Article

Project Portfolio Selection of Solar Energy by Photovoltaic Generation Using Gini-CAPM Multi-Criteria and Considering ROI Covariations

by
José Claudio Isaias
1,
Pedro Paulo Balestrassi
1,
Guilherme Augusto Barucke Marcondes
2,
Wesley Vieira da Silva
3,
Carlos Henrique Pereira Mello
1 and
Claudimar Pereira da Veiga
4,*
1
Institute of Industrial Engineering and Management, Federal University of Itajubá, Itajubá 37500-903, Brazil
2
Department of Computer Science, National Institute of Telecommunications, Santa Rita do Sapucaí 37504-000, Brazil
3
Faculty of Economics, Administration and Accounting, Federal University of Alagoas, Maceió 57072-970, Brazil
4
Department of General and Applied Administration, Federal University of Parana, Curitiba 80210-170, Brazil
*
Author to whom correspondence should be addressed.
Energies 2021, 14(24), 8374; https://doi.org/10.3390/en14248374
Submission received: 3 November 2021 / Revised: 4 December 2021 / Accepted: 7 December 2021 / Published: 12 December 2021
(This article belongs to the Section C: Energy Economics and Policy)

Abstract

:
For some time, renewable solar energy generations using cellular photovoltaic panels have stood out among the options, especially in the segment of micro and small companies, where the return on investment is usually higher. In this context, when micro and small companies do not have the capital for the enterprises, several others, mainly small ones, have emerged to finance. However, significant difficulties occur for financiers in selecting investment portfolios, especially when considering the trade-off between return and risk and the covariations of return on investment, which are very common. In this type of selection, the Capital Asset Pricing Model criteria using the Gini risk can help significantly because this one is a more robust risk coefficient for assessments of non-normal probability distributions. However, searches for methods that meet the selection needs using the adjacent criteria are unsuccessful. Thus, this work seeks to help minimize the gap by presenting a new method for selection using the criteria. Historical and simulations data stochastic evaluations indicate that the portfolios selected by the method are attractive options for implementations. These portfolios have reasonable probabilistic expectations and satisfactory protection to avoid mistakes caused for not considering covariations in return on investment, which indicates a significant advance on the current knowledge frontier and will likely allow the increased use of the concept. The method also presents theoretical contributions in adaptations of the benchmark models, which help to minimize the adjacent literary gap of similar methods.

Graphical Abstract

1. Introduction

The world is being held hostage to non-renewable energy sources, which is a significant problem. As the resource is limited, it has become the center of conflicts in several segments: economic, market, ideological, and military, among others [1]. Moreover, with the advance of demanding technologies and the population in general, energy consumption is significantly increasing, which will cause the reserves of non-renewable sources to end quickly [1,2].
The growing energy demand is undoubtedly one of the significant challenges today. Its segmental conflicts generate dire consequences for society, such as political barriers, underdevelopment, hunger, and wars [3]. Therefore, the constant change in the world energy matrix towards more excellent renewable sources is desirable, especially if the fossil and nuclear options have significant reductions [4,5].
An excellent and desired feature of renewable energy sources is reducing CO2, which significantly degrades the ozone layer and intensifies the greenhouse effect. The undesirable gas comes from fossil fuel consumption representing approximately more than 80% of the world matrix [6,7]. In addition, RES offers several other benefits. With technological advances, their use for the business sector becomes increasingly robust, mainly due to reductions in investment costs, a fundamental characteristic, as the business segment has excellent power to leverage RES [8].
Among renewable energy sources, solar photovoltaic stands out for its great potential due to the increasingly affordable cost of implementation. It is clean, sustainable, and has a significant margin for generation and growth. With the emergence of smart grids, the photovoltaic solar system has become increasingly interesting to complement traditional distribution networks, micro-networks, and smart homes, among others [9,10].
In renewable sources, solar energy by photovoltaic cells (SEPC) has been the first option of the current society to correct the energy matrix. The choice is mainly due to the significant benefits of the technology. Also, it is essential to note that they are among the most sustainable, do not emit pollutants or use scarce raw materials, and reduce noise pollution. They also do not require exhaustive maintenance, can last up to 2.5 decades at least, and have a considerably reduced payback [11,12,13].
As solar energy by photovoltaic cells (SEPC) is a relatively new technology, there is no well-defined policy for its implementation in general. Some countries offer significant incentives, while others impose substantial taxes. Generally, developed countries are encouraging, and developing countries charge large taxers [14,15,16]. Small and micro companies typically receive significant incentives for the implementation of SEPC. However, in developing countries, the sector is in constant economic and financial recession, often caused by inappropriate policies and legislation for the medium-term and long-term [17,18,19].
Due to the justifications, the models, methods, procedures, and programming, among others, emerge from developing the SEPC technology [20,21,22,23]. However, the SEPC project portfolio analysis and selection (PPAS) is still deficient. In other words, we found some models to perform the selection, but they are few, do not consider the risk and return trade-off, and do not consider the covariations (nor the most important, of the risk of return on investment—ROI), among others [24,25,26,27]. The covariations (also called interdependence) between projects can occur in any input or output parameters in the adjacent portfolio. It is simply the formation of portfolios with two or more components. Among the options, the covariations of ROI risk parameters are the most significant [28,29].
The Gini Capital Asset Pricing Model (Gini-CAPM) is an appropriate methodology to contribute to the presented questions’ solutions. The model has several benefits when used for asset portfolio management. Because it derives from the Modern Portfolio Theory (MPT), the methodology fully considers the interactions between portfolio assets. These interactions, in turn, can strongly influence the results [30,31].
The Gini-CAPM mainly arose because we shouldn’t apply the traditional CAPM risk measure (the variance) in in non-normal variables. Still, its conceptual basis in the mean-variance (MV) model is an obstacle to developing methodologies for applications in PPAS. The reason is why, in PPAS, the assets have non-normal random variables and parameters [31,32,33].
Among several options tested as alternatives to variance, the so-called Gini risk coefficient stands out. Its concept is as intuitive as that of standard deviation. Moreover, it is mathematically a more robust metric to applications in non-normal distributions. And this is due to the structure of its probability density function [34,35,36]. The Gini coefficient can replace the standard deviation to minimize the main obstacle for applying CAPM in non-normal distributions. This development is the so-called Gini-CAPM [31,32].
However, photovoltaic cells work in volatile environments concerning climatic and environmental conditions, which generally significantly influences the actual power generation capacity, as it alters the adjacent parameters themselves. Furthermore, the most comprehensive analytical methods would be needed to consider the various assumptions and operating conditions for using cellular photovoltaic generation systems [37]. On the other hand, the stability of photovoltaic cells in the environments where they work is essential, mainly when the environment in question differs considerably from the ideal. Among the various factors that can interfere in the level and quality of generation, temperature and humidity are among the most critical that affect photovoltaic stability. Nevertheless, these same two factors are significant causes of accelerated degradation of optoelectric and material properties [38].
Thus, with this study, we can contribute scientifically and significantly according to the justifications presented, seeking to solve identified problems and minimizing the literary gaps found. In summary, the proposal is a method for appreciation, evaluation, and publication in the renowned Energies Journal. We structured the method for applications in PPAS SEPC, using multi-criteria similar to the Gini-CAPM, considering the possible Gini-covariations of ROI, and in an innovative way. We organized the study to present as follows: Section 2 shows the essential concepts used for the design of the method; Section 3 presents the materials and methods used in conducting the study; Section 4 presents the method application and results discussions; and finally, Section 5 presents the major research conclusions.

2. Literature Review

In this section, we presented the fundamental theoretical concepts to the research. These concepts refer to the Gini correlation coefficient and the Gini variations/covariations of return on investment. The other essential concepts for the new method are in Section 3.2 with adaptations, or theoretical contributions, for applications in PPAS. In fact, in this section, we present the fundamental theoretical concepts, but the theoretical contributions of the research are in Section 3.2. Thus, the search for advancement in the frontier of knowledge is in Section 3.2, where existing methods and models are modified and adapted to the needs of this research in an innovative way. Therefore, in Section 3.2 are the contributions to help minimize the identified literary gap.

