Next Article in Journal
Systematic Review of the Use of the Walk-Along Interview Method to Assess Factors, Facilitators and Barriers Related to Perceived Neighborhood Environment and Walking Activity in Healthy Older Adults
Previous Article in Journal
Analysis of Thermodynamic Events Taking Place during Vacuum Drying of Corn
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Supplier Selection in Downstream Oil and Gas and Petrochemicals with the Fuzzy BWM and Gray COCOSO Methods Considering Sustainability Criteria and Uncertainty Conditions

by
Alireza Parsa Rad
1,
Mohammad Khalilzadeh
2,*,
Sayyid Ali Banihashemi
3,
Darko Božanić
4,*,
Aleksandar Milić
4 and
Goran Ćirović
5
1
Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran 1477893855, Iran
2
Industrial Engineering Department, Faculty of Engineering and Natural Sciences, Istinye University, Sarıyer 34396, Turkey
3
Department of Industrial Engineering, Payame Noor University, Tehran 193954697, Iran
4
Military Academy, University of Defence in Belgrade, Veljka Lukica Kurjaka 33, 11000 Belgrade, Serbia
5
Faculty of Technical Sciences, University of Novi Sad, Trg Dositeja Obradovica-6, 21000 Novi Sad, Serbia
*
Authors to whom correspondence should be addressed.
Sustainability 2024, 16(2), 880; https://doi.org/10.3390/su16020880
Submission received: 15 December 2023 / Revised: 8 January 2024 / Accepted: 13 January 2024 / Published: 19 January 2024

Abstract

:
A project always needs the participation of suppliers to provide the goods and services needed by the project. As the size of the project increases, the need to use suppliers also increases. Choosing the appropriate suppliers for the project is always a difficult task, and considering different criteria along with the existence of multiple alternatives always increases the difficulty and complexity of the supplier selection problem. This study deals with the supplier selection problem, which is one of the important issues in projects and organizations in the downstream field of oil, gas, and petrochemicals. The purpose of this paper was to investigate and improve the supplier selection procedure in this field by considering real-world uncertain conditions. To this end, the fuzzy set theory and gray numbers were taken into account. In the present study, the criteria were first determined by expert judgment; then, the fuzzy best–worst method (FBWM) was exploited to rank the criteria; finally, the suppliers were prioritized and ranked by using the gray COCOSO method The results showed that the highest and the lowest weights were obtained for the “price” and “attention to environmental issues” criteria, respectively. Also, the selected supplier was a supplier with a high score in all criteria. One of the practical benefits of this research is to provide a solution to speed up, facilitate, and improve the process of selecting suppliers for companies in the downstream field of oil, gas, and petrochemicals.

1. Introduction

Projects need resources for the implementation and achievement of their predefined goals. In many cases, these required resources are provided by suppliers. The need for suppliers in large and complex projects is reasonably more than in other projects. In fact, suppliers should provide quality goods or services at a competitive price to survive in the globally competitive market. Supplier selection is one of the problems of project employers. It might be thought that outsourcing is very simple and facilitates project implementation. However, it may cause new issues and problems that did not exist in the inherent characteristics and implementation processes of the project. For example, one of the problems that organizations and project managers face is that suppliers should provide the required equipment, machinery, and materials for the project [1]. Also, the performance of the suppliers is another important issue in project management. In other words, it is a matter of how accurately, speedily, and efficiently the supplier accomplishes the tasks. It should be noted that choosing suppliers has its own problems, hardships, and difficulties to the extent that the selection of unknown suppliers or suppliers that are less known can be considered as major risks of a project [2]. On the other hand, the environmental issues and destructive effects of various activities on the environment have been receiving more attention from governments and organizations to the point that regulatory orders on environmental issues have been raised so that these issues are taken into consideration in the selection of suppliers [3]. Therefore, it has been attempted to consider the aspects of sustainability in order to achieve a sustainable supply chain by examining and selecting sustainable suppliers. Various organizations are seeking to achieve sustainable goals according to the awareness of customers, beneficiaries, and stakeholders in order to exploit these achievements as a competitive advantage and strengthen their reputation [4,5], because selecting a sustainable and reliable supplier can reduce costs and improve the performance of the entire supply chain network [6,7].
In general, the selection of suppliers is one of the substantial and key activities of a project. There are several traditional methods for selecting suppliers in projects, but the multitude of suppliers as well as their different characteristics have caused the inefficiency of these traditional supplier selection methods [2]. Various methods have been introduced to help decision-makers in selecting suppliers based on different criteria. However, an appropriate supplier selection method should consider all the necessary aspects and include important and influential factors as well as uncertainty conditions [8,9]. On the other hand, due to the fact that the field of oil, gas, and petrochemicals is vast and plays a critical role in many countries, the projects in this field are also of extreme importance and have large dimensions as well as a high complexity [10]. In addition, the main part of the economy of any country active in this field relies on these projects. As a result, the selection of suppliers is of extreme importance and sensitivity, and any mistake in the selection process may lead to detrimental time, cost, and credit consequences for the project and its stakeholders [11]. In other words, it can be said that the larger the size and complexity of a project, the more requirements for suppliers. This magnitude and complexity can be seen in the field of oil, gas, and petrochemicals, and decision-making in this field, particularly for selecting suppliers, has always been associated with numerous difficulties.
Furthermore, to the authors’ knowledge, very limited studies have addressed various data-gathering techniques together with uncertainty and sustainability features. Also, the sustainable supplier selection problem has rarely been investigated in the oil, gas, and petrochemicals sectors.
In this study, the best–worst method (BWM) is used to weight the criteria. This method is based on pairwise comparisons, provides a clear understanding of the evaluation scope of the paired comparisons and also provides more reliable comparisons. In other words, a smaller number of pairwise comparisons as well as a higher consistency rate can be mentioned as the prominent advantages and distinctions of the BWM compared to other weighting techniques [12]. In addition, if there are more than three criteria in nonlinear models, they usually produce multiple solutions, but this problem has been solved in this linear model. Since experts use linguistic expressions to compare the criteria, the weighting method can be improved by incorporating fuzzy logic and utilizing the fuzzy best–worst method (FBWM) as an extension of the BWM method.
Subsequently, the COCOSO (combined compromise solution) method, as a novel multicriteria decision-making method introduced in 2019, is exploited to rank the suppliers. One of the advantages of this method and a reason for employing it is its compensability feature. Another reason for using this method is that the COCOSO contains a combination of methods such as the weighted aggregated sum product assessment (WASPAS), simple additive weighting (SAW), and exponentially weighted product (EWP), which enables the formation of a more robust model and a more accurate decision-making [13,14]. In the present research, the COCOSO-G method is employed by incorporating gray numbers into the COCOSO method to deal with uncertainty conditions. In the COCOSO-G method, a number of suppliers are evaluated and ranked based on the final criteria. In order to improve the ranking, uncertainty conditions are considered by using gray numbers instead of crisp numbers so that the errors of the linguistic variables that are expressed by the experts are lessened and the obtained results are more reliable [15].
The remainder of this paper is structured as follows: Section 2 provides a review of the relevant studies on supplier selection. Subsequently, Section 3 explains the research methodology. In Section 4, the computational results are presented. Finally, Section 5 concludes the paper.

2. Literature Review

Increasing the efficiency of project execution and reducing waste is one of the important issues in project management. Suppliers play a very important role in this matter, and their selection has always been a crucial management issue. Therefore, a systematic review of the literature was carried out to identify the research gaps in this field and how to select suppliers in the future. In addition to the cost criterion, other criteria should be considered for the selection of a supplier [16]. For this purpose, Thevenin et al. [17] proposed a robust optimization approach for supplier selection considering uncertainty conditions and declared that a supplier that did not offer the lowest price may be selected. Project activities need resources to be executed and accomplished. Hence, the selection of suppliers that provide these required resources becomes more important since the time it takes to provide the resources can affect the project schedule. To this end, project managers must pay special attention to the integrity of the entire supply chain to control its effect on the project schedule. Therefore, Abdzadeh et al. [18] presented a tabu search (TS) algorithm for supplier selection to increase customer satisfaction and reduce the total cost.
There are several mathematical models considering various evaluation criteria. For example, Feng et al. [19] considered different supplier evaluation criteria such as carbon emissions, quality, order cost, and service level. Despite considering various evaluation criteria in different models, they had some shortcomings; for example, they did not consider the conditions of uncertainty. There are several types of uncertainty associated with the supplier selection problem such as failure in on-time delivery and an uncertain price. Therefore, Mohammadivojdan et al. [20] dealt with uncertainty in this problem using a Monte Carlo simulation. Numerous research works have been conducted to identify and find the criteria for selecting suppliers using the opinions of experts in this field. Sonar et al. [21] suggested that emerging paradigms such as lean, agile, green, sustainability, etc., can be incorporated to find the key criteria for supplier selection more appropriately. Moreover, Zaretalab et al. [22] developed a multiobjective model for the supplier selection problem and solved it using a nondominated sorting genetic algorithm (NGSA-II) to obtain more reliable and favorable results.
In order to consider uncertainty in the suppler selection problem in the oil and gas industry, Yazdi et al. [23] used the BWM-G method and ranked a number of supplier selection criteria. Saputro et al. [24] reviewed a large number of published articles in the last 20 years on the supplier selection problem as a key lever for the success of companies. Hosseini et al. [25] tried to balance the aspects of sustainability by presenting a biobjective mathematical model for the supplier selection problem and solved the problem by presenting an integrated approach based on stochastic and dynamic programming. Shang et al. [26] utilized the fuzzy Shannon entropy with BWM and MULTIMOORA methods to select a sustainable supplier. Finger and Lima-Junior [27] developed the HFLTS-QFD model for sustainable supplier selection and used fuzzy logic to deal with linguistic expressions. Ahmad et al. [28] presented a mixed-integer nonlinear model for the supplier selection problem. Zhou et al. [29] introduced a stochastic programming model to develop suppliers’ performance and implemented the model on a small manufacturing company. They concluded that the evaluation as well as the correct selection and management of suppliers could greatly reduce the impact and probability of risks related to suppliers. Masoomi et al. [30] also investigated the green supply chain problem and selected a strategic green supplier by using FBWM methods for weighting and WASPAS and COPRAS for evaluating and ranking the alternatives. Bonnedahl et al. [31] stated that many factors had caused increasing concerns about environmental issues. Also, sustainable development has been one of the goals of the international community for more than three decades; for this purpose, sustainable development was included in the UN 2030 agenda. Sarrakh et al. [32] adopted a qualitative approach to collect and analyze the data of eight organizations based on 24 interviewees and concluded that despite the implementation of the 2030 vision, there were many key challenges such as resistance to changes, price fluctuations, and initial costs that hindered the implementation of sustainability strategies. Many organizations are paying more attention to the issue of sustainability, particularly in the field of oil and gas and petrochemicals [33].
Table 1 presents a summary of the review of past related studies along with research gaps.
According to Table 1, the proposed supplier selection method in this research, which includes different data-gathering methods and sustainability aspects and deals with uncertainty conditions, can be mentioned as the main contribution of the present study. In addition, the sustainable supplier selection problem has rarely been addressed in the oil, gas, and petrochemical industry. Also, in order to take the uncertainty in the weights of criteria and ranking into account, the FBWM method is utilized to obtain the weights of the criteria, and the COCOSO-G method is employed to rank the suppliers.

3. Materials and Methods

In the current research, first, the related studies were reviewed. Then, the organizational data of one of the companies in the downstream field of the oil, gas, and petrochemical industry were examined. Subsequently, using semistructured interviews with experts and the Delphi method, the procedure of selecting suppliers was investigated. By integrating the factors obtained from the literature review as well as the opinions of experts and organizational data, a complete summary of the important factors for the selection of suppliers in this field was obtained. Afterward, the FBWM method was exploited to weight the final criteria. Finally, the criteria were ranked using the COCOSO-G method. This method is a multicriteria decision-making technique to choose the best alternative among several alternatives. In this method, a number of alternatives are measured with a set of factors and criteria and finally the best alternative is selected.

3.1. Fuzzy Sets Theory

In 1965, Lotfizadeh introduced the fuzzy set theory for a better evaluation of experts’ opinions in the decision-making process. This theory is used as a powerful tool to solve problems under conditions of uncertainty [40]. A triangular fuzzy number A ~ = l , m , u consists of three values, an upper limit (u), a middle limit (m), and a lower limit (l). The mathematical calculations of two fuzzy numbers are defined as follows. In Equation (1), A 1 ~ and A 2 ~ are two given triangular fuzzy numbers. Also, k is a given positive crisp number.
A 1 ~ + A 2 ~ = l 1 + l 2 , m 1 + m 2 , u 1 + u 2 A 1 ~ A 2 ~ = l 1 u 2 , m 1 m 2 , u 1 l 2 A 1 ~ A 2 ~ = l 1 l 2 , m 1 m 2 , u 1 u 2 k A 1 ~ = k l 1 , k m 1 , k u 1 , k > 0 A 1 ~ k = l 1 k , m 1 k , u 1 k , k > 0
The following equation is used to obtain the average of fuzzy numbers [41]:
R A i ~ = l i + 4 m i + u i 6

3.2. The Fuzzy Best–Worst Method (FBWM)

In this section, the steps of the fuzzy BWM method as an extension of the conventional BWM method [42] are explained:
First step: Specify the criteria set: in this step a set of decision criteria is formed.
Second step: Determine the best and worst (most important and least important) criteria: In this step, the decision-makers are asked to determine the most important (best) and the least important (worst) criteria.
Third step: Comparing the best criterion with other criteria: in this step, the best-to-other vector A ~ B = a ~ B 1 , a ~ B 2 , , a ~ B n is formed, where a ~ B j denotes the fuzzy comparison of the best criterion B with other criteria j.
Fourth step: Comparing other criteria with the worst criterion: in this step, the other-to-worst vector A ~ W = a ~ 1 W , a ~ 2 W , , a ~ n W is formed, where a ~ j W denotes the fuzzy comparison of the worst criterion W with other criteria.
In order to make comparisons in step 3 and 4, it is necessary to convert the linguistic expressions into fuzzy numbers by using the rules of transformation of the linguistic variables of the decision-makers presented in Table 2.
Fifth step: Creating the fuzzy BWM model: In this step, the weights of the defined criteria are computed using the below nonlinear model. It is recommended to convert the model into a linear model when the number of criteria is greater than 3 to achieve better results [41].
min ξ ˜ * s . t . l B W ,   m B W ,   u B W l j W ,   m j W ,   u j W l B j ,   m B j ,   u B j k * ,   k * ,   k * l j W ,   m j W ,   u j W l W W ,   m W W ,   u W W l j W ,   m j W ,   u j W k * ,   k * ,   k * j = 1 n R W ˜ j = 1 l j W m j W u j W l j W 0 j = 1 , 2 , , n
where w ~ B = ( l B w , m B w , u B w ), w ~ j = ( l j w , m j w , u j w ), w ~ w = ( l W w , m W w , u W w ), a ~ B j = ( l B j , m B j , u B j ) , a ~ j W = ( l j W , m j W , u j w ) and ξ ~ = l ξ , m ξ , u ξ . For more information, we refer to [41].
Sixth step: Solve the above model with optimization software such as GAMS 44.4.0 or LINGO 17.0 to find the criteria’s weights w ~ 1 , w ~ 2 , , w ~ N . In addition, the Consistency Index (CI) (shown in Table 3) and the optimal value k are applied to compute the Consistency Ratio (CR) as follows:
C o n s i s t e n c y   R a t i o   ( C R ) = k C o n s i s t e n c y
It should be mentioned that the best and worst criteria are identified using each expert’s opinion separately. Then, the fuzzy BWM model is created for each expert and solved in order to calculate the criteria’s weights. Finally, the obtained weights based on each expert’ opinion are merged [42].

