Next Article in Journal
CODAS–Hamming–Mahalanobis Method for Hierarchizing Green Energy Indicators and a Linearity Factor for Relevant Factors’ Prediction through Enterprises’ Opinions
Previous Article in Journal
A Study on the Man-Hour Prediction in Structural Steel Fabrication
Previous Article in Special Issue
Security Assessment of Industrial Control System Applying Reinforcement Learning
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
This is an early access version, the complete PDF, HTML, and XML versions will be available soon.
Article

An Application of Lean Techniques to Construct an Integrated Management Systems Preventive Action Model and Evaluation: Kaizen Projects

by
Matshidiso Moso
* and
Oludolapo Akanni Olanrewaju
Department of Industrial Engineering, Faculty of Engineering and the Built Environment, University of Technology, Durban 4001, South Africa
*
Author to whom correspondence should be addressed.
Processes 2024, 12(6), 1069; https://doi.org/10.3390/pr12061069
Submission received: 6 April 2024 / Revised: 19 May 2024 / Accepted: 20 May 2024 / Published: 23 May 2024
(This article belongs to the Special Issue Challenges and Advances of Process Control Systems)

Abstract

The Occupational Health and Safety system enforces the continual improvement culture in industries for much safer processes and zero injuries. The Quality Management System also enforces the same philosophy of continual improvement within the processing system for zero defects, hence a high productivity rate. Good quality products always result from good Overall Equipment Effectiveness; hence, Process Re-Engineering is essential for the good functioning of machinery. This research is based on Integrated Management System requirements in terms of problem-solving, especially the opportunities that arise within Quality nonconformances, Safety Incidents, as well as Process Engineering related breakdowns. This study aims to develop a troubleshooting system that evaluates continual improvement projects. The method used to develop the troubleshooting system is based on Total Quality Management, where lean principles are combined with kaizen concepts and quality standards. The proposed troubleshooting system is separated into three development phases: the first phase is for recording the details of the fault that has been raised, where one will record full details of the nonconformance, the time and date, validation of the nonconformance by the lab test or any other form of validation depending on the nature of the problem as well as the details of the location of the problem. The second phase is for problem classification, whether it is a quality nonconformance, Safety incident, or engineering-related breakdown. The deeper root cause analysis is performed by an application of lean techniques, which are the eight types of waste, Five Whys and Ishikawa analysis. The eight types of waste identify the type of waste contributed by the problem, the Five Whys analysis assists in finding the reason for the problem occurrence, and the Ishikawa analysis classifies the problem accordingly, which assists the analyst in identifying the area to focus on for problem-solving. The third phase is for a database system and an application of the kaizen philosophy by evaluating continual improvement projects as well as status reports on the permanent solutions to the faults. The proposed troubleshooting model was applied in a case study company to upgrade the problem-solving model that the company was using which was assisting for corrective and preventive action. The study resulted in drastic improvements; hence, continual improvement projects were evaluated within the problem occurrences.
Keywords: troubleshooting models; nonconformances; Quality Management System; occupational safety; engineering breakdowns; Total Quality Management; lean manufacturing; Integrated Management Systems; Total Productive Maintenance troubleshooting models; nonconformances; Quality Management System; occupational safety; engineering breakdowns; Total Quality Management; lean manufacturing; Integrated Management Systems; Total Productive Maintenance

Share and Cite

MDPI and ACS Style

Moso, M.; Olanrewaju, O.A. An Application of Lean Techniques to Construct an Integrated Management Systems Preventive Action Model and Evaluation: Kaizen Projects. Processes 2024, 12, 1069. https://doi.org/10.3390/pr12061069

AMA Style

Moso M, Olanrewaju OA. An Application of Lean Techniques to Construct an Integrated Management Systems Preventive Action Model and Evaluation: Kaizen Projects. Processes. 2024; 12(6):1069. https://doi.org/10.3390/pr12061069

Chicago/Turabian Style

Moso, Matshidiso, and Oludolapo Akanni Olanrewaju. 2024. "An Application of Lean Techniques to Construct an Integrated Management Systems Preventive Action Model and Evaluation: Kaizen Projects" Processes 12, no. 6: 1069. https://doi.org/10.3390/pr12061069

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop