currently being adapted to the requirements related to the circular economy, such as the use of methods to evaluate buildings environmentally. However, most methods available in the European and Spanish markets require prior training, which makes their use difficult. This paper presents an evaluation method, CEACE, for housing construction based on the determination of their footprints (ecological, carbon, and water footprints), also called the footprint family, to which the economic and social evaluation is added, as is the quantification of the construction and demolition waste generated. This method is validated with the assessment of fifteen residential buildings in Andalusia and creates an indicator that will allow technicians, companies, and administrations to evaluate projects in accordance with the criteria of green public procurement. The method is sensitive to changes in the type of building, foundation solution, and underground construction. Full article
(This article belongs to the Special Issue Advances in Project Development and Construction Management)
Show Figures

Figure 1

19 pages, 1695 KiB  
Article
Industry 4.0 Maturity of General Contractors: An In-Depth Case Study Analysis
by Priyadarshini Das, Srinath Perera, Sepani Senaratne and Robert Osei-Kyei
Buildings 2024, 14(1), 44; https://doi.org/10.3390/buildings14010044 - 22 Dec 2023
Viewed by 801
Abstract
Industry 4.0 technologies have business process re-engineering capabilities that can radically improve process performance and increase the effectiveness of communication and collaboration between actors. Despite the significant emphasis on technology adoption, the slow uptake rate can be attributed to ignoring nontechnical aspects, such [...] Read more.
Industry 4.0 technologies have business process re-engineering capabilities that can radically improve process performance and increase the effectiveness of communication and collaboration between actors. Despite the significant emphasis on technology adoption, the slow uptake rate can be attributed to ignoring nontechnical aspects, such as systemic change concerning people and processes. There are ample Industry 4.0 maturity models in the literature; however, a common criticism of maturity models lies in their applicability. This paper attempts to address this criticism by presenting two case studies where maturity assessments for general contractors were conducted to understand how ready they were to adopt to Industry 4.0 and what they could do to improve their current readiness. This paper aims to answer the following research questions: (1) Can the Industry 4.0 maturity modelling literature be applied in an organisational context for a construction general contractor? (2) Do construction general contractors relate to such an assessment? To answer the research questions, a comprehensive assessment of the Industry 4.0 maturity of two general contractors was conducted, thereby intending to support their strategic planning and systematise their transformation in Industry 4.0. The richness of the findings lies in the detailed understanding of the organisation’s current Industry 4.0 capabilities and future plans, thereby establishing the applicability of the maturity attributes identified from the literature and confirming whether the managers of a construction organisation can relate to them. Full article
(This article belongs to the Special Issue Advances in Project Development and Construction Management)
Show Figures

Figure 1

24 pages, 1021 KiB  
Article
Mechanisms of Learning and Innovation in Project Performance: Evidence from Chinese Hydropower Industry
by Senchang Hu, Heng Zhao and Wenzhe Tang
Buildings 2023, 13(10), 2665; https://doi.org/10.3390/buildings13102665 - 23 Oct 2023
Cited by 1 | Viewed by 800
Abstract
Hydropower, a renewable energy resource, underpins China’s economic and social advancement, gaining prominence amidst the country’s energy structure metamorphosis. Enhancing the performance of hydropower development projects is imperative, with the mechanisms of learning and innovation wielding a substantial impact. The extant literature on [...] Read more.
Hydropower, a renewable energy resource, underpins China’s economic and social advancement, gaining prominence amidst the country’s energy structure metamorphosis. Enhancing the performance of hydropower development projects is imperative, with the mechanisms of learning and innovation wielding a substantial impact. The extant literature on how learning and innovation affect hydropower project performance remains nebulous, lacking a systematic model to elucidate these impact mechanisms. This investigation melds theoretical analysis with the idiosyncrasies of hydropower project development, forging a theoretical model to decipher the interplay of learning, innovation, and project performance. Employing a mixed-methods approach, we probe the influence of organizational learning orientation and individual learning on participant capabilities, engineering innovation magnitude, and overall project performance. Path analysis divulges that organizational learning orientation catalyzes individual learning, jointly enhancing engineering innovation and project performance directly, although the effect on each participant’s capability necessitates mediation through the engineering innovation level. This pioneering study establishes the links and influence trajectories between learning, innovation, and project performance, systematically delineating them. It fills a scholarly void in exploring learning and innovation mechanisms within hydropower project development, propounding strategies to augment project efficiency and furnishing pragmatic, constructive insights for better engineering practice outputs. Full article
(This article belongs to the Special Issue Advances in Project Development and Construction Management)
Show Figures