3.3. The COCOSO-G Method

After calculating the weights of the criteria, the suppliers are ranked using the COCOSO-G method [43]. In this section, the steps of the COCOSO-G method are presented [44].
Step 1: Forming the decision matrix: in this step, the following decision matrix is created:
x i j = x 11 x 12 x 21 x 22 x 1 n x 2 n x m 1 x m 2 x n m   i = 1 ,   2 , ,   m ; j = 1 ,   2 , ,   n
Step 2: Normalizing the decision matrix: in this step, the decision matrix is normalized by using the following equations:
r i j = x i j min i x i j max i x i j min i x i j                             ( for positive criteria )
r i j = min i x i j x i j max i x i j min i x i j                             ( for negative criteria )
Step 3: Calculating the values of the weighted multiplication and weighted sum: In this step, the values of the weighted multiplication and weighted sum are calculated, which are called P and S. To implement this step, the decision matrix elements that have been normalized in the previous step are multiplied once by the weights of the criteria and once again are raised to the power of those weights.
S i = j = 1 n w i r i j
P i = j = 1 n r i j w j
Step 4: Calculating factor evaluation scores based on three strategies: in this step, the three following equations are used to implement three strategies:
k i a = P i + S i i = 1 m P i + S i
k i b = S i   min i S i + P i   min i P i
k i c = S i + ( 1 λ ) P i   min i S i + ( 1 λ ) min i P i ;                     0 λ 1
Step 5: Determining the final scores and rankings of the alternatives: In this step, according to the following equation, the final score is obtained. In other words, the alternative that achieves the highest score is determined as the most important alternative.
k i = k i a k i b k i c 1 3 + 1 3 k i a k i b k i c

3.4. Gray Logic

Gray logic is similar to fuzzy logic, but there are some differences that distinguish them from each other [45]. The main difference between gray numbers and fuzzy numbers is that in gray numbers, the interval in which the number is placed is known, but the value of the number itself is not known; in other words, there is doubt and uncertainty about its exact value [46,47]. Gray numbers are applied to cases where research is conducted based on uncertain and unreliable information. Therefore, in the current research where the criteria are ranked by using the linguistic variables, gray numbers can be easily used. In general, a gray number is defined as follows [47]:
z ~ = [ a , b ]
A number of operations on two gray numbers are defined as follows:
Z ~ 1 = [ a , b ]                       Z ~ 2 = [ c , d ]
Z ~ 1 + Z ~ 2 = a + c ,   b + d
Z ~ 1 Z ~ 2 = a c ,   b d
Z ~ 1 = b , a
λ Z ~ 1 = [ λ a , λ b ]

3.5. The COCOSO-G Method

The COCOSO-G method as an extension of the COCOSO method is efficient and includes the general advantages of both the COCOSO method and gray logic. The steps of the COCOSO-G method are as follows [48]:
Step 1: Identifying the criteria and alternatives: in this step, the criteria and alternatives are defined.
Step 2: In this step, as in the COCOSO method, the following decision matrix is formed
X = a 11 ,   b 11 a 12 ,   b 12 a 21 ,   b 21 a 22 ,   b 22 a 1 m ,   b 1 m a 2 m ,   b 2 m a n 1 ,   b n 1 a n 2 ,   b n 2 a n m ,   b n m
where a i j denotes the upper limit of the gray number, and b i j indicates the lower limit of the gray number.
Step 3: Normalizing the decision matrix: in this step, the decision matrix is normalized using the following two equations for positive and negative criteria:
r = c i j ,   d i j = a i j ,   b i j min i a i j ,   b i j max i a i j ,   b i j min i a i j ,   b i j                             ( for positive numbers )
r = c i j ,   d i j = max i a i j ,   b i j a i j ,   b i j max i a i j ,   b i j min i a i j ,   b i j                             ( for negative numbers )
Step 4: Calculating the values of the weighted multiplication and weighted sum: In this step, the values of the weighted multiplication and weighted sum are normalized and calculated as follows. The weights obtained by the FBWM are used in this step.
S i = j = 1 n w i c i j ,   d i j
P i = j = 1 n c i j ,   d i j w j
Step 5: Calculating factor evaluation scores based on three strategies: in this step, the relative weights of the alternatives are used by applying three strategies, where λ is between 0 and 1, but usually, it is considered to be 0.5.
H i a = h 1 i j ,   h 2 i j = P i + S i i = 1 m P i + S i
L i a = l 1 i j ,   l 2 i j = S i   min i S i + P i   min i P i
M i a = m 1 i j ,   m 2 i j = λ S i + ( 1 λ ) P i   λ max i S i + ( 1 λ ) max i P i
0 λ 1
Step 6: Calculating the sum of the geometric mean and the arithmetic mean of the three strategies of the previous step: in this step, the sum of the geometric mean and the arithmetic mean of the three numbers (obtained from the strategy of the previous step) are calculated by using the following equation:
K i = H i a L i a M i a 1 3 + 1 3 H i a + L i a + M i a
Step 7: Calculating the final scores: in this step, the obtained K’s are compared with each other to be ranked. The gray vector K i = s i ,   t i is converted into the final score using the following equation:
K = ( t i s i ) / t i
where s and t are greater than zero.

4. Results

First, according to the literature studies, the most important criteria for selecting suppliers are presented in the following table to be investigated further.
Then, after examining the organizational data of the company under study as well as several meetings with experts, a further investigation of the information provided in Table 4 was carried out, and several discussions were held about these criteria to determine if a criterion was not of high importance and should be removed. Also, in these meetings, it was determined that if an important criterion was not on this list, it would be added to this list.
The information about the experts is given in Table 5.
In these meetings, by using organizational data and reviewing relevant studies as well as experts’ opinions, all the important criteria in the field of oil, gas, and petrochemical industry were categorized and finalized. The result of these meetings, which were conducted using the Delphi method, are presented in the Table 6:
In order to perform better and easier calculations for weighting the criteria, first, the FBWM method was implemented on the categories (C1, C2, C3, C4), and then, the FBWM method was implemented for each category of criteria. This process was performed once for each expert. As an instance, the information related to one expert is presented as follows.
The tables for the FBWM related to the first expert are as follows (Table 7):
And the related model is also expressed as follows:
m i n   ξ : s . t . l 2 3.5 u 1 e u 1 0 ;     l 2 3.5 u 1 + e u 1 0 ; m 2 4 m 1 e m 1 0 ;     m 2 4 m 1 + e m 1 0 ; u 2 4.5 l 1 e l 1 0 ;     u 2 4.5 l 1 + e l 1 0 ; l 2 2.5 u 3 e u 3 0 ;     l 2 2.5 u 3 + e u 3 0 ; m 2 3 m 3 e m 3 0 ;     m 2 3 m 3 + e m 3 0 ; u 2 3.5 l 3 e l 3 0 ;     u 2 3.5 l 3 + e l 3 0 ; l 2 1.5 u 4 e u 4 0 ;     l 2 1.5 u 4 + e u 4 0 ; m 2 2 m 4 e m 4 0 ;     m 2 2 m 4 + e m 4 0 ; u 2 2.5 l 4 e l 4 0 ;     u 2 2.5 l 4 + e l 4 0 ; l 3 1.5 u 1 e u 1 0 ;     l 3 1.5 u 1 + e u 1 0 ; m 3 2 m 1 e m 1 0 ;     m 3 2 m 1 + e m 1 0 ; u 3 2.5 l 1 e l 1 0 ;     u 3 2.5 l 1 + e l 1 0 ; l 4 2.5 u 1 e u 1 0 ;     l 4 2.5 u 1 + e u 1 0 ; m 4 3 m 1 e m 1 0 ;     m 4 3 m 1 + e m 1 0 ; u 4 3.5 l 1 e l 1 0 ;     u 4 2.5 l 1 + e l 1 0 ; 1 6 ( l 1 + 4 m 1 + u 1 ) + 1 6 ( l 2 + 4 m 2 + u 2 ) + 1 6 ( l 3 + 4 m 3 + u 3 ) + 1 6 ( l 4 + 4 m 4 + u 4 ) = 1 ; l 1 m 1 u 1 ;         l 2 m 2 u 2 ;         l 3 m 3 u 3 ;         l 4 m 4 u 4 ; l 1 > 0 ;         l 2 > 0 ;         l 3 > 0 ;         l 4 > 0 ; e 0 ;
The following solution was obtained by coding the above model in the LINGO optimization software (shown in Table 8):
Finally, after modeling all categories of criteria and solving them for all five experts, the final weights of the criteria were obtained by calculating the average of the weights obtained from the experts. The final weights of the criteria are presented in Table 9.
In order to rank suppliers using the COCOSO-G method, in the first step, each supplier’s score was calculated according to the finalized criteria using experts’ opinions (as shown in Table 10).
This process was performed for each expert and the scores of the suppliers were collected based on the opinions of all five experts. Finally, the average of the scores was calculated in order to rank the suppliers based on the average score (as shown in Table 11).
After obtaining the average scores of the suppliers, the gray scores were normalized, shown in Table 12:
Subsequently, the values of Si and Pi were obtained, as shown in Table 13:
In the next step, using Si and Pi values obtained for each supplier, the H i a , L i a , and M i a values were calculated (as shown in Table 14).
In the last step, the final score of each supplier was calculated. But considering that the final scores are gray numbers, these scores must be converted to integer numbers. Finally, suppliers were ranked according to the final scores (as shown in Table 15).

Practical Implications

One of the practical benefits of this research is to speed up the process of selecting suppliers in companies active in the downstream field of the oil, gas, and petrochemical industry which generally is time-consuming and difficult, as this process is usually faced with various problems that can cause many delays. Therefore, in order to avoid these problems, using the proposed supplier selection method can be exploited to avoid problems and delays; also, the results will be more reliable.
In addition, the sustainability concept, which has received more attention in recent years, has also become more important in this industry; hence, taking the sustainability aspects into account in this study can assist decision-makers and planners in this industry making the supplier selection closer to real-world conditions, which adds to the necessity and importance of this research.

5. Discussion and Conclusions

There are numerous traditional methods to choose the suppliers of the project, but the multiplicity of suppliers as well as the distinctiveness of their characteristics, advantages, and disadvantages make the traditional selection methods ineffective. Hence, various methods have been proposed to help decision-makers and managers select suitable suppliers. However, these methods usually consider few criteria and rarely take uncertainty and sustainability into account. This research can help many managers and decision-makers of oil, gas, and petrochemical projects with the selection of appropriate suppliers by taking into account various criteria together with uncertainty and sustainability. The application of the method presented in this paper in other projects can increase their probability of success since choosing the right suppliers can play a crucial role in reducing project delays and costs and preventing several problems.
In this research, for selecting the best supplier, various criteria and subcriteria were determined by reviewing scientific articles and referable sources, using the Delphi method, and interviewing experts in the oil, gas, and petrochemical industry. The interviews were conducted in a semistructured manner to increase efficiency. That way, if needed, any of the experts could change the questions or add new questions. The criteria were weighted by using the FBWM method and Excel software 2016. The results showed that the price and the way of settling an account were given the most weight, and attention to environmental issues was considered as the least important factor for choosing a supplier. Moreover, work experience on similar oil, gas, and petrochemical projects was ranked next, since it is obvious that previous experiences have a significant impact on the performance and efficiency of suppliers, as they avoid secondary problems and can result in project success. Also, waste management was ranked next; considering the high importance of waste management as a global crisis, this relatively high weight was not unexpected, especially in such a field, where the lack of attention to this factor can trigger several problems for the project. In addition, quality in the technical category, reputation and position in the industry in the expertise and experience category, and the delivery method in the technical category were placed in the following ranks. The findings are aligned with past experience and experts’ opinions since reviewing the projects that have been carried out in this field demonstrates that paying attention to these factors leads to reduced delays and improved implementation of projects. It can also be concluded that a supplier gets a higher overall score and rank if it obtains a good score in each criterion. In other words, if a supplier obtains a high score in one or more criteria and low scores in other criteria, it will not gain a high final score and cannot be selected as the best supplier. Therefore, suppliers should try to improve their performance based on all of the criteria and not only pay attention to the cost factor.
The weights obtained by solving the BWM method were used as the input data of the COCOSO method. After obtaining the weights of the criteria, the COCOSO-G method was exploited to rank the suppliers. Several steps were performed including forming the decision matrix, normalizing the matrix, calculating the weighted multiplication and weighted sum values, calculating the final scores, and eventually ranking the suppliers.
As the main limitations of this research, it can be said that due to the sensitive nature of the field of oil, gas, and petrochemicals, there was very limited access to the information of the relevant projects, so most of the required information could not be easily acquired and was obtained only through several time-consuming negotiations and communications.
For future studies, it is suggested to conduct this research in a project-based or strong matrix organization whose senior managers support the research and provide full access to the information. It is also suggested to use an electronic questionnaire instead of an interview to increase the speed of data collection. Moreover, the proposed method in this study should be implemented in another field, and its effectiveness and efficiency should be examined. Furthermore, other multicriteria decision-making techniques may be applied, and their findings may be compared.

Author Contributions

Conceptualization, A.P.R., M.K., S.A.B. and D.B.; methodology, A.P.R., M.K., S.A.B., D.B. and A.M.; software, A.P.R., M.K., S.A.B. and G.Ć.; validation, A.P.R., M.K., S.A.B., D.B. and G.Ć.; formal analysis, A.P.R., M.K., S.A.B. and A.M.; investigation, A.P.R., M.K., S.A.B. and A.M.; resources, A.P.R., M.K., S.A.B. and G.Ć.; data curation, A.P.R., M.K., S.A.B. and A.M.; writing—original draft preparation, A.P.R., M.K. and S.A.B.; writing—review and editing, A.P.R., M.K., S.A.B., D.B. and A.M.; visualization, A.P.R., M.K., S.A.B. and G.Ć.; supervision, M.K., S.A.B., D.B. and G.Ć.; project administration, A.P.R., M.K., S.A.B. and A.M.; funding acquisition, D.B., A.M. and G.Ć. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Informed Consent Statement

Not applicable.