2.1. Gini Correlation Coefficient

It is vital to consider the iterations or interferences that the composition of the portfolios may cause. These interferences represent a great source of risk [27,39]. To consider interactions between assets is a level of precaution that presupposes financial management, and in this sense, CAPM is the most used methodology for asset management throughout history [40,41]. The Gini-CAPM is a more appropriate methodology for project portfolio management [32,42].
As in the method media-Gini (MG), in Gini-CAPM, we can derive the efficient portfolios similar to MV way analytically. For this, if we imposed the same restrictions as the MV model, these MG portfolios can also be obtained using optimization techniques for restricted minimization problems [31]. However, there is an essential difference between the derivations of MG concerning those of MV, where MG has two correlation coefficients between each pair of assets. At the same time, those from MV are associated with only the well-known Pearson correlation coefficient [32].
We can describe the values of the random return variables of the distributions of assets i and j as r i and a r j ; its two possible correlation coefficients of Gini between the assets Γ i j and Γ j i ; and, finally, F ( r i ) and F ( r j ) as the values of the cumulative probability density distribution for r i and r j . Thus, we can describe the Gini correlations in Equation (1) [31,32].
Γ i j = c o v [ r i , F ( r j ) ] c o v [ r i , F ( r i ) ]                 Γ j i = c o v [ r j , F ( r i ) ] c o v [ r j , F ( r j ) ]

2.2. Projects ROI Variations and Covariation

The covariations between projects can occur in any input or output parameters in the adjacent portfolio simply by the composition of at least two assets. A classical and more significant covariation between project portfolios is the ROI risk [43,44]. In the sets with two projects j 2 , both Gini correlation coefficients described in Equation (1) are necessary to break down individual ROI risk contributions by combinations of assets in pairs [28,29]. The two Gini correlation coefficients are not necessarily equal, and they will be identical only if the distributions of i and j are interchangeable in a linear transformation [45,46,47].
In measuring the Gini variation (or individual Gini risk) together with the covariation of a portfolio Δ p 2 between two assets i and a j according to Equation (2), it is necessary to consider that: α i and α j are the proportions of assets i and j in the portfolio, and Δ i and Δ j are the Gini risks referring to the same assets [31,32]. Both Gini correlation coefficients described in Equation (1) are necessary to break down individual risk contributions into combinations of assets [32].
Δ p 2 = α i 2 Δ i 2 + α j 2 Δ j 2 + 2 α i Δ i α j Δ j [ ( Γ i j + Γ j i ) /   2 ]
However, researchers in the scientific community generally assume that the correlation coefficients of Gini Γ i j and Γ j i are equal [31,32]. By the structure of the Gini covariation mapping in Equation (2), the components or terms of the same are for i = 1   ( n 1 ) and for j = 2   n , and on the main diagonal is the individual Gini variation conform Equation (3) [28,29].
Analyzing Equation (3), it is possible to state in this case, the mapping of the Gini variation added to the Gini covariation is identical to that of the variance and covariance [48].
Δ p 2 = α i 2 Δ i 2 + α j 2 Δ j 2 + 2 α i Δ i α j Δ j ( Γ i j )

3. Materials and Methods

This section presents the method development to seek the objectives and detailed guidelines for reproducing the application. The research proposes a method to PPAS, using multi-criteria similar to Gini-CAPM, considering ROI covariations, and for SEPC application, and for use by small businesses in selecting microgeneration. Figure 1 shows the synthesized method sequence.

3.1. Method Assumptions

This section presents only the most relevant assumptions that differ between the original CAPM and the “Gini-CAPM for projects” introduced in this work. The identical premises for both we have not discussed here, and we consider them to be valid. The first assumption derived from the CAPM states that “data on returns from the assets under study have normal probabilities distributions” [49,50]. This conceptual foundation (derived from the MV model) is the main barrier to developing a methodology similar to Gini-CAPM but specific for PPAS. Therefore, the first assumption is not acceptable for this research’s method. The reason is that method uses a risk measure, the Gini coefficient, that is less restrictive.
Another essential Gini-CAPM assumption states that “the assets are divisible, that is, it is possible to obtain and retain assets fractions following the investment strategies adopted” [51,52]. However, this assumption is not valid for the method because this is not a reality observed in selecting project portfolios.
Among the implications of not validating the last premise, it highlights the possibility of non-compliance with optimality conditions according to the method reference models (developed for continuous assets). Therefore, negative consequences arise, and among them is that which prevents the use of base algorithms towards the gradient for the solutions of the new method. It is a pity because these algorithms are very efficient in solving adjacent mathematical models.
In projects, the most critical input data, the returns mean, are estimated in probability distributions, commonly binomials, triangular, or beta types [50,53,54]. Among the distribution types, those recommended are the triangular or betas. The reason is that both have the three-point technical calls to define their parameters, and therefore, the estimation occurs in a more efficient form [33]. Based on the references cited, the mean return distribution adopted for the method is triangular. Therefore, it stands out concerning the second possibility because its parameters are more intuitive and allow for less intense calculations required.
CAPM is a methodology that can indicate an optimal portfolio in excess returns per unit of deviation risk, which is the one with the highest Sharpe ratio. This portfolio is supposed to the more representative in the financial securities scenario, and it is the best estimate of the market [55,56]. Therefore, this research has this portfolio as the market index, as detailed in Section 4.
The last assumption implies another of great importance for the method. Its applications discarded all the composition strategies with a portfolio similar to that of the market. This applies to all possible operations: short, long, leveraged, hybrid, and others. The premise assumes that the portfolio similar to the market is optimal but not differentiable. The last assumptions certainly increase the method acceptability by the scientific community imposing a more realistic structure. However, it is essential to infantize that the composition with the risk-free rate for capital available and uninvested is possible.