Figure 1

19 pages, 3112 KiB  
Article
Influence of Project Governance Mechanisms on the Sustainable Development of Public-Private Partnership Projects: An Empirical Study from China
by Yingqi Song and Shengyue Hao
Buildings 2023, 13(10), 2424; https://doi.org/10.3390/buildings13102424 - 23 Sep 2023
Cited by 1 | Viewed by 902
Abstract
In China, achieving sustainable development goals for PPP projects is an urgent issue. Project governance mechanisms are important to PPP project sustainability, but there are many risk factors in traditional project governance mechanisms. This research focuses on embedding risk governance mechanisms into the [...] Read more.
In China, achieving sustainable development goals for PPP projects is an urgent issue. Project governance mechanisms are important to PPP project sustainability, but there are many risk factors in traditional project governance mechanisms. This research focuses on embedding risk governance mechanisms into the traditional project governance system with contract governance mechanisms and relationship governance mechanisms. The main purpose is to reveal the integration of PPP project governance mechanisms and its impact on governance performance and project sustainability, and to propose governance optimization strategies. First, by enriching the understanding of the governance mechanism, governance performance and project sustainability, and improving the measurement scale. Then, by constructing a structural equation model, collecting data through questionnaires, and exploring the effect of the project governance mechanism on project sustainability. (1) The results of direct effect testing show that contractual governance mechanisms, relational governance mechanisms and risk governance mechanisms are positively associated with governance performance, and governance performance is positively associated with project sustainability; (2) the results of mediating effect testing show that interaction of the three governance mechanisms has a positive effect on governance performance. The research results provide a new approach and perspectives for improving project governance mechanisms and achieving sustainable development in the practice of PPP projects. Full article
(This article belongs to the Special Issue Advances in Project Development and Construction Management)
Show Figures

Figure 1

17 pages, 1306 KiB  
Article
To Achieve Goal Alignment by Inter-Organizational Incentives: A Case Study of a Hydropower Project
by Yunhong Wang, Senchang Hu, Hyun Woo Lee, Wenzhe Tang, Wenxin Shen and Maoshan Qiang
Buildings 2023, 13(9), 2258; https://doi.org/10.3390/buildings13092258 - 05 Sep 2023
Viewed by 807
Abstract
Although the use of incentives has been widely recognized as an effective project management tool, its application still needs specific exploration. Existing research on incentives mainly focuses on intra-organizational incentives, lacking systematic research with empirical evidence from the perspective of the inter-organizational level. [...] Read more.
Although the use of incentives has been widely recognized as an effective project management tool, its application still needs specific exploration. Existing research on incentives mainly focuses on intra-organizational incentives, lacking systematic research with empirical evidence from the perspective of the inter-organizational level. To fill this research gap, this study conducted an in-depth investigation into the application and impacts of inter-organizational incentives by studying a typical case of a hydropower project. In this case, a series of innovative inter-organizational incentives, involving a multiple contractual incentive scheme concerning schedule, quality, safety, as well as environmental performance, is applied. Using a mixed methodology that included a document review, a questionnaire survey, and interviews, this case study revealed that inter-organizational incentives could effectively help promote goal alignment, stimulate cooperative inter-organizational relationships, and improve project performance. This research developed a novel classification of inter-organizational incentives and emphasized the importance of non-contractual and informal incentives, which were ignored in previous research. The results further highlight that while incentivized organizations generally value incentives according to their monetary intensity, their prioritization of goals is determined by various factors. Therefore, to achieve project goal alignment, the optimization of incentive schemes should comprehensively consider a variety of influencing factors rather than merely focusing on monetary intensity. These findings will help both academic researchers and industrial practitioners design and execute effective inter-organizational incentives for superior project performance, especially for those projects that pursue high sustainable performance with safety and environmental performance included. Full article
(This article belongs to the Special Issue Advances in Project Development and Construction Management)
Show Figures

Figure 1

Back to TopTop