Data Availability Statement

All research data are presented in the paper.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Yang, Y.; Goodarzi, S.; Jabbarzadeh, A.; Fahimnia, B. In-house production and outsourcing under different emissions reduction regulations: An equilibrium decision model for global supply chains. Transp. Res. Part E Logist. Transp. Rev. 2022, 157, 102446. [Google Scholar] [CrossRef]
  2. Fahimnia, B.; Jabbarzadeh, A.; Sarkis, J. Greening versus resilience: A supply chain design perspective. Transp. Res. Part E Logist. Transp. Rev. 2018, 119, 129–148. [Google Scholar] [CrossRef]
  3. Goodarzi, S.; Fahimnia, B.; Sarkis, J. Sustainable supply chain management and carbon emissions. In Handbook on the Sustainable Supply Chain; Edward Elgar Publishing: Cheltenham, UK, 2019; pp. 377–388. [Google Scholar]
  4. Luthra, S.; Govindan, K.; Kannan, D.; Mangla, S.K.; Garg, C.P. An integrated framework for sustainable supplier selection and evaluation in supply chains. J. Clean. Prod. 2017, 140 Pt 3, 1686–1698. [Google Scholar] [CrossRef]
  5. Malik, M.; Abdallah, S.; Hussain, M. Assessing supplier environmental performance: Applying Analytical Hierarchical Process in the United Arab Emirates healthcare chain. Renew. Sustain. Energy Rev. 2016, 55, 1313–1321. [Google Scholar] [CrossRef]
  6. Tavana, M.; Shaabani, A.; Di Caprio, D.; Bonyani, A. An integrated group fuzzy best-worst method and combined compromise solution with Bonferroni functions for supplier selection in reverse supply chains. Clean. Logist. Supply Chain 2021, 2, 100009. [Google Scholar] [CrossRef]
  7. Hashemi, S.H.; Karimi, A.; Tavana, M. An integrated green supplier selection approach with analytic network process and improved Grey relational analysis. Int. J. Prod. Econ. 2015, 159, 178–191. [Google Scholar] [CrossRef]
  8. Taherdoost, H.; Brard, A. Analyzing the Process of Supplier Selection Criteria and Methods. Procedia Manuf. 2019, 32, 1024–1034. [Google Scholar] [CrossRef]
  9. Dwivedi, P.P.; Sharma, D.K. Application of Shannon entropy and CoCoSo methods in selection of the most appropriate engineering sustainability components. Clean. Mater. 2022, 5, 100118. [Google Scholar] [CrossRef]
  10. Mohammad, N.E.G.; Rawash, Y.Y.; Aly, S.M.; Awad, M.E.S.; Mohamed, M.H.H. Enhancing gas pipeline network efficiency through VIKOR method. Decis. Mak. Appl. Manag. Eng. 2023, 6, 853–879. [Google Scholar] [CrossRef]
  11. Tamala, J.K.; Maramag, E.I.; Simeon, K.A.; Ignacio, J.J. A bibliometric analysis of sustainable oil and gas production research using VOSviewer. Clean. Eng. Technol. 2022, 7, 100437. [Google Scholar] [CrossRef]
  12. Rezaei, J. A Concentration Ratio for Non-Linear Best Worst Method. Int. J. Inf. Technol. Decis. Mak. 2020, 19, 891–907. [Google Scholar] [CrossRef]
  13. Kheybari, S.; Ishizaka, A. The behavioural best-worst method. Expert Syst. Appl. 2022, 209, 118265. [Google Scholar] [CrossRef]
  14. Banihashemi, S.A.; Khalilzadeh, M. Application of fuzzy BWM-CoCoSo to time–cost–environmental impact trade-off construction project scheduling problem. Int. J. Environ. Sci. Technol. 2023, 20, 1199–1214. [Google Scholar] [CrossRef]
  15. Yazdani, M.; Wen, Z.; Liao, H.; Banaitis, A.; Turskis, Z. A grey combined compromise solution (COCOSO-G) method for supplier selection in construction management. J. Civ. Eng. Manag. 2019, 25, 858–874. [Google Scholar] [CrossRef]
  16. Hu, S.; Dong, Z.S.; Lev, B. Supplier selection in disaster operations management: Review and research gap identification. Socio-Economic Plan. Sci. 2022, 82, 101302. [Google Scholar] [CrossRef]
  17. Thevenin, S.; Ben-Ammar, O.; Brahimi, N. Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty. Eur. J. Oper. Res. 2022, 303, 1199–1215. [Google Scholar] [CrossRef]
  18. Abdzadeh, B.; Noori, S.; Ghannadpour, S.F. Simultaneous scheduling of multiple construction projects considering sup-plier selection and material transportation routing. Autom. Constr. 2022, 140, 104336. [Google Scholar] [CrossRef]
  19. Feng, Y.; Liu, Y.; Chen, Y. A robust multi-supplier multi-period inventory model with uncertain market demand and carbon emission constraint. Comput. Ind. Eng. 2022, 165, 107937. [Google Scholar] [CrossRef]
  20. Mohammadivojdan, R.; Merzifonluoglu, Y.; Geunes, J.P. Procurement portfolio planning for a newsvendor with supplier delivery uncertainty. Eur. J. Oper. Res. 2022, 297, 917–929. [Google Scholar] [CrossRef]
  21. Sonar, H.; Gunasekaran, A.; Agrawal, S.; Roy, M. Role of lean, agile, resilient, green, and sustainable paradigm in supplier selection. Clean. Logist. Supply Chain 2022, 4, 100059. [Google Scholar] [CrossRef]
  22. Zaretalab, A.; Sharifi, M.; Guilani, P.P.; Taghipour, S.; Niaki, S.T.A. A multi-objective model for optimizing the redundancy allocation, component supplier selection, and reliable activities for multi-state systems. Reliab. Eng. Syst. Saf. 2022, 222, 108394. [Google Scholar] [CrossRef]
  23. Yazdi, A.K.; Wanke, P.F.; Hanne, T.; Abdi, F.; Sarfaraz, A.H. Supplier selection in the oil & gas industry: A comprehensive approach for Multi-Criteria Decision Analysis. Socio-Econ. Plan. Sci. 2022, 79, 101142. [Google Scholar]
  24. Saputro, T.E.; Figueira, G.; Almada-Lobo, B. A comprehensive framework and literature review of supplier selection under different purchasing strategies. Comput. Ind. Eng. 2022, 167, 108010. [Google Scholar] [CrossRef]
  25. Hosseini, Z.S.; Flapper, S.D.; Pirayesh, M. Sustainable supplier selection and order allocation under demand, supplier availability and supplier grading uncertainties. Comput. Ind. Eng. 2022, 165, 107811. [Google Scholar] [CrossRef]
  26. Shang, Z.; Yang, X.; Barnes, D.; Wu, C. Supplier selection in sustainable supply chains: Using the integrated BWM, fuzzy Shannon entropy, and fuzzy MULTIMOORA methods. Expert Syst. Appl. 2022, 195, 116567. [Google Scholar] [CrossRef]
  27. Finger, G.S.W.; Lima-Junior, F.R. A hesitant fuzzy linguistic QFD approach for formulating sustainable supplier de-velopment programs. Int. J. Prod. Econ. 2022, 247, 108428. [Google Scholar] [CrossRef]
  28. Ahmad, T.; Firouz, M.; Mondal, S. Robust supplier-selection and order-allocation in two-echelon supply networks: A parametric tolerance design approach. Comput. Ind. Eng. 2022, 171, 108394. [Google Scholar] [CrossRef]
  29. Zhou, R.; Bhuiyan, T.H.; Medal, H.R.; Sherwin, M.D.; Yang, D. A stochastic programming model with endogenous un-certainty for selecting supplier development programs to proactively mitigate supplier risk. Omega 2022, 107, 102542. [Google Scholar] [CrossRef]