3.2. Problem Variables and Mathematical Modelling and Development

Despite having a new proposal, the method which our research presents is simple. The study proposes a project portfolio select method of SEPC using multi-criteria similar to the Gini-CAPM. The aim is to propose a structured way for small and micro investors to choose SEPC project portfolios. Also, due to the legislation’s incentives, the scope of dimension limits is small and micro companies. The reason is that national legislation allows more advantageous uses of photovoltaic energy in this companies’ dimension.
However, changes in solar cell parameters in the application environment are significant, mainly due to heat and humidity. Therefore, it would be necessary several tests to verify the absolute reliability and durability of the equipment according to their respective installation locations. A significant factor that must be considered is the temperature, which usually varies a lot between periods of day and night. Thus, comparative studies are essential to determine the actual efficiency, as well as the useful life of photovoltaic cell systems. The ageing of photovoltaic modules due to high levels of heat and humidity is also very strategic in considering the life and efficiency of the modules [57,58].
However, another initial definition of data to the method application is the risk-free rate R f . This rate represents a scalar value, and generally, its adopted value corresponds to the national treasury bills. In practice, it means the minimum level of profitability without risk to a country. However, also it is possible to follow organizational particularities such as minimum rates of attractiveness.
Another critical input parameter is the ROI that each project will offer. For this, we need dates to calculate the cash flows of all projects accordingly and then generate a matrix R i j , where i = 1   m represents the distribution parameters of each project from j = 1   n .
In the matrix R i j , each term T in dimension i represents, respectively, the minimum, the most probable, and the maximum value of the triangular probability distributions for each project j . The values must be estimated according to organizational convenience, for example, using the Program Evaluation and Review Technique (PERT). The PERT t also receives the name of “Three-Point Estimation” and is more recommended by the ©PMBOK bestseller [33].
R i j = [ T 11 T 1 n T 31 T 3 n ]
At this moment in the method the Gini correlation matrix Γ j j should be established. The matrix is necessary to calculate the Gini’s covariations between projects, the Beta-Gini, and the Gini price. “There are other established project estimation methodologies, according to PMI (2017) [33], such as the parametric, or any other, as appropriate (analogues, by the experts, bottom-up, PERT, among others”.
We can describe the values of the random return variables of the distributions of assets j and j as r j and a r j ; its two possible Gini correlation coefficients between the assets as Γ j j and Γ j j and, finally, F ( r j ) and F ( r j ) as the values of the cumulative probabilities densities distributions for r i and a r j , are strictly according to Equation (1).
In addition, with the information available, it is possible to calculate the individual Gini risk Δ j of each asset, and the contributions of that risk by forming portfolios mapped in pairs Δ j j concerning ROI. We can describe the ROI variations and covariation by Δ s 2   . Still, Equation (3) presents the formulation for Gini risk calculating intuitively. Also intuitive is the formulation for the individual calculation of the Gini risk in Equation (5) [32].
Δ j = 2 C o v a r ( x j , F ( x j ) )
It is important to emphasize that, from this point on in this section, the models presented receive adaptations for application in the scenario (PPAS). According to research in the Web of Science and the Scopus database, the transformations represent theoretical contributions.
The next step is to calculate the optimal market portfolio G S s * similar to that of Sharpe from Gini-CAPM. This portfolio is not differentiable as its calculation does not have the constraint of x j [ 0 , 1 ]   for   all   j = 1   n . The set of equations from Equation (6) to Equation (10) are necessary and sufficient to determine the optimal portfolio G S s * . In Equation (6) to Equation (10), we have not yet described L , which represents the desired lower ROI limit, P i j x j , which is the investment cost value of each project segmented by period i ; B represents the upper limit of total spending on investments, and z j is the respective vector of maximum investment values.
Max   G S s * = [ ( i = 1 m j = 1 n r i j x j z j ) r f   ] .   { 2   C o v a r   [ r i j x j z j ,   F   ( r i j x j z j ) ] } 1
s . t . i = 1 m j = 1 n r i j x j z j   L
i = 1 m j = 1 n P i j x j z j   B
j = 1 n x j z j 1
G P s = R f + ( R m R f ) { 2   C o v a r   {   r i j x j z j ,   [ F ( R m ) ] } / Δ m }
The optimal portfolio with x j * according to model Equation (6) to Equation (10) is necessary to calculate the non-diversifiable Gini risk and Gini price. Also, according to CAPM and Gini-CAPM, x j * presents the maximum excess of return per unit of risk, the maximum deviation from the mean in units of risk to R f , and the minimum probability of returns less than R f , among others.
In the method, now we can elaborate on the boundaries of risk and return. These boundaries are similar to Sharpe from Gini-CAPM and could make the application more intuitive. We used these boundaries in the application of Section 4. The boundaries are the continuous and similar optimal market portfolios to CAPM, the discrete and real or feasible, and similar to the market line, the discrete and real or feasible, and similar to the market line by R f compositions.
At this point in the method, we arrive at the first selection criterion. For this, we must apply Equation (11) under the restrictions of the expression Equations (12) and (13), where the model does not assume optimized solutions but all possibilities. The value resulting from Equation (11) is the index G S s , derived from the Sharpe index, and uses the Gini coefficient as a risk metric. The portfolio x j *   [ 0 , 1 ] in this case is differentiable. Then, it is really the best option in excess of return per unit of risk, in deviation from the average in units of risk, with the minimum probability of undesirable returns, among others.
G S S = [ ( i = 1 m j = 1 n r i j x j z j ) R f   ] .   { 2   C o v a r   [ r i j x j z j   ,   F   ( r i j x j z j ) ] } 1
  x j [ 0 , 1 ]       for   all   j = 1   n
  0 z j 1         for   all   s = 1   n
Following the method, we have the necessary information to calculate the non-diversifiable risk values of the portfolios to use as a second selection criterion. We can use the non-diversifiable Gini-risk to make accurate decision-making. A classic definition of non-diversifiable risk Beta is the expected relationship between excess returns for a given portfolio and excess returns for the market portfolio.
Equation (14) presents the Beta-Gini non-diversifiable risk. As the name implies, this index is where it is not possible to eliminate it through diversification. However, on the other hand, knowing values and learning how to manipulate them is strategic. Equation (14) must be applied considering j = 1 n and x j   [ 0 , 1 ] , for all C s j s = 1 p , and p = 2 n 1 , and under the restrictions of the expression Equations (12) and (13).
  B G S = 2   C o v a r   [   r i j x j z j ,   ( F C ( R m ) ] / Δ m
Aiming to make the method more intuitive and understandable, the similar graphical representation of the market line is strategic at this moment. We used this graph in the application seen in Section 4. Thus, we can represent the variation of ROI by non-diversifiable risk for all the differentiable portfolio options. Over time we hope to identify that assets to move in the same direction in the capital markets, albeit in different proportions. For example, assets try to go up when the market goes up, but according to their Beta risk. Therefore, the non-diversifiable risk is essential and strategic information.
Now we calculate Gini’s pricing values. These are the third selection criterion. According to Gini-CAPM, this pricing can indicate the return rate according to the non-diversifiable risk of an asset. Moreover, the rate, compared to what the asset can offer, can indicate opportunities. Equation (15) presents the formula for Gini-CAPM pricing, and again we must apply the equation under the restrictions of Equations (12) and (13).
G P s = R f + ( R m R f ) { 2   C o v a r   {   r i j x j z j ,   [ F ( R m ) ] } / Δ m }
And finally, it is now necessary to use a tool to weigh the criteria, classify the investment options, and highlight the best opportunities. For this purpose, we use Analytic Hierarchy Process (AHP), which is a multi-criteria decision method based on hierarchical structuring. With the AHP, we can structure the problem using criteria to evaluate, and for this, we must use hierarchical diagrams structured to compare. The choice of the AHP model is because the model is the most applied in decisions based on multiple criteria that involve complexity. The pseudocode in Appendix A summarizes the steps of the method that we detailed in that section.

4. Method Application

This section evaluates the specific scenario where the method is applied, executes the application in a real case, and uses the application for results discussions. The scenario assessment is necessary to identify the project’s characteristics to adjustments in the method, according to the dimensions, inputs features, country legislation, strategies adopted, etc. The results and discussions present inferential graphs and tables, always accompanied by interpretations to support selection.

4.1. Scenario Specificities

According to the scope of the research, to apply the method, we chose project options for small and micro companies, where a monthly consumption level is approximately 3500 kWh. This level of consumption is strategic to comply with the range that receives the most significant incentives from the country’s legislation. The enterprise that accepted participating in the study is a small electrical installations company located in Machado city, Minas Gerais, Brazil. It saw the opportunity to offer finance to small and micro businesses in the region in installations of SEPC, which has provided some service in recent years. The financing proposals offer legal procedures for authorization, equipment, installations, and maintenance during the amortization period.
The repaying period for financing is 144 months, with payments at the end of all of them and in amounts proportional to only 85% of the price charged by the energy concessionaire. Therefore, at the financing end to micro and small companies, the installation will be fully amortized and still have a useful life of at least 13 years (according to guarantees from the equipment suppliers). Furthermore, the micro and small businesses will have the opportunity to use the equipment and still depreciation and the reduction in interest on the financing can be used to leverage their real profits.
However, the benefits are not only concentrated for the environment and for the micro and small companies that will be able to install the SEPC, but also for the small electrical installation company that is offering the financing. It will also significantly benefit from returns on investment with a high degree of attractiveness and low-risk activity. The ROI values calculated by the small enterprise and by the method are in Section 4.2.
In the method we did not discard the form of the small financing company’s ROI predictions. However we considered that form has excellence, and its values are compared with method pricing to identify opportunities. Also, we used both ROI values to compose a first cut-off line for the study, but in conjunction with high levels of Gini risk, very unfavourable Gini correction, necessary initial investments far above average, and production capacity. In this case, among the 19 initial project options, only 11 remained eligible.
We used the Maximin strategy to project a less unfavourable result among the options in the worst scenario projection of cash flows. Thus, if the worst possibilities for the investment materialize, the results will still be satisfactory in the investment. Or the other way around, the tendency for the results to be better than projected has a significant probability. Within this strategy, we projected that the price of kWh will not undergo readjustment, that the growth trend will be minimum, and that the increase in initial investment will occur in line with the dollar’s rise.
Other relevant pieces of information for the projection of cash flows to calculate the ROI amounts is the deduction of all IRPJ, ICMS, CSLL, COFINS, and PIS (Corporate Income Tax, Tax on Circulation of property and Provision of Services, Social Contribution on Net Income, Contribution to Social Security Financing, and Social Integration Program), and a monthly maintenance fee of 0.5%. We defined the lower limit of the adjacent triangular distribution to calculate the ROI values when the worst possibilities were all gathered. However, when only the most probable possibilities (among them some pessimists) remained, the result was assumed as the most possible value for the distribution. Finally, when we eliminated all pessimistic predictions, the adjacent result was considered the upper limit.
For projections, we used the ARIMA method (Autoregressive Integrated Moving Averages). The setting configuration of non-seasonality was of p = 0, d = 0, and q = 1, and regarding the seasonality, P = 0, D = 1, and Q = 1. The setting (0 1 1) (0 1 1) would have a superior fit but would not minimize the trend of consumption growth in our Maxmin strategy. However, other simpler prediction models are perfectly acceptable (for example, the Classic Decomposition Additive or Multiplicative). The reason is that unlike observed for the equity markets, the forecast consumption of energy is relatively trivial. Also, simpler models will be more intuitive and do not require specialist software.

4.2. Results and Discussions

A significant contribution of the Gini-CAPM is to minimize the possibility of prediction mistakes based on history. For example, when you choose a historical number of periods that do not reflect reality well, the regressive pricing of the methodology adjusts the error. Mainly based on the tangent, or the first-order derivative, the risk was called Beta-Gini. Likewise, if we used methods in theoretical evaluations, the results will be identical between distributions and pricing parameters.
Unlike most situations in project evaluations, in the applications of the new method, there is data history of its main input, which is the energy consumption of each of the micro and small companies studied. Table 1 presents the business sectors of micro and small companies and determines an alphanumeric encoding to each. The table also shows the results of average ROI predictions according to the know-how of the small company offering the financing. It is possible to observe that, given the scope of specifications for potential project searches, the funder ended up selecting more than one option within specific sectors. This strategy can be harmful because it is a potential obstacle to diversification.
Table 2 presents the main inputs for the method. It contains the results of ROI projected by method, the parameters of the obtained triangular distributions, the necessary initial investments, and the vector z j of maximum possible participations. It is also necessary to add that the risk-free rate R f adopted for the study is an approximate average value of the SELIC (Special Settlement and Custody System) for the last 30 months and annualized (3.00% per year). SELIC is used as the main parameter to define returns on government bonds in Brazil.
Other important information related to R f is that it is a source of investment, both to the investment capital slack (when at least one of the projects is not in the selected portfolio) and for applications of the cash flows of the projects themselves. The last condition mentioned does not change the selection results, as it raises all the ROI values precisely in the dimension R f , and was implemented to simulate a situation closer to reality in professional financial management. The suppositions also imply that the investor has initial capital available to implement all the projects. It is worth noting that a minor total capital will mean more significant risks.
With the definitions, predictions, and calculations so far, we carried out the first three steps according to the pseudocode of Appendix A. The next step is to calculate the Gini correlations between the energy consumption values of the micro or small companies studied. Table 3 shows these values, where it is possible to observe that, unlike the Pearson correlation, the Gini between j j and j j can be different.
Table 3 also allows abstracting essential information concerning observed levels of correlation. As expected, projects related to micro-enterprises in the same sector have high positive and undesirable values, making diversification difficult (example: between F, G, and H). On the other hand, the first signal that selection may offer significant benefits is that some negative correlations were found (example: between D and J), which may help to minimize total risks and obtain good diversification among other reasons.
Now, in method application, it is possible to design a dynamic matrix (similar to the variance and covariance), in which the matrix name “Gini-variation and Gini-covariation Δ j j ” can be given. Thus, we completed the first 11 steps of the Appendix A pseudocode of the new method. Subsequently, it is possible to calculate various strategic parameters. Initially, we must obtain the optimal global portfolios similar to the Sharpe-Gini-CAPM, to continuous ( to   0 x j 1   and   0 x j z j z j ) , and to discrete ( to   x j [ 0 , 1 ]   and   0 x j z j z j ) .
Table 4 shows these results, where the second column presents the upper limits investment z j . In the third and fourth are, respectively, the continuous and discrete optimal. Table 4 shows the variable participations corresponding to the global and discrete optimal portfolio in the fifth and sixth columns. These values are calculated simply by multiplying the decision variables with the upper bound vector z j . Finally, in the last three lines, the table presents the main information related to the two optimal portfolios: the ROI, the Gini risk, and the Sharpe-Gini CAPM.
It is noteworthy that, if numerically the results of the three variables do not seem very distant (ROI, Gini risk, and Sharpe-Gini between Global Optimal and Discreet Optimal), for returns and financial risks of high investments they are significantly high. It is also important to remember that the portfolios must receive complementation by the product of the risk-free rate R f by investments slack to obtain Table 4 values. At that moment, in the new method pseudocode, we performed the first 17 steps in the application.
A satisfactory understanding of the method can occur using graphic resources. Figure 2 presents some of the main results obtained so far between the Gini risk x ROI dimensions. It is possible to observe in Figure 2 the continuous efficient frontier of the system, where the optimal global portfolio is x j * .
According to the assumption that the investment slack between the maximum necessary and the effective capital will be applied in R f , then a typical deleveraging behavior can be observed in the continuous efficient frontier, similar to compositions with the global optimum x j * . In this case, the continuous frontier starts at R f , runs linearly up to x j * , and from there, it begins to configure itself with a typical concavity (since there is no leverage assumption at R f ), until it touches the discrete differentiable region. The continuous frontier of the system is, in fact, utopian and presented because it contains the optimal market portfolio x j * , which helps didactically understand the new method.
The differentiable and discrete region to   x j [ 0 , 1 ]   and   0 x j z j z j , composed of 2047 options, is significantly essential and presented in Figure 2. This is because, although the continuous boundary dominates the differentiable region completely (as it should be), it fulfils the factual assumption of actual possibilities in the scenario. Therefore, it is here that the analyses in the method and the selection itself are concentrated. Furthermore, the optimal portfolio chosen in applying the method (BCDEFJK) is also in the differentiable region.
With the parameters and variables defined, esteemed, and calculated in the method executions so far, it is possible to calculate the values of the selection criteria. The first is G S s and must be obtained for all differentiable portfolios of s = 1 : p . With the index, according to the CAPM and Gini-CAPM theories, we can select portfolios with the best probabilities of excess of satisfactory returns per risk unit, lower probabilities of losses, among others. In Section 3.2, the set with Equations (11)–(13) presents the formulations for the calculation of G S s . In the pseudocode of Appendix A, the calculation corresponds to steps 16, 17, and 18.
After G S s calculations, we must calculate the non-diversifiable Beta-Gini risk values G B s . The strategic use of this variable has three basic possibilities: avoiding losses when the recession is inevitable, taking advantage of the trend when growth is evident, or just being in tune with the market when the future is uncertain (we assumed the latter for the application). The formulation of variable G B s is given by set Equations (12)–(14).
The third among the main variables of the method is G P s . In the CAPM and Gini-CAPM theories, its result is used to define values adjusted to the assets under study according to historical data and, in this way, highlight opportunities. The formulations for calculating G P s are the set Equations (12), (13), and (15). In the pseudocode, the calculation corresponds to steps 22, 23, and 24.
Table 5 presents the results for G S s , G B s , and G P s . In the first table column are the descriptions of the best-ranked portfolios according to the new method. The following three columns present the values found, respectively, for the variables Sharpe-Gini G S s , Beta-Gini G B s , and Price-Gini G P s . The fifth column, which determines the descending order of presentation, shows the results of the AHP multi-criteria tool. To obtain the AHP results, the small company that participated in the study determined that G S s should have five times more importance than G B s and seven times more importance than G P s . G B s should have three times more importance than G P s .
When processing the data before applying the AHP, the values of G B s were replaced by the modulus of their distances to the constant 1.00, which represents a minimum non-diversifiable risk. The values were still inverted (multiplied to −1) to reverse the logic that the smaller, the better these values would be, and these two manipulations was added to move away from zero. In G P s , we subtracted its values from the values of the small company under the assumption that it has relevant information in such pricing to identify opportunities.
In this case, we also added the two manipulations to move away from zero, and the smaller the difference result, the more deprecated the portfolio should be. The variable G S s did not receive any treatment. It is important to emphasize that Table 5 shows only 2% of the portfolios ranked according to the method. As per scope, all of these best portfolios are eligible, and we must choose the best in the rank. However, the small company decided to implement a more conservative investment, where we should apply a maximum of R$ 1,000,000.00 in projects, with the remainder applied in R f . Thus, we cannot choose the first in the classification (BCDEFGJK), as it would require an investment above the limit. Therefore, the best two options are BCDEFJK and BCDEGJK.

4.3. Preliminary Results Validations

Preliminary validation of the new method only at an initial level is possible by evaluating the selected portfolio (BCDEFJK) in Figure 2, which we drew from historical data. First, it is possible to note that BCDEFJK stands out in the discrete, efficient frontier. Furthermore, by the position of BCDEFJK, we can affirm that it exerts stochastic dominance over most options due to its position in the risk and return dimensions. In portfolio selection by the trade-off between return and risk, we desired stochastic dominance.
The graph in Figure 3 also evidences the excellence expectations of the selected portfolio. The chart shows that, unlike the other two portfolios presented (BEJ and ACDFGHIK), it is close to the line that demarcates the minimum non-diversifiable risk. In the analysis, it is also possible to state that the pricing performed by the small company for BCDEFJK has elements that lead to believe that it has a trend of ROI among the best options. This is similar to BEJ, which has optimistic pricing performed by the small business, unlike the option ACDFGHIK.
Both portfolios used as an example for comparison are not in the research scope strategy of seeking accordance with the portfolio similar to the market. BEJ is used in times of evident recession, and ACDFGHIK for when the economy is growing. However, according to the research scope, by determination of the small company applying the method, the preference should be to seek to have more correlation with the market due to the moment of future uncertainty.
It is essential to emphasize that “a complete validation of a mathematical and statistical method only happens in the long term by confirming results close to those expected and with vast replications to prove efficiency and effectiveness. Statistically, a number between 30 and 60 periods would be reasonable for evaluating a method’s results. For example, submitting these results to hypothesis tests to compare them with classical, more user options, between others. However, in the absence of application results, a widely accepted theory for initial validations in portfolio selection is the Monte Carlo Simulation, where it is a possible project the probabilities of interest in stochastics ways” [59,60].
At this time, there are not enough data to prove or refute the efficiency of the new method vehemently, at least not in period extensions for statistically valid studies. Nevertheless, if there were minimum periods, the last 20 months would have significant distortions due to the current economic crisis caused by the COVID-19 pandemic. On the other hand, portfolio implementations are unnecessary for these assessments, as the main input for the analysis, adjacent energy consumption, does not depend on implementations.
Therefore, the solution to reinforce the new method’s preliminary validations (based on historical data so far) is to use the Monte Carlo Simulation Theory, which is significantly accepted and applied. Thus, we generated 106 data for each project in the simulations according to their triangular probability distributions. Then, in sequence, we compared portfolios selected by the new method with those selected by Net Present Value (NPV), Internal Rate of Return (IRR), and Pay-Back (PB). The reason is that these models are the most used contemporaneously for the selection of discrete asset portfolios, including for investment projects, which is the case observed in this research.
Respectively and in that order, we selected 15 portfolios using the NVP method, 15 portfolios using the IRR, and 14 portfolios using the PB. Also, we used an exclusive selection not to generate portfolio redundancies, and the order was according to the highest level of use of each of the three options. For the new method, we included only the two best-classified portfolios (BCDEFJK and BCDEGJK). And as established, we applied an initial investment limit both for the new method and for its competitors of R$ 1,000,000.00.
The restriction of the initial investment imposed was that the portfolios had a maximum of seven components. However, we observed that the maximum number of elements did not limit the benefit of portfolio diversification, according to the results shown in Table 6. The reason is that the portfolios have results of probabilities less than 2 R f and less than 3 R f , which are significantly low. The levels of 2 R f and 3 R f refer to the Minimum Attractiveness Rate (MAR) possibilities stipulated by the small financing company. For values smaller than 2 R f , the percentages were very close to 0.00%, and for values smaller than 3 R f , they were between 0.00% and 0.50%.
Table 6 also presents in its first column the portfolio compositions in ascending alphabetical order. Its second column presents the method identification that selected the portfolio, where MT is the method proposed by this research. The third and fourth columns show fundamental criteria according to the Utility Theory: at high levels of investments, the most significant concerns are related to possible losses. The reason is that in the two columns, there are, respectively, the classification of each of the portfolios analyzed according to excellence in minimum ROI probabilities for levels lower than 2 R f and 3 R f . In these two criteria, the portfolios selected by the new method occupy the first and second place rankings (BCDEFJK and BCDEGJK).
The fifth column of Table 6 presents rankings according to probabilities of significantly satisfactory ROI levels. The company that is applying the method defined the criteria, where the analyzed ROI probabilities were higher than 4 R f . (the values for all 46 portfolios were greater than 98%). In this case, the portfolios selected by the method do not have ratings as good as those observed for previous criteria, but they were still reasonable. In the criterion, the classification of BCDEFJK got fourth place, and the classification of BCDEGJK got second place.
The sixth Table 6 column presents the rankings of the portfolios according to the highest levels of Gini correlation that they have with the market optimum x j * ; the values for all 46 portfolios were between 0.44 and 0.90. We analyzed this characteristic in the simulation to determine the ability of the portfolios to behave similarly to the market. In fact, according to the CAPM and Gini-CAPM theories, portfolios with higher correlations with the market can be expected to protect investors more in uncertain scenarios or without clear prospects for both growth and recession. In this criterion, the portfolios selected by the new method again occupy first and second place (respectively, BCDEFJK and BCDEGJK).
The seventh column of Table 6 presents a final rank for each portfolio according to the average rating to all criteria analyzed. Therefore, this column shows a final result synthesized. The BCDEFJK and BCDEGJK portfolios occupied first and second place in the study, which corroborates statements about the excellence of portfolio selection by the new year method. The eighth column represents another crucial result for each portfolio: Values were found using a calculation identical to the previous column but not considering the Gini covariation. When comparing this column’s results with the one in the seventh, it is possible to observe significant differences in classification amongst most portfolios. These differences can lead to substantial selection errors.
Therefore, according to analyses based on those historically presented and mainly on the numerical results of the simulations, it is possible to predict that the new method will select significantly excellent portfolios. Its selections are compared with selections by traditional and more often used methods (NPV, IRR, and PB) contemporarily. Among the beneficial characteristics to be expected for portfolios selected by the method, the following stood out: The lowest ROI probabilities below the risk-free rate or minimum attractiveness rates, the highest probabilities of ROI attractive to investors, and greater protections against market uncertainties, among other reasons.
The method also contributes to deciding on selection portfolios with more precision, accuracy, and clarity. The reason is that, again, based on historical and numerical simulations data, using the method in the adjacent selection helps avoid mistakes caused by not considering Gini-covariations in the ROI. These covariations are significantly common, and the traditional methods do not take them into account.

5. Conclusions

This research presented a new method for selecting photovoltaic solar energy generation portfolios projects for installations in small and micro companies. In addition, we structured the method for utilization for other small businesses that want to invest in the finance of the projects. In fact, we looked for a method to try to benefit the various parties involved: small and micro companies that will install systems for their energy generation and that will amortize the investments in the short and medium-term; small companies that will use the method to select the possible financing investments in a professional way; and society in general with the technological development that supports and encourages the generation of clean, sustainable, and environmentally friendly energy. The main research conclusions are as follows:
  • We developed the method structure for selections using multi-criteria similar to the main ones of the Gini-CAPM and in an innovative way, where the criteria derived from the Modern Theory of Portfolios. Their central premise considers the trade-off between risk and return and the covariations between projects’ investment returns. Among the main innovations of the model are contributions with theoretical developments that adapted the original models to the research needs, the use of an alternative risk coefficient (the Gini) that is more robust against the non-normal distributions observed in projects evaluations, a structure customized for applications by small businesses to finance generations of clean and sustainable energy, and the installation of microgenerators in small and micro-enterprises.
  • According to the evaluations based on historical data and, mainly, on data obtained by Monte Carlo simulation, it is possible to hope that the new method would select significantly satisfactory portfolios compared with others selected by traditional and more often used models. Historical and simulations data in the stochastic evaluations project that the portfolios selected by the method are attractive options for implementation. The evaluations show that the portfolios have reasonable probabilistic expectations and satisfactory protection to avoid mistakes for not considering covariations in return on investment. The method also presents theoretical contributions in adaptations of the benchmark models.
  • It is possible to affirm that we achieved the main objective of developing and proposing a method that minimizes literary gaps; helps small and micro-enterprises grow; and supports and encourages clean, sustainable, and responsible energy generation projects. However, the excellence of the method will only be statistically proven after evaluations of post-selection data, using an expressive periods number, based on replications in significant numbers, and when the economic recession due to the COVID-19 pandemic is not influencing the results.
  • We must also emphasize that the proposed method represents the first contribution to Brazil’s photovoltaic solar energy generation projects. This considers the adjacent project’s dimensions, the theory from which we abstracted the criteria used, the theoretical adaptations for the used criteria, the steps of sequential structuring, and the relevance attributed to the trade-off between risk and returns in account of the covariation in return on investments.
  • Finally, we must emphasize that future work is needed to continue this research. These works will be of great value in the development of other methods, improving the method proposed by this research, and mainly for proving or refuting the expectations of the performance of this method.

Author Contributions

J.C.I. designed the study; P.P.B., G.A.B.M. and W.V.d.S., analyzed and interpreted the data; J.C.I., P.P.B. and C.H.P.M., wrote the manuscripts with the support of C.P.d.V. and W.V.d.S. All the authors provided critical feedback and approved the final version of the manuscript. All authors have read and agreed to the published version of the manuscript.

Funding

This research was supported by Pro-Rectory of Research and Graduate Studies of Federal University of Itajubá by funder process number 23088.036884/2021-56.

Data Availability Statement

The data presented in this study are available on request from José Claudio Isaias (joseclaudio.isaias@unifei.edu.br).

Conflicts of Interest

The authors declare no conflict of interest.

Nomenclature

α j Project j participation in the portfolio
B The upper limit of initials investment
C s j Matrix with all binary combinations of portfolios s and projects j
F ( r j ) The cumulative distribution function of project or portfolio j return
G B s Vector of non-diversifiable Gini risk of all portfolios s
G P s Vector of estimated Gini-price of all portfolios s
G S s Vector of maximum excess return per Gini-risk unit of all portfolios s
i j Projects or portfolio j in period i
P i j Matrix of investment required for each project j in the period i
L The lower limit of acceptable returns
p The portfolio total number
s Identification vector of all portfolios
r i j Matrix of return of the project or portfolio j in the period i
R e Return or price of the project or portfolio e
R f Risk-free rate
R m Return of the market portfolio
Γ j j Matrix of Gini correlation between projects j and j
x j Decision variables vector to each project j
z j Vector of maximum relative participation of each project j
Δ j Gini risk of project or portfolio j

Abbreviations

AHPAnalytic Hierarchy Process
CAPMGini Capital Asset Pricing Model
ISIInstitute Scientific Information
MGMean-Gini
MPTModern Portfolio Theory
MRAMinimum rates of attractiveness
MVMean-variance
PERTProgram Evaluation and Review Technique
PPASProject portfolio analysis and selection
ROIReturn on investment-
SELICSpecial Settlement and Custody System
SEPCSolar energy by photovoltaic cells

Appendix A

Proposed method pseudocode.
1BEGIN
2                         R f         load   the   risk free   rate   scalar    
3                         R 3 j load   the   ROI   matrix   of   all   projects    
4 FOR   j = 1 : n ,     j = 1 : m
5   Γ j j   calculate   the   Gini   correlation   matrix
6 END FOR
7 IF j = j
8                   Δ j j = [ Δ j ] 2   calculate   all   the   projects   Gini   risk   individual
9 ELSE j j
10                   Δ j j = [ Δ j j ] 2 calculate   the   Gini - covariations   to   all   projects   pairs
11 END IF
12 FOR     j = 1 : n
13 G S s *   calculate   the   optimal   portfolio   similar   to   of   Sharpe
14 END FOR
15                   G P 1 generates   the   boundaries   graph   of   returns   per   risk   Gini  
16 FOR   s = 1 : p
17 G S s calculate   all   discret   portfolios   excess   ROI   per   Gini   risk unit
18 END FOR
19 FOR   s = 1 : p
20 G B s calculate   all   the   portfolios   the   beta   Gini - CAPM
21 END FOR
22 FOR   s = 1 : p
23 G P s calculate   all   the   portfolios   princing   Gini - CAPM
24 END FOR
25                 Rank     apply   the   AHP   model   on   the   G B s ,   G B s   and   G R s
26                   Selection select   the   best   portfolios
27                   G P 2 generates   the   graph   similar   to   sec urities   market   line  
28END