  30. Masoomi, B.; Sahebi, I.G.; Fathi, M.; Yıldırım, F.; Ghorbani, S. Strategic supplier selection for renewable energy supply chain under green capabilities (fuzzy BWM-WASPAS-COPRAS approach). Energy Strat. Rev. 2022, 40, 100815. [Google Scholar] [CrossRef]
  31. Bonnedahl, K.J.; Heikkurinen, P.; Paavola, J. Strongly sustainable development goals: Overcoming distances constraining responsible action. Environ. Sci. Policy 2022, 129, 150–158. [Google Scholar] [CrossRef]
  32. Sarrakh, R.; Renukappa, S.; Suresh, S. Evaluation of challenges for sustainable transformation of Qatar oil and gas industry: A graph theoretic and matrix approach. Energy Policy 2022, 162, 112766. [Google Scholar] [CrossRef]
  33. Tayebi, M.; Bemani, A.; Fetanat, A.; Fehresti-Sani, M. A decision support system for sustainability prioritization of air pol-lution control technologies in energy and carbon management: Oil & gas industry of Iran. J. Nat. Gas Sci. Eng. 2022, 99, 104416. [Google Scholar]
  34. Matthess, M.; Kunkel, S.; Xue, B.; Beier, G. Supplier sustainability assessment in the age of Industry 4.0–Insights from the electronics industry. Clean. Logist. Supply Chain. 2022, 4, 100038. [Google Scholar] [CrossRef]
  35. Priyanka, E.; Thangavel, S.; Kalavathidevi, T. Miniaturized antenna design for communication establishment of peer-to-peer communication in the oil pipelines. Pet. Res. 2021, 6, 291–302. [Google Scholar] [CrossRef]
  36. Zeqiraj, D. Enhanced oil recovery (EOR) project scheduling with multiobjective of maximum net present value and minimum makesapn. Results Eng. 2022, 13, 100339. [Google Scholar] [CrossRef]
  37. Ghatee, A.; Zarrinpoor, N. Designing an oil supply chain network considering sustainable development paradigm and uncertainty. Chem. Eng. Res. Des. 2022, 184, 692–723. [Google Scholar] [CrossRef]
  38. Menon, R.R.; Ravi, V. Using AHP-TOPSIS methodologies in the selection of sustainable suppliers in an electronics supply chain. Clean. Mater. 2022, 5, 100130. [Google Scholar] [CrossRef]
  39. Ni, W.; Liang, Y.; Li, Z.; Liao, Q.; Cai, S.; Wang, B.; Zhang, H.; Wang, Y. Resilience assessment of the downstream oil supply chain considering the inventory strategy in extreme weather events. Comput. Chem. Eng. 2022, 163, 107831. [Google Scholar] [CrossRef]
  40. Salman, K.; Umar Muhammad, M.; Ather Aziz, R.; Irfan, A. A Personnel Selection Problem in Healthcare System Using Fuzzy-TOPSIS Approach. J. Nonlinear Model. Anal. 2023, 5, 311. [Google Scholar] [CrossRef]
  41. Guo, S.; Zhao, H. Fuzzy best-worst multi-criteria decision-making method and its applications. Knowl.-Based Syst. 2017, 121, 23–31. [Google Scholar] [CrossRef]
  42. Rezaei, J. Best-worst multi-criteria decision-making method. Omega 2016, 53, 49–57. [Google Scholar] [CrossRef]
  43. Dwivedi, P.P.; Sharma, D.K. Application of Shannon Entropy and COCOSO techniques to analyze performance of sustainable development goals: The case of the Indian Union Territories. Results Eng. 2022, 14, 100416. [Google Scholar] [CrossRef]
  44. Yazdani, M.; Zarate, P.; Zavadskas, E.K.; Turskis, Z. A combined compromise solution (CoCoSo) method for multi-criteria decision-making problems. Manag. Decis. 2018, 57, 2501–2519. [Google Scholar] [CrossRef]
  45. Radovanović, M.; Božanić, D.; Tešić, D.; Puška, A.; Hezam, I.M.; Jana, C. Application of hybrid DIBR-FUCOM-LMAW-Bonferroni-Grey-EDAS model in multicriteria decision-making. Facta Univ. Ser. Mech. Eng. 2023, 21, 387–403. [Google Scholar] [CrossRef]
  46. Badi, I.; Academy-Misurata, M.T.L.; Alosta, A.; Elmansouri, O.; Abdulshahed, A.; Elsharief, S. An application of a novel grey-CODAS method to the selection of hub airport in North Africa. Decis. Mak. Appl. Manag. Eng. 2023, 6, 18–33. [Google Scholar] [CrossRef]
  47. Zhou, H.; Wang, J.; Zhang, H. Stochastic multicriteria decision-making approach based on SMAA-ELECTRE with extended gray numbers. Int. Trans. Oper. Res. 2019, 26, 2032–2052. [Google Scholar] [CrossRef]
  48. Zolfani, S.H.; Yazdani, M.; Torkayesh, A.E.; Derakhti, A. Application of a Gray-Based Decision Support Framework for Location Selection of a Temporary Hospital during COVID-19 Pandemic. Symmetry 2020, 12, 886. [Google Scholar] [CrossRef]
  49. Garg, R.K. Structural equation modeling of E-supplier selection criteria in mechanical manufacturing industries. J. Clean. Prod. 2021, 311, 127597. [Google Scholar] [CrossRef]
  50. Rahman, M.; Bari, A.B.M.M.; Ali, S.M.; Taghipour, A. Sustainable supplier selection in the textile dyeing industry: An integrated multi-criteria decision analytics approach. Resour. Conserv. Recycl. Adv. 2022, 15, 200117. [Google Scholar] [CrossRef]
  51. Yeh, W.-C.; Chuang, M.-C. Using multi-objective genetic algorithm for partner selection in green supply chain problems. Expert Syst. Appl. 2011, 38, 4244–4253. [Google Scholar] [CrossRef]
  52. Bektur, G. An integrated methodology for the selection of sustainable suppliers and order allocation problem with quantity discounts, lost sales and varying supplier availabilities. Sustain. Prod. Consum. 2020, 23, 111–127. [Google Scholar] [CrossRef]
  53. Kahraman, C.; Cebeci, U.; Ulukan, Z. Multi-criteria supplier selection using fuzzy AHP. Logist. Inf. Manag. 2003, 16, 382–394. [Google Scholar] [CrossRef]
  54. Sarkis, J.; Talluri, S. A Model for strategic supplier selection. J. Supply Chain Manag. 2002, 38, 18–28. [Google Scholar] [CrossRef]
  55. Chen, Y.; Wang, S.; Yao, J.; Li, Y.; Yang, S. Socially responsible supplier selection and sustainable supply chain development: A combined approach of total interpretive structural modeling and fuzzy analytic network process. Bus. Strat. Environ. 2018, 27, 1708–1719. [Google Scholar] [CrossRef]
  56. Choy, K.; Lee, W.B. A generic tool for the selection and management of supplier relationships in an outsourced manu-facturing environment: The application of case based reasoning. Logist. Inf. Manag. 2002, 15, 235–253. [Google Scholar] [CrossRef]
  57. Sahoo, D.; Tripathy, A.K.; Pati, J.K.; Parida, P.K. A selection of level of supplier in supply chain management using binary coded genetic algorithm with a case study towards Pareto optimality. J. Decis. Anal. Intell. Comput. 2023, 3, 90–104. [Google Scholar] [CrossRef]
  58. Goh, M.; Zhong, S.; De Souza, R. Operational framework for healthcare supplier selection under a fuzzy multi-criteria environment. In Proceedings of the 23rd International Symposium on Logistics (ISL 2018), Bali, Indonesia, 8–11 July 2018. [Google Scholar]
  59. Puška, A.; Beganović, A.; Stojanović, I.; Murtič, S. Green supplier’s selection using economic and environmental criteria in medical industry. Environ. Dev. Sustain. 2022, 1–22. [Google Scholar] [CrossRef]