References

  1. Davis, W.; Martin, M. Optimal year-round operation for methane production from CO2 and water using wind and/or solar energy. J. Clean. Prod. 2014, 80, 252–261. [Google Scholar] [CrossRef]
  2. Shezan, S.; Julai, S.; Kibria, M.; Ullah, K.; Saidur, R.; Chong, W.T.; Akikur, R. Performance analysis of an off-grid wind-PV (photovoltaic)-diesel-battery hybrid energy system feasible for remote areas. J. Clean. Prod. 2016, 125, 121–132. [Google Scholar] [CrossRef]
  3. Wesseh, P.K.; Lin, B. An accurate options valuation of Chinese wind energy technologies for power generation: Do benefits from the feed-in tariffs outweigh costs? J. Clean. Prod. 2016, 112, 1591–1599. [Google Scholar] [CrossRef]
  4. Bertoldi, P.; Rezessy, S.; Oikonomou, V. Rewarding energy savings rather than energy efficiency: Exploring the concept of a feed-in tariff for energy savings. Energy Policy 2013, 56, 526–535. [Google Scholar] [CrossRef]
  5. Weida, S.; Kumar, S.; Madlener, R. Financial Viability of Grid-connected Solar PV and Wind Power Systems in Germany. Energy Procedia 2016, 106, 35–45. [Google Scholar] [CrossRef]
  6. Wong, S.; Bhattacharya, K.; Fuller, J.D. Long-Term Effects of Feed-In Tariffs and Carbon Taxes on Distribution Systems. IEEE Trans. Power Syst. 2010, 25, 1241–1253. [Google Scholar] [CrossRef]
  7. Eleftheriadis, I.M.; Anagnostopoulou, E.G. Identifying barriers in the diffusion of renewable energy sources. Energy Policy 2015, 80, 153–164. [Google Scholar] [CrossRef]
  8. Sun, S.; Wang, S.; Zhang, G.; Zheng, J. A decomposition-clustering-ensemble learning approach for solar radiation forecasting. Sol. Energy 2018, 163, 189–199. [Google Scholar] [CrossRef]
  9. Agoua, X.G.; Girard, R.; Kariniotakis, G. Short-Term Spatio-Temporal Forecasting of Photovoltaic Power Production. IEEE Trans. Sustain. Energy 2018, 9, 538–546. [Google Scholar] [CrossRef] [Green Version]
  10. Dall’Anese, E.; Dhople, S.V.; Johnson, B.B.; Giannakis, G. Optimal Dispatch of Residential Photovoltaic Inverters under Forecasting Uncertainties. IEEE J. Photovolt. 2014, 5, 350–359. [Google Scholar] [CrossRef] [Green Version]
  11. de Faria, H.; Trigoso, F.B.; Cavalcanti, J.A. Review of distributed generation with photovoltaic grid connected systems in Brazil: Challenges and prospects. Renew. Sustain. Energy Rev. 2017, 75, 469–475. [Google Scholar] [CrossRef]
  12. Vahidinasab, V.; Jadid, S. Normal boundary intersection method for suppliers’ strategic bidding in electricity markets: An environmental/economic approach. Energy Convers. Manag. 2010, 51, 1111–1119. [Google Scholar] [CrossRef]
  13. Lee, M.; Hong, T.; Koo, C. An economic impact analysis of state solar incentives for improving financial performance of residential solar photovoltaic systems in the United States. Renew. Sustain. Energy Rev. 2016, 58, 590–607. [Google Scholar] [CrossRef]
  14. Lorenz, E.; Hurka, J.; Heinemann, D.; Beyer, H.G. Irradiance Forecasting for the Power Prediction of Grid-Connected Photovoltaic Systems. IEEE J. Sel. Top. Appl. Earth Obs. Remote Sens. 2009, 2, 2–10. [Google Scholar] [CrossRef]
  15. Ayoub, N.; Yuji, N. Governmental intervention approaches to promote renewable energies—Special emphasis on Japanese feed-in tariff. Energy Policy 2012, 43, 191–201. [Google Scholar] [CrossRef]
  16. Bayod-Rújula, A.A. Future development of the electricity systems with distributed generation. Energy 2009, 34, 377–383. [Google Scholar] [CrossRef]
  17. de Carvalho, G.D.G.; de Carvalho, H.G.; Cardoso, H.H.R.; Gonçalves, A.D. Assessing a Micro and Small Businesses Innovation Support Programme in Brazil: The Local Innovation Agents Programme. J. Int. Dev. 2018, 30, 1064–1068. [Google Scholar] [CrossRef]
  18. Malaquias, R.F.; Hwang, Y. Firms’ size and use of information and communication technologies: Empirical evidence on small businesses in Brazil. Inf. Dev. 2016, 32, 1613–1620. [Google Scholar] [CrossRef]
  19. Abdmouleh, Z.; Alammari, R.A.; Gastli, A. Review of policies encouraging renewable energy integration & best practices. Renew. Sustain. Energy Rev. 2015, 45, 249–262. [Google Scholar] [CrossRef]
  20. da Luz, T.J.; Moura, P.; Almeida, A. Multi-objective power generation expansion planning with high penetration of renewables. Renew. Sustain. Energy Rev. 2018, 81, 2637–2643. [Google Scholar] [CrossRef]
  21. Sirikum, J.; Techanitisawad, A.; Kachitvichyanukul, V. A New Efficient GA-Benders’ Decomposition Method: For Power Generation Expansion Planning With Emission Controls. IEEE Trans. Power Syst. 2007, 22, 1092–1100. [Google Scholar] [CrossRef]
  22. Bracale, A.; Carpinelli, G.; De Falco, P. A Probabilistic Competitive Ensemble Method for Short-Term Photovoltaic Power Forecasting. IEEE Trans. Sustain. Energy 2017, 8, 551–560. [Google Scholar] [CrossRef]
  23. Izadbakhsh, M.; Gandomkar, M.; Rezvani, A.; Ahmadi, A. Short-term resource scheduling of a renewable energy based micro grid. Renew. Energy 2015, 75, 598–606. [Google Scholar] [CrossRef]
  24. San Cristóbal, J.R. Multi-criteria decision-making in the selection of a renewable energy project in Spain: The Vikor method. Renew. Energy 2011, 36, 498–502. [Google Scholar] [CrossRef]
  25. Stojcetovic, B.; Nikolić, D.; Velinov, V.; Bogdanovic, D. Application of integrated strengths, weaknesses, opportunities, and threats and analytic hierarchy process methodology to renewable energy project selection in Serbia. J. Renew. Sustain. Energy 2016, 8, 035906. [Google Scholar] [CrossRef]
  26. Johnson, J.X.; Novacheck, J. Emissions Reductions from Expanding State-Level Renewable Portfolio Standards. Environ. Sci. Technol. 2015, 49, 5318–5325. [Google Scholar] [CrossRef]
  27. Maier, S.; Street, A.; McKinnon, K. Risk-averse portfolio selection of renewable electricity generator investments in Brazil: An optimized multi-market commercialization strategy. Energy 2016, 115, 1331–1343. [Google Scholar] [CrossRef] [Green Version]
  28. Zhang, Y. Selecting risk response strategies considering project risk interdependence. Int. J. Proj. Manag. 2016, 34, 819–830. [Google Scholar] [CrossRef] [Green Version]
  29. Bhattacharyya, R.; Kumar, P.; Kar, S. Fuzzy R&D portfolio selection of interdependent projects. Comput. Math. Appl. 2011, 62, 3857–3870. [Google Scholar] [CrossRef] [Green Version]
  30. Shalit, H.; Yitzhaki, S. The mean-gini efficient portfolio frontier. J. Financial Res. 2005, 28, 59–75. [Google Scholar] [CrossRef]
  31. Yitzhaki, S.; Schechtman, E. The Gini Methodology: A Primer on a Statistical Methodology; Springer: New York, NY, USA, 2013. [Google Scholar]
  32. Shalit, H.; Yitzhaki, S. Mean-Gini, Portfolio Theory, and the Pricing of Risky Assets. J. Financ. 1984, 39, 1449–1468. [Google Scholar] [CrossRef]
  33. Project Management Institute. Guia PMBOK do Conhecimento em Gerenciamento de Projetos, 6th ed.; Project Management Institut: Newtown Square, PA, USA, 2017. [Google Scholar]
  34. Ringuest, J.L.; Graves, S.B.; Case, R.H. Mean–Gini analysis in R&D portfolio selection. Eur. J. Oper. Res. 2004, 154, 157–169. [Google Scholar] [CrossRef]
  35. Ringuest, J.L.; Graves, S.B. Formulating Optimal R&D Portfolios. Res. Technol. Manag. 2005, 48, 42–47. [Google Scholar] [CrossRef]
  36. Okunev, J. A linear programming algorithm for determining mean-Gini efficient farm plans. Agric. Econ. 1988, 2, 273–285. [Google Scholar]
  37. Khan, F.; Al-Ahmed, A.; Al-Sulaiman FAStreet, A.; Barroso, L.A.; Flach, B.; Pereira, M.V.; Granville, S. Critical analysis of the limitations and validity of the assumptions with the analytical methods commonly used to determine the photovoltaic cell parameters. Renew. Sust. Energ. Rev. 2021, 140, 110753. [Google Scholar] [CrossRef]
  38. Khan, F.; Kim, J.H. Performance Degradation Analysis of c-Si PV Modules Mounted on a Concrete Slab under Hot-Humid Conditions Using Electroluminescence Scanning Technique for Potential Utilization in Future Solar Roadways. Materials 2019, 12, 4047. [Google Scholar] [CrossRef] [Green Version]
  39. Street, A.; Barroso, L.; Flach, B.; Pereira, M.; Granville, S. Risk Constrained Portfolio Selection of Renewable Sources in Hydrothermal Electricity Markets. IEEE Trans. Power Syst. 2009, 24, 1136–1144. [Google Scholar] [CrossRef]
  40. Martinez-Fernandez, P.; Dellano-Paz, F.; Calvo-Silvosa, A.; Soares, I. Assessing Renewable Energy Sources for Electricity (RES-E) Potential using a CAPM-Analogous Multi-Stage Model. Energies 2019, 12, 3599. [Google Scholar] [CrossRef] [Green Version]
  41. Steffen, B. Estimating the cost of capital for renewable energy projects. Energy Econ. 2020, 88, 104783. [Google Scholar] [CrossRef]
  42. Marcondes, B.G.A.; Leme, R.C.; Leme, M.S.; Sanches da Silva, C.E. Using mean-Gini and stochastic dominance to choose project portfolios with parameter uncertainty. Eng. Econ. 2017, 62, 33–53. [Google Scholar] [CrossRef]
  43. Tasevska, F.; Toropova, O. Management of Project Interdependencies in a Project Portfolio; Umeå School of Business and Economics: Umeå, Sweden, 2013. [Google Scholar]
  44. Wu, Y.; Hu, M.; Liao, M.; Liu, F.; Xu, C. Risk assessment of renewable energy-based island microgrid using the HFLTS-cloud model method. J. Clean. Prod. 2021, 284, 125362. [Google Scholar] [CrossRef]
  45. Dang, X.; Nguyen, D.; Chen, Y.; Zhang, J. A new Gini correlation between quantitative and qualitative variables. Scand. J. Stat. 2020, 48, 1314–1343. [Google Scholar] [CrossRef]
  46. Ogwang, T. A new interpretation of the Gini correlation. Metron 2016, 74, 11–20. [Google Scholar] [CrossRef]
  47. Al Zaabi, H.; Bashir, H. Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach. Int. J. Syst. Assur. Eng. Manag. 2020, 11, 1083–1106. [Google Scholar] [CrossRef]
  48. Markowitz, H. Portfolio Selection. J. Financ. 1952, 7, 77–91. [Google Scholar]
  49. Zabarankin, M.; Pavlikov, K.; Uryasev, S. Capital Asset Pricing Model (CAPM) with drawdown measure. Eur. J. Oper. Res. 2014, 234, 508–517. [Google Scholar] [CrossRef]
  50. Auer, B.R.; Schuhmacher, F. Performance hypothesis testing with the Sharpe ratio: The case of hedge funds. Financ. Res. Lett. 2013, 10, 196–208. [Google Scholar] [CrossRef]
  51. Toloo, M.; Mirbolouki, M. A new project selection method using data envelopment analysis. Comput. Ind. Eng. 2019, 138, 106119. [Google Scholar] [CrossRef]
  52. Li, R.; Yang, N.; Zhang, Y.; Liu, H. Risk propagation and mitigation of design change for complex product development (CPD) projects based on multilayer network theory. Comput. Ind. Eng. 2020, 142, 106370. [Google Scholar] [CrossRef]
  53. Tavana, M.; Khosrojerdi, G.; Mina, H.; Rahman, A. A new dynamic two-stage mathematical programming model under uncertainty for project evaluation and selection. Comput. Ind. Eng. 2020, 149, 106795. [Google Scholar] [CrossRef]
  54. Todorović, M.L.; Petrović, D.T.; Mihić, M.M.; Obradović, V.L.; Bushuyev, S.D. Project success analysis framework: A knowledge-based approach in project management. Int. J. Proj. Manag. 2015, 33, 772–783. [Google Scholar] [CrossRef]
  55. Kourtis, A. The Sharpe ratio of estimated efficient portfolios. Financ. Res. Lett. 2016, 17, 72–78. [Google Scholar] [CrossRef] [Green Version]
  56. Maller, R.; Roberts, S.; Tourky, R. The large-sample distribution of the maximum Sharpe ratio with and without short sales. J. Econ. 2016, 194, 138–152. [Google Scholar] [CrossRef]
  57. Khan, F.; Rezgui, B.D.; Kim, J.H. Reliability Study of c-Si PV Module Mounted on a Concrete Slab by Thermal Cycling Using Electroluminescence Scanning: Application in Future Solar Roadways. Materials 2020, 13, 470. [Google Scholar] [CrossRef] [PubMed] [Green Version]
  58. Zhu, J.; Koehl, M.; Hoffmann, S.; Berger, K.A.; Zamini, S.; Bennett, I.; Gerritsen, E.; Malbranche, P.; Pugliatti, P.; Di Stefano, A.; et al. Changes of solar cell parameters during damp-heat exposure. Prog. Photovolt. Res. Appl. 2016, 24, 1346–1358. [Google Scholar] [CrossRef] [Green Version]
  59. Montgomery, D.C.; Runger, G.C. Applied Statistics and Probability for Engineers, 7th ed.; John Wiley & Sons: New York, NY, USA, 2019. [Google Scholar]
  60. Souza, A.; De Oliveira, A.M.M.; Fossile, D.K.; Óguchi Ogu, E.; Dalazen, L.L.; da Veiga, C.P. Business Plan Analysis Using Multi-Index Methodology: Expectations of Return and Perceived Risks. SAGE Open 2020, 10, 2158244019900171. [Google Scholar] [CrossRef]
Figure 1. Synthesized method sequence.
Figure 1. Synthesized method sequence.
Energies 14 08374 g001
Figure 2. Continuous frontier and differentiable region.
Figure 2. Continuous frontier and differentiable region.
Energies 14 08374 g002
Figure 3. Similar security market line and return predicted by the small enterprise.
Figure 3. Similar security market line and return predicted by the small enterprise.
Energies 14 08374 g003
Table 1. Identifications and annual ROI estimated.
Table 1. Identifications and annual ROI estimated.
IdentificationMicroenterprise Sector of Activity ROI Annual Mean Predicted by Financier
AConstruction company17.14%
BCoffee production farm23.09%
CCoffee production farm27.31%
DFood industry for export27.92%
EFood industry for domestic market22.79%
FRetail supermarket21.02%
GRetail supermarket23.55%
HWholesale and retail supermarket19.52%
IMall of medium-sized18.49%
JMetal mechanic industry22.20%
KBeef slaughter industry28.13%
Table 2. Main inputs for the method.
Table 2. Main inputs for the method.
ProjectsROIParameters of Triangular DistributionsInvestments Participation
PessimisticLikelyOptimistic
A20.39%8.73%19.84%32.61%129,4708.69%
B21.32%9.49%21.69%32.77%133,9839.00%
C24.41%16.01%24.41%32.81%149,47510.04%
D25.00%16.77%25.10%33.13%137,5589.24%
E20.46%9.72%20.79%30.87%123,4728.29%
F23.06%14.07%23.02%32.09%133,3978.96%
G25.35%13.78%25.55%36.72%143,1659.61%
H21.95%9.59%22.02%34.24%131,6358.84%
I21.29%8.61%20.49%34.77%132,8028.92%
J20.08%9.14%20.20%30.91%131,1448.81%
K25.54%17.01%26.13%33.49%143,0919.61%
Table 3. Gini correlation between projects.
Table 3. Gini correlation between projects.
ABCDEFGHIJK
A1.00−0.09−0.11−0.170.160.090.090.090.070.44−0.22
B−0.091.000.44−0.06−0.24−0.35−0.33−0.33−0.11−0.28−0.05
C−0.100.431.00−0.07−0.22−0.30−0.34−0.32-0.09−0.25−0.07
D−0.17−0.05−0.081.00−0.36−0.13−0.15−0.08−0.22−0.380.43
E0.15−0.24−0.22−0.351.000.170.170.080.210.35−0.35
F0.09−0.36−0.31−0.150.171.000.440.420.340.17−0.16
G0.10−0.32−0.33−0.150.170.441.000.450.350.18−0.12
H0.09−0.33−0.32−0.080.080.430.441.000.370.18−0.08
I0.07−0.10−0.08−0.210.220.340.360.381.000.14−0.25
J0.43−0.28−0.26−0.380.360.180.180.170.131.00−0.33
K−0.22−0.06−0.080.44−0.35−0.16−0.13−0.07−0.24−0.341.00
Table 4. Optimal global participation.
Table 4. Optimal global participation.
Projects Upper   Limit   z j Optimal   Global   Participation   x j * Optimal   Discreet   Participation   x j [ 0 , 1 ] Real   Global   Optimal   x j * z j Real   Discreet   Optimal   x j z j
A8.69%11.75%0.00%1.02%0.00%
B9.00%53.06%100.00%4.77%9.00%
C10.04%84.81%100.00%8.51%10.04%
D9.24%88.09%100.00%8.14%9.24%
E8.29%64.67%100.00%5.36%8.29%
F8.96%51.12%100.00%4.58%8.96%
G9.61%29.43%0.00%2.83%0.00%
H8.84%17.93%0.00%1.59%0.00%
I8.92%3.25%0.00%0.29%0.00%
J8.81%57.62%100.00%5.07%8.81%
K9.61%80.22%100.00%7.71%9.61%
ROI13.11%15.74%
Gini Risk0.25%0.35%
Sharpe-Gini CAPM41.07836.637
Table 5. Final results for selection.
Table 5. Final results for selection.
Best PortfoliosSharpe-GiniBeta-GiniPrice-GiniAHP Results
BCDEFJK 36.637 1.261 15.744% 0.000803
BCDEFGJK 36.317 1.473 17.893% 0.000786
BCDEGJK 35.261 1.295 16.096% 0.000776
BCDEFHJK 35.254 1.426 17.419% 0.000769
BCDEHJK 33.853 1.248 15.622% 0.000753
BCDFGJK 33.973 1.330 16.445% 0.000751
BCDEFGK 33.374 1.324 16.388% 0.000740
CDEFJK 32.518 1.098 14.096% 0.000736
ABCDEFGK 33.304 1.474 17.901% 0.000731
BCDEGHJK 32.885 1.461 17.771% 0.000724
BCDEFHK 32.199 1.277 15.915% 0.000721
BCDFJK 31.653 1.117 14.297% 0.000719
BDEFJK 31.397 1.048 13.595% 0.000718
BCDFHJK 31.901 1.283 15.972% 0.000715
ABCDEFHK 32.311 1.427 17.427% 0.000715
ABCDEFJK 32.238 1.410 17.256% 0.000715
ABCDEFK 31.693 1.261 15.752% 0.000712
BCDEFIJK 31.975 1.422 17.375% 0.000709
BCDGJK 31.186 1.152 14.648% 0.000709
ABCDEFGJK 32.514 1.623 19.405% 0.000709
CDFJK 30.697 0.954 12.649% 0.000705
ABCDEGK 31.192 1.296 16.104% 0.000701
BCDEFK 30.649 1.112 14.240% 0.000701
CDEFK 30.437 0.949 12.592% 0.000700
ABCDEGJK 31.421 1.445 17.608% 0.000698
CDEGJK 30.425 1.132 14.448% 0.000696
ABCDEFHJK 31.677 1.576 18.931% 0.000696
ABCDFGJK 31.348 1.479 17.957% 0.000695
BCDEGK 30.393 1.147 14.592% 0.000695
BCDEFGHJK 31.728 1.639 19.568% 0.000693
CDEJK 29.986 0.920 12.299% 0.000691
BCDEJK 29.971 1.083 13.947% 0.000690
ACDEFK 29.959 1.098 14.104% 0.000689
BCDEGHK 30.486 1.312 16.267% 0.000688
ABCDEGHK 30.716 1.462 17.779% 0.000684
BCDFIJK 30.096 1.279 15.928% 0.000682
BCDGHJK 30.171 1.318 16.323% 0.000682
ABCDEHK 29.968 1.249 15.630% 0.000681
ABCDEHJK 30.380 1.398 17.135% 0.000681
BCDEGIJK 30.448 1.457 17.727% 0.000679
Table 6. Results of Monte Carlo simulations.
Table 6. Results of Monte Carlo simulations.
PortfolioSelect. Criteria Rank     2 R f Rank   for   3 R f Rank   for   4 R f Rank for Correl. General RankWithout Covar.
ABCDEGKPB5585522
ABCDFGKNVP885888
ABCDGHKNVP141515141521
ABCDGIKMAR191918191933
ABCDGJKMAR101011101023
ABCFGHKPB313235303239
ABCFGIKPB373738373744
ACDEFGKMAR12121212127
ACDEGHKMAR212122222123
ACDEGIKPB232327232434
ACDFGHKNVP36363036369
ACDFGIKNVP333029343115
ACDFGJKMAR161617161610
ACDGHIKMAR404040404035
ACDGHJKMAR343434333427
ACDGIJKMAR303132293037
ACFGHIKPB454545454545
BCDEFGKNVP443441
BCDEFJKMT1141120
BCDEGHKMAR6666616
BCDEGIKMAR131314131325
BCDEGJKMT2222217
BCDFGHIPB434343424343
BCDFGHKNVP15141315145
BCDFGIKNVP181716201711
BCDFGJKNVP331334
BCDFHIKPB282933282931
BCDGHIKNVP353531353526
BCDGHJKNVP7777718
BCDGIJKMAR111110111128
BCEFGHKPB222226212236
BCFGHIKMAR414242414140
BCFGHJKPB242428242638
BCFGIJKPB323336323341
BDFGHIKPB444444444442
CDEFGHKNVP26262126252
CDEFGIKNVP272725272711
CDEFGJKMAR999993
CDEGHIKMAR383939383928
CDEGHJKPB171819171719
CDEGIJKPB202023182030
CDFGHIKNVP424141434213
CDFGHJKNVP29282431286
CDFGIJKNVP252520252314
CDGHIJKMAR393837393831
CFGHIJKPB464646464646
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Isaias, J.C.; Balestrassi, P.P.; Marcondes, G.A.B.; Silva, W.V.d.; Pereira Mello, C.H.; Veiga, C.P.d. Project Portfolio Selection of Solar Energy by Photovoltaic Generation Using Gini-CAPM Multi-Criteria and Considering ROI Covariations. Energies 2021, 14, 8374. https://doi.org/10.3390/en14248374

AMA Style

Isaias JC, Balestrassi PP, Marcondes GAB, Silva WVd, Pereira Mello CH, Veiga CPd. Project Portfolio Selection of Solar Energy by Photovoltaic Generation Using Gini-CAPM Multi-Criteria and Considering ROI Covariations. Energies. 2021; 14(24):8374. https://doi.org/10.3390/en14248374

Chicago/Turabian Style

Isaias, José Claudio, Pedro Paulo Balestrassi, Guilherme Augusto Barucke Marcondes, Wesley Vieira da Silva, Carlos Henrique Pereira Mello, and Claudimar Pereira da Veiga. 2021. "Project Portfolio Selection of Solar Energy by Photovoltaic Generation Using Gini-CAPM Multi-Criteria and Considering ROI Covariations" Energies 14, no. 24: 8374. https://doi.org/10.3390/en14248374

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.