  60. Al-Sheyadi, A.; Muyldermans, L.; Kauppi, K. The complementarity of green supply chain management practices and the impact on environmental performance. J. Environ. Manag. 2019, 242, 186–198. [Google Scholar] [CrossRef]
  61. Koganti, V.K.; Menikonda, N.; Anbuudayasankar, S.P.; Krishnaraj, T.; Athhukuri, R.K.; Vastav, M.S. GRAHP TOP model for supplier selection in Supply Chain: A hybrid MCDM approach. Decis. Sci. Lett. 2019, 8, 65–80. [Google Scholar] [CrossRef]
  62. Wang, P.; Zhu, B.; Yu, Y.; Ali, Z.; Almohsen, B. Complex intuitionistic fuzzy Dombi prioritized aggregation operators and their application for resilient green supplier selection. Facta Univ. Series Mech. Eng. 2023, 21, 339–357. [Google Scholar] [CrossRef]
  63. Sahoo, S.K.; Goswami, S.S.; Halder, R. Supplier Selection in the Age of Industry 4.0: A Review on MCDM Applications and Trends. Decis. Mak. Adv. 2023, 2, 32–47. [Google Scholar] [CrossRef]
  64. Puška, A.; Kozarević, S.; Stević, Ž.; Stovrag, J. A new way of applying interval fuzzy logic in group decision making for supplier selection. Econ. Comput. Econ. Cybern. Stud. Res. 2018, 52, 217–234. [Google Scholar] [CrossRef]
  65. He, X.; Zhang, J. Supplier Selection Study under the Respective of Low-Carbon Supply Chain: A Hybrid Evaluation Model Based on FA-DEA-AHP. Sustainability 2018, 10, 564. [Google Scholar] [CrossRef]
  66. Bonab, S.R.; Haseli, G.; Rajabzadeh, H.; Ghoushchi, S.J.; Keshteli, M.H.; Tomaskova, H. Sustainable resilient supplier selection for IoT implementation based on the integrated BWM and TRUST under spherical fuzzy sets. Decis. Making: Appl. Manag. Eng. 2023, 6, 153–185. [Google Scholar] [CrossRef]
  67. Milovanović, V.R.; Aleksić, A.V.; Sokolović, V.S.; Milenkov, M.A. UModelovanje neizvesnosti primenom intuitivnih fazi brojeva. Vojn. Glas. 2021, 69, 905–929. [Google Scholar] [CrossRef]
  68. Puška, A.; Nedeljković, M.; Hashemkhani Zolfani, S.; Pamučar, D. Application of Interval Fuzzy Logic in Selecting a Sustainable Supplier on the Example of Agricultural Production. Symmetry 2021, 13, 774. [Google Scholar] [CrossRef]
  69. Ghoushchi, N.G.; Ahmadzadeh, K.; Ghoushchi, S.J. A New Extended Approach to Reduce Admission Time in Hospital Operating Rooms Based on the FMEA Method in an Uncertain Environment. J. Soft Comput. Decis. Anal. 2023, 1, 80–101. [Google Scholar] [CrossRef]
  70. Badi, I.; Stević, Ž.; Bouraima, M.B. Overcoming Obstacles to Renewable Energy Development in Libya: An MCDM Approach towards Effective Strategy Formulation. Decis. Mak. Adv. 2023, 1, 17–24. [Google Scholar] [CrossRef]
Table 1. A summary of the relevant studies.
Table 1. A summary of the relevant studies.
Oil, Gas, and Petrochemical IndustrySustainabilityUncertainty ConditionsData Gathering MethodMethodYearResources
Interview with ExpertsOrganizational DataSystematic ReviewNonfuzzyFuzzy
2019[8]
2022[9]
2022[14]
2022[15]
2022[16]
2022[17]
2022[18]
2022[19]
2022[20]
2022[21]
2022[22]
2022[23]
2022[24]
2022[25]
2022[26]
2022[27]
2022[28]
2022[29]
2022[32]
2022[33]
2022[34]
2021[35]
2022[36]
2022[37]
2022[38]
2022[39]
-This study
Table 2. Transformation rules of the linguistic variables associated with the decision-makers’ verbal judgments.
Table 2. Transformation rules of the linguistic variables associated with the decision-makers’ verbal judgments.
Linguistic TermsAbbreviated PhraseMembership Function
Equally importance(EI)(1, 1, 1)
Weakly important(WI)(2/3, 1, 3/2)
Fairly important(FI)(3/2, 2, 5/2)
Very important(VI)(5/2, 3, 7/2)
Absolutely important(AI)(7/2, 4, 9/2)
Table 3. Consistency Index (CI) for the fuzzy BWM.
Table 3. Consistency Index (CI) for the fuzzy BWM.
Linguistic Terms a ~ B W CI
Equally importance (EI)(1, 1, 1)3.00
Weakly important (WI)(2/3, 1, 3/2)3.80
Fairly Important (FI)(3/2, 2, 5/2)5.29
Very important (VI)(5/2, 3, 7/2)6.69
Absolutely important (AI)(7/2, 4, 9/2)8.04
Table 4. Supplier selection criteria.
Table 4. Supplier selection criteria.
CriteriaResources
Quality, geographical location, and project expectations[8]
Cost, quality, and delivery method[49]
Delivery time, price, health and safety of employees, and environmental management system[50]
Price and quality[51]
Reputation and position in the industry, reliability of delivery, attention to environmental issues, waste management, and safety and health of employees[52]
Cost, quality, and capability[53,54]
Payment method and price[53]
Research and development[55]
Experts’ expertise, technical capability, and organization size[56]
Cost, quality, service, and capacity[57]
Geographical location and political stability[58]
Environmental and economic criteria[59]
Strategy and communication[60]
Market and desire[61]
Response rate, capability for unexpected disruptions, capability for
reverse logistics, sustainable product design, and long-term relationship
[62]
Cybersecurity, digital collaboration, and the internet of things integration[63]
Additional discount on quantity, certification of the
product, price, quality, warranty period, method of payment, reputations, delivery time, and reliability
[64]
Reputation and financial aspect[65]
Environmental management system, green products, green finance, pollution control, reuse and recycle, vulnerability and reaction, risk taking, the capacity to return to the initial state, and adaptation[66]
Business, customer relations, technology and
logistics
[67]
Ecological, social, and economic[68,69,70]
Table 5. Expert information and interviews.
Table 5. Expert information and interviews.
ExpertGenderQualificationExperienceNumber of InterviewsDuration of Each InterviewTotal (Hour)
1MaleMastersMore than 30 years428
2MaleMastersBetween 20 and 30 years339
3MalePh.D.Between 20 and 30 years224
4MalePh.D.Between 15 and 20 years224
5FemaleMastersBetween 15 and 20 years236
Total interview hours31
Table 6. Finalized criteria for sustainable supplier selection in the oil, gas, and petrochemical industry.
Table 6. Finalized criteria for sustainable supplier selection in the oil, gas, and petrochemical industry.
CategoryAbbreviated PhraseFinalized CriteriaAbbreviated Phrase
SustainabilityC1Health and safety of employeesC11
Attention to environmental issuesC12
Waste managementC13
FinancialC2PriceC21
Settling an account methodC22
Expertise and experienceC3Reputation and position in the industryC31
Familiarity with the conditions, culture, language and environmental conditions at the project siteC32
Experience in similar projectsC33
TechnicalC4Optimal and applicable scheduleC41
The suitability of the company’s expertise with the technical characteristics of the projectC42
Providing a complete and accurate proposalC43
QualityC44
Delivery methodC45
Table 7. Comparison table of the best criterion with other criteria in general categories.
Table 7. Comparison table of the best criterion with other criteria in general categories.
CriteriaC1C2C3C4
Best criterion C2AIEIVIFI
Worst criterion C1EIAIFIVI
Table 8. Fuzzy weights table of the criteria and defuzzified weights (for expert one).
Table 8. Fuzzy weights table of the criteria and defuzzified weights (for expert one).
CriteriaCriteria’s WeightsDefuzzified Weights
C1(0.0918, 0.1029, 0.1029)0.101
C2(0.4021, 0.4506, 0.4506)0.443
C3(0.1457, 0.1738, 0.1921)0.172
C4(0.2153, 0.2829, 0.3855)0.284
Table 9. Finalized criteria and their final weights.
Table 9. Finalized criteria and their final weights.
CategoryFinalized CriteriaAbbreviated PhraseWeight (Expert 1)Weight (Expert 2)Weight (Expert 3)Weight (Expert 4)Weight (Expert 5)Final Weight
SustainabilityHealth and safety of employeesC110.0290.0160.0350.0710.1370.057
Attention to environmental issuesC120.0140.0270.0140.0320.0430.026
Waste managementC130.0580.0580.050.1560.0780.080
FinancialPriceC210.3320.3320.2540.2400.2720.286
Settling an account methodC220.1110.1110.1280.1210.0910.113
Expertise and experienceReputation and position in the industryC310.0570.0640.1580.0550.0490.076
Familiarity with the conditions, culture, language and environmental conditions at the project siteC320.0220.0290.0450.0240.0180.027
Experience in similar projectsC330.0930.0790.1090.0680.0790.086
TechnicalOptimal and applicable scheduleC410.0550.0630.0520.0250.0250.044
The suitability of the company’s expertise with the technical characteristics of the projectC420.0320.0250.0190.0340.0350.029
Providing a complete and accurate proposalC430.0250.0370.0410.0200.0190.028
QualityC440.0960.0650.0700.0780.0780.078
Delivery methodC450.0760. 0940.0250.0760.0760.070
Table 10. Suppliers’ scores based on each criterion using gray numbers (for expert one).
Table 10. Suppliers’ scores based on each criterion using gray numbers (for expert one).
CriteriaC11C12C13C21C22C31C32C33C41C42C43C44C45
Supplier
S1[70, 75][55, 65][60, 65][65, 70][70, 80][70, 75][50, 55][75, 90][85, 90][80, 85][75, 85][80, 85][55, 65]
S2[30, 45][40, 50][10, 25][30, 40][50, 60][25, 30][40, 45][25, 35][10, 20][40, 50][15, 20][50, 55][70, 80]
S3[65, 70][80, 85][80, 85][5, 15][10, 20][60, 70][30, 35][75, 85][80, 85][80, 90][25, 35][65, 75][80, 90]
S4[70, 80][70, 75][50, 60][50, 55][50, 60][50, 60][20, 35][65, 75][60, 70][85, 95][30, 40][80, 85][30, 40]
S5[80, 85][70, 75][40, 50][50, 60][30, 40][40, 55][55, 60][60, 65][75, 85][65, 75][80, 90][75, 85][40, 55]
S6[80, 85][80, 85][75, 90][20, 30][25, 30][80, 90][70, 75][80, 90][60, 70][90, 95][85, 90][80, 85][45, 55]
Table 11. Average scores of suppliers for each criterion using gray numbers (initial decision matrix).
Table 11. Average scores of suppliers for each criterion using gray numbers (initial decision matrix).
CriteriaC11C12C13C21C22C31C32C33C41C42C43C44C45
Supplier
S1[59, 70][50, 61][47, 57][50, 62][71, 80][50, 66][51, 65][53, 72][82, 91][67, 80][57, 75][75, 85][48, 60]
S2[39, 50][40, 49][30, 37][36, 45][47, 57][23, 33][36, 47][23, 36][25, 38][39, 52][30, 39][43, 58][50, 63]
S3[43, 58][64, 73][69, 76][14, 28][24, 36][48, 61][41, 49][62, 76][75, 87][72, 85][39, 51][62, 71][64, 79]
S4[49, 62][58, 67][48, 62][41, 51][58, 71][46, 55][24, 40][59, 75][58, 75][66, 84][39, 53][62, 74][16, 29]
S5[57, 65][60, 70][45, 59][43, 52][35, 49][41, 55][48, 61][49, 62][74, 84][68, 80][69, 75][66, 77][31, 48]
S6[60, 72][68, 77][75, 84][34, 48][22, 33][65, 79][55, 67][72, 89][68, 77][83, 94][71, 82][75, 85][20, 33]
Table 12. Normalized matrix of the suppliers.
Table 12. Normalized matrix of the suppliers.
C11C12C13C21C22C31C32C33C41C42C43C44C45
S1[0.61, 0.94][0.27, 0.57][0.31, 0.5][0, 0.25][0, 0.16][0.48, 0.77][0.63, 0.95][0.45, 0.74][0.86, 1][0.51, 0.75][0.52, 0.87][0.76, 1][0.51, 0.7]
S2[0, 0.33][0, 0.24][0, 0.13][0.35, 0.54][0.4, 0.57][0, 0.18][0.28, 0.53][0, 0.12][0, 0.2][0, 0.24][0, 0.17][0, 0.36][0.54, 0.75]
S3[0.12, 0.58][0.65, 0.89][0.72, 0.85][0.71, 1][0.76, 0.97][0.45, 0.68][0.4, 0.58][0.59, 0.8][0.76, 0.94][0.6, 0.84][0.17, 0.4][0.45, 0.67][0.76, 1]
S4[0.3, 0.7][0.49, 0.73][0.33, 0.59][0.23, 0.44][0.16, 0.38][0.41, 0.57][0, 0.37][0.55, 0.79][0.5, 0.76][0.49, 0.82][0.17, 0.44][0.45, 0.74][0, 0.21]
S5[0.55, 0.79][0.54, 0.81][0.28, 0.54][0.21, 0.4][0.53, 0.78][0.32, 0.57][0.56, 0.86][0.39, 0.59][0.74, 0.89][0.53, 0.75][0.75, 0.87][0.55, 0.81][0.24, 0.51]
S6[0.64, 1][0.76, 1][0.83, 1][0.29, 0.58][0.81, 1][0.75, 1][0.72, 1][0.74, 1][0.65, 0.79][0.8, 1][0.79, 1][0.76, 1][0.06, 0.27]
Wi0.0570.0260.080.2860.1130.0760./0270.0860.0440.0290.0280.0780.07
Table 13. Calculation of Si and Pi values.
Table 13. Calculation of Si and Pi values.
Supplierssipi
S1[0.321, 0.563][10.605, 12.330]
S2[0.191, 0.394][3.566, 11.969]
S3[0.610, 0.855][12.443, 12.824]
S4[0.295, 0.538][10.025, 12.362]
S5[0.389, 0.613][12.068, 12.505]
S6[0.575, 0.820][12.344, 12.758]
Table 14. Calculation of the Hia, Lia, and Mia values.
Table 14. Calculation of the Hia, Lia, and Mia values.
SuppliersHiaLiaMia
S1[0.139, 0.203][4.657, 6.41][0.799, 0.943]
S2[0.048, 0.195][2, 5.421][0.275, 0.904]
S3[0.166, 0.216][6.688, 8.81][0.954, 1]
S4[0.131, 0.203][4.356, 6.288][0.754, 0.943]
S5[0.159, 0.207][5.426, 6.723][0.911, 0.959]
S6[0.164, 0.214][6.475, 7.876][0.944, 0.993]
Table 15. The final ranking obtained by the COCOSO-G method.
Table 15. The final ranking obtained by the COCOSO-G method.
SuppliersKiObtained ScoresRankings
S1[2.037, 2.928]0.3043
S2[0.783, 2.492]0.6861
S3[2.956, 3.976]0.2574
S4[1.89, 2.88]0.3442
S5[2.427, 3.075]0.2115
S6[2.862, 3.586]0.2026
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Parsa Rad, A.; Khalilzadeh, M.; Banihashemi, S.A.; Božanić, D.; Milić, A.; Ćirović, G. Supplier Selection in Downstream Oil and Gas and Petrochemicals with the Fuzzy BWM and Gray COCOSO Methods Considering Sustainability Criteria and Uncertainty Conditions. Sustainability 2024, 16, 880. https://doi.org/10.3390/su16020880

AMA Style

Parsa Rad A, Khalilzadeh M, Banihashemi SA, Božanić D, Milić A, Ćirović G. Supplier Selection in Downstream Oil and Gas and Petrochemicals with the Fuzzy BWM and Gray COCOSO Methods Considering Sustainability Criteria and Uncertainty Conditions. Sustainability. 2024; 16(2):880. https://doi.org/10.3390/su16020880

Chicago/Turabian Style

Parsa Rad, Alireza, Mohammad Khalilzadeh, Sayyid Ali Banihashemi, Darko Božanić, Aleksandar Milić, and Goran Ćirović. 2024. "Supplier Selection in Downstream Oil and Gas and Petrochemicals with the Fuzzy BWM and Gray COCOSO Methods Considering Sustainability Criteria and Uncertainty Conditions" Sustainability 16, no. 2: 880. https://doi.org/10.3390/su16020880

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop