Next Article in Journal
A Verified Implementation of the DPLL Algorithm in Dafny
Next Article in Special Issue
Dynamic Scheduling of Intelligent Group Maintenance Planning under Usage Availability Constraint
Previous Article in Journal
Parameterization of a Novel Nonlinear Estimator for Uncertain SISO Systems with Noise Scenario
Previous Article in Special Issue
Optimum Post-Warranty Maintenance Policies for Products with Random Working Cycles
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

An Imperfect Repair Model with Delayed Repair under Replacement and Repair Thresholds

School of Mathematics & Computer Science, Yan’an University, Yan’an 716000, China
*
Author to whom correspondence should be addressed.
Mathematics 2022, 10(13), 2263; https://doi.org/10.3390/math10132263
Submission received: 30 May 2022 / Revised: 19 June 2022 / Accepted: 20 June 2022 / Published: 28 June 2022

Abstract

:
Based on the extended geometric process, a repair replacement model of a degradation system is studied, in which the delayed repair time depends on the working time after the last repair. Replacement and repair thresholds describe when the system will be replaced and when the system can be repaired, respectively. Two kinds of replacement policies are studied. One policy is jointly determined by the moment of the Nth failure and the first hitting time of the working time after the last repair for the replacement threshold, and the system is replaced, whichever occurs first; the other is the special case of the first policy, and the system is replaced when the working time after the last repair first hits the replacement threshold. The exact expressions of the long-run average cost rate are obtained. The optimal policies exist and can be ascertained by numerical methods. Finally, numerical examples are presented to demonstrate the application of the results obtained in the paper.

1. Introduction

In 1988, the geometric process repair model (GPRM) was first introduced by Lam [1,2]. Since then, it has been widely studied, and many extended models have been proposed [3]. For example, the geometric process is generalized to the extended geometric process [4], threshold geometric process [5], doubly geometric process [6], phase-type geometric process [7], α-series process [8], and so on. The GPRM is suitable for describing the phenomenon whereby “the successive working times of the system after repair become shorter and shorter, while the consecutive repair times of the system after failure become longer and longer” [1,2]. However, a system after repair does not always degrade successively in practice [9]. As Zhang & Wang [10] say, “a serious failure may lead to the deteriorating of the system, while a slight failure can be eliminated, so that the system is not degenerative”. Zhang & Wang [4] proposed an extended geometric process repair model (EGPRM) and explicitly expressed the average reward rate. Zhang & Wang [11] obtained different optimal replacement policies to minimize the average cost rate, maximize the average availability rate, and optimize the tradeoff model of the average cost rate and the average availability rate. Zhang & Wang [10] proposed an EGPRM considering a repair-replacement problem for a cold standby repairable system with two different components and one repairman, and the optimal replacement policy based on the failure number of Component 2 was given by minimizing the average cost rate of the system. Considering the repairman having multiple vacations, Wang et al. [12] proposed an EGPRM and explicitly expressed the long-run average cost rate based on the failure number of the component. From the above literature, it can be found that although the EGPRM has more parameters than the GPRM, the EGPRM is closer to the reality than the GPRM, and the parameters can be estimated by the statistical EM (i.e., Expectation-Maximization) algorithm [11].
The above papers are all focused on the replacement policy N, i.e., the system is replaced when the number of failures of the system reaches N. It is much more reasonable to consider bivariate or multi-variant repair and replacement policies from the consideration of practice, and they have also been widely studied. Zhang [13] generalized Lam’s work by introducing a bivariate replacement policy (T, N). Wang & Zhang [14] proposed a bivariate replacement policy (L, N) based on the fixed-length interval of the preventive repair, and the preventive repair number of the system. Wang & Zhang [15] proposed a bivariate replacement policy based on system reliability and failure number of the system (R, N). Chang et al. [16] considered a bivariate replacement policy (n, T) based on the life age and the number of Type-I and Type-II failures. Sheu et al. [17] extended the bivariate replacement policy (T, N) to two trivariate replacement policies (K, N, T) and (N, S, T), in which K is a tolerance limit of failure and S is the lower working age.
Since the working time after a lot of maintenance will become shorter and shorter, the maintenance will become more and more frequent, incurring more and more maintenance costs; therefore, when the working time after the last repair is too short, it is not a wise choice to repair the system, and the best option is to replace it. Aiming to resolve this issue, Dong et al. [18] proposed a bivariate replacement policy in which the system is replaced whenever the working time reaches T or at the first hitting time of the working time after repair concerning the working time threshold, whichever occurs first. In this paper, we will propose an EGPRM and further consider a new bivariate replacement policy ( N τ 1 , N ) , i.e., the system is replaced when the working time after the last repair is not longer than the replacement threshold τ1, or if the system is repaired N times, whichever occurs first. There are many applications of the EGPRM and the replacement policy ( N τ 1 , N ) . For example, water filters are devices that remove impurities from water through good physical barriers and chemical or biological processes. The filter cartridge is the core device of water filters, and most of the water filters are made up of multi-stage filter cartridges that are arranged in order of precision from low to high. Interceptions such as rust, sand, colloid, and other impurities are deposited inside the filter cartridges; thus, they need to be regularly manually disassembled and washed, or parts of the filter cartridges need to be replaced (for example, the filter cartridge with low precision) to guarantee the normal operation of the machine. In general, when the speed of filtering water is lower than a certain critical value, which can be viewed as a failure, we wash the filter cartridges or replace part of the filter cartridges, which can be considered an imperfect repair. With the increase in cleaning times or the number of replacements of parts of the filter cartridges, the water filter’s efficiency becomes lower and lower. In other words, the working time after the last repair becomes shorter and shorter; when the working time of a water filter is too short for it to be worth repairing, it is best to replace all the filter cartridges at the same time, which means that a renewal cycle is completed. Moreover, when the number of repairs reaches a fixed threshold, we will also replace all the filter cartridges simultaneously. Thus, considering a tradeoff between the work efficiency and the cost, it is necessary to study the optimal repair and replacement policy to minimize the long run average cost rate.
The delayed repair is common for complex repair systems due to several practical factors [19]. One reason is that the system failure cannot be detected in time [20,21,22,23,24,25]. Another reason is that the delayed repair time may be due to a maintenance resources mobilization (e.g., maintenance crew, spare parts, tools) [26,27], which will be considered in the paper. For example, Zhang [27] pointed out that it is impossible to repair the system immediately if the repairman is on holiday. The random procurement lead time is considered by Yu et al. [26], if the Nth failure of the old system occurs too early, the replacement has to wait until the desired spare part is delivered. There is a threshold for the system to be repaired immediately, which is called the repair threshold in this paper; when the working time after the last repair is longer than the time used for a maintenance resources mobilization, there is no delayed repair time. Otherwise, it needs to wait until the duration after the last repair reaches the repair threshold. Obviously, the delayed repair depends on the working time after the last repair, which is discussed in this paper; however, the delayed repair time and working time are assumed to be independent of each other in most early works [27].
To the authors’ best knowledge, an extended geometric process repair model with imperfect repair considering replacement threshold and repair threshold has not been found, and Table 1 summarizes the current results on similar topics.
Remark 1. 
In Table 1, N, ( T , N τ 1 ) , ( N τ 1 , N ) , and N τ 1 are all symbols of replacement policies, where N stands for the replacement policy under which the system is replaced when the number of failures of the system gets to N; ( T , N τ 1 ) stands for the replacement policy whenever the working age of the system reaches T or at the first hitting time of the working time after repair for the working time thresholdτ, whichever occurs first; ( N τ 1 , N ) stands for the replacement policy under which the system is replaced when the working time is shorter than the replacement thresholdτ1, or if the system is repaired N times, whichever occurs first; N τ 1 stands for a replacement policy under which the system is replaced when the working time is shorter than the replacement thresholdτ1.
The main contribution of this paper to the existing literature is as follows:
  • A novel model for imperfect delayed repair is built by using extended geometric processes.
  • Replacement and repair thresholds are involved.
  • Two kinds of replacement policies ( N τ 1 , N ) and N τ 1 are considered.
  • The explicit expressions of the long-run average cost rate are obtained.
  • The existence of optimal policies is proved, and numerical examples are presented to demonstrate the application of the results obtained in the paper.
The remainder of the paper is organized as follows: the problem definition is introduced in Section 2. In Section 3, the exact expressions of the long-run average cost rate under the policy ( N τ 1 , N ) and its special case (policy N τ 1 ) are derived and optimal policies are proved. Section 4 provides numerical examples to show that optimal replacement policies N τ 1 * and ( N τ 1 , N ) * are existent and unique. Finally, conclusions are given in Section 5.

2. Problem Definition

In this paper, we study a repairable system based on the extended geometric process, and the basic assumptions about the replacement model are given as follows:
Assumption 1. 
Initially, the system is new.
Assumption 2. 
The system degrades geometrically with probability qn and does not degrade with probability pn = 1 − qn at the nth repair for n = 1,2,…
Let Xn be the working time after the (n − 1)th maintenance and {Xn, n = 1,2,…} be a non-increasing process, where X1 is a new system’s working time. Thus, {Xn, n = 1,2,…} constitutes an extended geometric process with the cumulative distribution function
F n ( t ) = p n 1 F n 1 ( t ) + q n 1 F n 1 ( a t )
where pn + qn = 1, 0 ≤ pn ≤ 1, (n = 1,2,…), a > 1 and t ≥ 0. Furthermore, we assume that E[X1] = λ > 0.
Let Yn be the repair time after the nth failure, and {Yn, n = 1,2,…} forms an extended geometric process, which has the cumulative distribution function
G n ( t ) = p n 1 G n 1 ( t ) + q n 1 G n 1 ( b t )
where 0 < b < 1. Assume EY1 = η ≥ 0, and η = 0 implies that it is negligible for the repair time.
Assumption 3. 
Xn andYn are independent of each other, n = 1,2,….
Assumption 4. 
The system is subjected to self-announcing failures, i.e., system failures can be detected simultaneously. Assume a replacement threshold τ 1 exists, i.e., when the working time X n is no longer than τ 1 , the system will be replaced. Furthermore, we assume the system is replaced immediately, and the replacement takes negligible time.
Assumption 5. 
There exists the time for a maintenance resources mobilization, which takes time τ 2 , i.e., the repair threshold.
If 0 τ 2 τ 1 , the system can always be repaired immediately when the working time after the last repair is longer than τ 1 . If 0 τ 1 τ 2 , there exist three cases for the working time X n ( n = 1 , 2 , ): (a) 0 X n τ 1 , the system will be replaced immediately; (b) τ 1 < X n τ 2 , the system will be repaired, but it needs to wait until the duration after the (n − 1)th repair reaches τ 2 , i.e., there exists the delayed repair; (c) X n > τ 2 , the system will be repaired immediately. In the paper, we focus on the case of 0 τ 1 τ 2 , because τ 2 does not work for the case of 0 τ 2 τ 1 .
Assumption 6. 
The cost rate of the repair is c f ; thus, c f Y n is the cost of a repair when the system is repaired immediately after the n th failure. Moreover, we assume that there is a penalty because of the delayed repair, and the cost is in proportion to the length of the delayed repair time; thus, the cost of a repair is c f Y n + c d Z n , when the system is not repaired at once, where Z n is the wait time after the n th failure, c d is the penalty cost rate during the wait for repair state, and
Z n = { τ 2 X n , τ 1 < X n τ 2 0 , others
The fixed replacement cost is c r .
Assumption 7. 
The replacement policy ( N τ 1 , N ) is used, i.e., the system is replaced at the first hitting time of the working time X n concerning the replacement threshold τ 1 or at the moment of the N th failure, whichever occurs first.
Remark 2. 
For the replacement policy ( N τ 1 , N ) , if we let N → ∞, i.e., we do not consider the number of repairs, we can obtain the replacement policy N τ 1 , i.e., the system is replaced at the first hitting time of the working time X n for the replacement threshold τ 1 , where N τ 1 = min { n | X n τ 1 , n = 1 , 2 , } . In the paper, we also discuss the replacement policy N τ 1 in detail.
Remark 3. 
For the replacement policy ( N τ 1 , N ) , if we let τ 1 = 0 , i.e., we do not consider the replacement threshold, we can obtain the replacement policy N , i.e., the system is replaced when the number of repair reaches N , which has been discussed by many authors under different situations, see, for example, Lam [1,2], Zhang [27], Zhang & Wang [4,10,11], and references therein.
A renewal cycle is defined as the time interval between the installation of a new system and the first replacement or a time interval between two consecutive replacements. A sample path of the system is illustrated in Figure 1. Our objective is to find the optimal replacement policies to minimize the long-run average cost rate of the system under two policies, ( N τ 1 , N ) and N τ 1 .

3. Optimization Model Development

Let T 1 denote the first replacement time, and let T n ( n 2 ) denote the interval between the ( n 1 )th replacement and the n th replacement. Obviously, { T n , n = 1 , 2 , } forms a renewal process. According to the renewal theorem, the long-run average cost rate is given by
the   expected   reward   incurred   in   a   renewal   cycle the   expected   length   of   a   renewal   cycle
where a renewal cycle is a time between two consecutive replacements. In practice, the repair and replacement policies are mainly accounted for with regard to the cost or the availability consideration, aiming to find the optimal policies which minimize (or maximize) the long-run average cost rate (or availability) [28,29,30,31,32,33,34,35,36]. In the following, we will concentrate on the optimal replacement policies to minimize the long-run average cost rate under two kinds of replacement policies, ( N τ 1 , N ) and N τ 1 .

3.1. Long-Run Average Cost Rate under Replacement Policy ( N τ 1 , N )

Under the replacement policy ( N τ 1 , N ) , the system is replaced at the time of the N th failure or at the first hitting time ( N τ 1 ) of X n for τ 1 , whichever occurs first; therefore, the length of a renewal cycle L is a random variable, and we have
L = ( U N τ 1 + V N τ 1 1 + W N τ 1 1 ) I ( N τ 1 N ) + ( U N + V N 1 + W N 1 ) I ( N τ 1 > N ) = ( i = 1 N τ 1 X i + i = 1 N τ 1 1 Y i + i = 1 N τ 1 1 Z i ) I ( N τ 1 N ) + ( i = 1 N X i + i = 1 N 1 Y i + i = 1 N 1 Z i ) I ( N τ 1 > N ) ,
where U N τ 1 (or U N ) is the working time during a cycle based on policy N τ 1 (or N); V N τ 1 1 (or V N 1 ) is the repair time during a cycle based on policy N τ 1 (or N); W N τ 1 1 (or W N 1 ) is the wait time during a cycle under policy N τ 1 (or N); define i = 1 0 0 ; I ( A ) is an indicator function of event A , i.e., I ( A ) = 1 , if A occurs; otherwise I ( A ) = 0 .
The expected length of a renewal cycle follows
E [ L ] = E [ ( i = 1 N τ 1 X i + i = 1 N τ 1 1 Y i + i = 1 N τ 1 1 Z i ) I ( N τ 1 N ) ] + E [ ( i = 1 N X i + i = 1 N 1 Y i + i = 1 N 1 Z i ) I ( N τ 1 > N ) ]
Computing expectations by conditioning, the first term of Equation (6) becomes
E [ ( i = 1 N τ 1 X i + i = 1 N τ 1 1 Y i + i = 1 N τ 1 1 Z i ) I ( N τ 1 N ) ] = E [ E [ ( i = 1 N τ 1 X i + i = 1 N τ 1 1 Y i + i = 1 N τ 1 1 Z i ) I ( N τ 1 N ) | N τ 1 ] ] = k = 1 N [ E [ ( i = 1 N τ 1 X i + i = 1 N τ 1 1 Y i + i = 1 N τ 1 1 Z i ) | N τ 1 = k ] P { N τ 1 = k } ] = k = 1 N [ ( i = 1 k E [ X i ] + i = 1 k 1 E [ Y i ] + i = 1 k 1 E [ Z i ] ) P { N τ 1 = k } ] .
From the results of Zhang & Wang (2017), since { X n , n = 1 , 2 , } and { Y n , n = 1 , 2 , } are extended geometric processes, we have
E [ X i ] = λ m = 1 i 1 ( p m + q m a ) = λ m = 1 i 1 r m
E [ Y i ] = η m = 1 i 1 ( p m + q m b ) = η m = 1 i 1 h m
where r m = p m + q m a , h m = p m + q m b , E [ X i + 1 ] = r i E [ X i ] and E [ Y i + 1 ] = h i E [ Y i ] .
The expression of Z i follows from Equation (3) that
E [ Z i ] = τ 1 τ 2 ( τ 2 t ) d F i ( t ) = τ 1 τ 2 τ 2 d F i ( t ) τ 1 τ 2 t d F i ( t ) = τ 2 F i ( τ 2 ) τ 2 F i ( τ 1 ) t F i ( t ) | τ 1 τ 2 + τ 1 τ 2 F i ( t ) d t = τ 2 F i ( τ 2 ) τ 2 F i ( τ 1 ) τ 2 F i ( τ 2 ) + τ 1 F i ( τ 1 ) + τ 1 τ 2 F i ( t ) d t = τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) .
By substituting Equations (8)–(10) into Equation (7), we have
E [ ( i = 1 N τ 1 X i + i = 1 N τ 1 1 Y i + i = 1 N τ 1 1 Z i ) I ( N τ 1 N ) ] = k = 1 N [ ( F k ( τ 1 ) i = 1 k 1 F ¯ i ( τ 1 ) ) ( i = 1 k ( λ m = 1 i 1 r m ) + i = 1 k 1 ( η m = 1 i 1 h m ) + i = 1 k 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) ] ,
where, define i = 1 0 1 ; P { N τ 1 = k } = F k ( τ 1 ) i = 1 k 1 F ¯ i ( τ 1 ) follows from the fact that { N τ 1 = k } is the event that the working time after the nth repair is longer than τ 1 for n k 1 , and it is not longer than τ 1 after the (k − 1)th repair.
Similar to the calculation of the first term of Equation (6), for the second term of Equation (6), we have
E [ ( i = 1 N X i + i = 1 N 1 Y i + i = 1 N 1 Z i ) I ( N τ 1 > N ) ] = i = 1 N F ¯ i ( τ 1 ) ( i = 1 N ( λ m = 1 i 1 r m ) + i = 1 N 1 ( η m = 1 i 1 h m ) + i = 1 N 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) .
Therefore, according to Equations (11) and (12), Equation (6) becomes
E [ L ] = k = 1 N [ ( F k ( τ 1 ) i = 1 k 1 F ¯ i ( τ 1 ) ) ( i = 1 k ( λ m = 1 i 1 r m ) + i = 1 k 1 ( η m = 1 i 1 h m ) + i = 1 k 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) ] + i = 1 N F ¯ i ( τ 1 ) ( i = 1 N ( λ m = 1 i 1 r m ) + i = 1 N 1 ( η m = 1 i 1 h m ) + i = 1 N 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) .
Since
C ( τ 1 , N ) = ( c f i = 1 N τ 1 1 Y i + c d i = 1 N τ 1 1 Z i ) I ( N τ 1 N ) + ( c f i = 1 N 1 Y i + c d i = 1 N 1 Z i ) I ( N τ 1 > N ) + c r
Similarly, the expected cost in a renewal cycle is given by
E [ C ( τ 1 , N ) ] = k = 1 N [ ( F k ( τ 1 ) i = 1 k 1 F ¯ i ( τ 1 ) ) ( c f i = 1 k 1 ( η m = 1 i 1 h m ) + c d i = 1 k 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) ] + i = 1 N F ¯ i ( τ 1 ) ( c f i = 1 N 1 ( η m = 1 i 1 h m ) + c d i = 1 N 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) + c r .
Therefore, according to Equations (13) and (15), the long-run average cost rate C 2 ( τ 1 , N ) under policy ( N τ 1 , N ) is given by
C 2 ( τ 1 , N ) = { k = 1 N [ ( F k ( τ 1 ) i = 1 k 1 F ¯ i ( τ 1 ) ) ( c f i = 1 k 1 ( η m = 1 i 1 h m ) + c d i = 1 k 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) ] + i = 1 N F ¯ i ( τ 1 ) ( c f i = 1 N 1 ( η m = 1 i 1 h m ) + c d i = 1 N 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) + c r } { k = 1 N [ ( F k ( τ 1 ) i = 1 k 1 F ¯ i ( τ 1 ) ) ( i = 1 k ( λ m = 1 i 1 r m ) + i = 1 k 1 ( η m = 1 i 1 h m ) + i = 1 k 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) ] + i = 1 N F ¯ i ( τ 1 ) ( i = 1 N ( λ m = 1 i 1 r m ) + i = 1 N 1 ( η m = 1 i 1 h m ) + i = 1 N 1 ( τ 1 τ 2 F i ( t ) d t ( τ 2 τ 1 ) F i ( τ 1 ) ) ) }
Specially, if p i = p and q i = q = 1 p , i = 1 , 2 , , we can obtain the special case of the EGPRM by substituting r i = p + a 1 q and h i = p + b 1 q ( i = 1 , 2 , ) into Equation (16), i.e., the result is that the system degrades geometrically with constant probability q and does not degrade at each maintenance with constant probability p . Furthermore, if p i = 0 , i = 1 , 2 , , we can get the GPRM by substituting r i = a 1 and h i = b 1 ( i = 1 , 2 , ) into Equation (16), i.e., the result in the case that the system after repair degrades successively.
There exists the minimum long-run average cost rate. Equation (16) is a bivariate function of τ 1 and N . When N is fixed, it is a function of τ 1 . For example, if N = n , C 2 ( τ 1 , N ) will become
C 2 ( τ 1 , N ) = C 2 , n ( τ 1 ) ,   n = 1 , 2 , .
Thus, if n is fixed, we can minimize C 2 , n ( τ 1 * ) analytically or numerically to get optimal τ 1 n * , i.e., when N = 1 , 2 , , n , , τ 11 * , τ 12 * , , τ 1 n * , are obtained respectively, such that the corresponding C 2 , 1 ( τ 11 * ) , C 2 , 2 ( τ 12 * ) , …, C 2 , n ( τ 1 n * ) , … is minimized. Because of the finiteness of the total lifetime span for the repairable system, the minimum long-run average cost rate can be confirmed. Therefore, the minimum long-run average cost rate based on C 2 , 1 ( τ 11 * ) , C 2 , 2 ( τ 12 * ) , …, C 2 , n ( τ 1 n * ) , … can be obtained; thus, we have
C 2 ( ( N τ 1 , N ) * ) = min N [ min τ 1 C 2 ( τ 1 , N ) ]
Furthermore, we can also obtain the optimal policy from another angle, i.e.,
C 2 ( ( N τ 1 , N ) * ) = min τ 1 [ min N C 2 ( τ 1 , N ) ]

3.2. Special Cases

Some special cases are summarized as follows.
Case 1. Policy N τ 1 .
If we let N , the policy ( N τ 1 , N ) becomes the policy N τ 1 , and it follows from Equation (16) that the long-run average cost rate under the policy N τ 1 is given by
C 1 ( τ 1 ) = c f k = 1 ( η i = 1 k 1 h i i = 1 k F ¯ i ( τ 1 ) ) + c d k = 1 ( ( τ 1 τ 2 F k ( t ) d t ( τ 2 τ 1 ) F k ( τ 1 ) ) i = 1 k F ¯ i ( τ 1 ) ) + c r k = 1 ( λ i = 1 k 1 r i i = 1 k 1 F ¯ i ( τ 1 ) ) + k = 1 ( η i = 1 k 1 h i i = 1 k F ¯ i ( τ 1 ) ) + k = 1 ( ( τ 1 τ 2 F k ( t ) d t ( τ 2 τ 1 ) F k ( τ 1 ) ) i = 1 k F ¯ i ( τ 1 ) )
Especially, if the system degrades geometrically with constant probability q and does not degrade at each maintenance with constant probability p , i.e., p i = p and q i = q = 1 p , i = 1 , 2 , , we can obtain the special case of the EGPRM by substituting r i = p + a 1 q and h i = p + b 1 q , ( i = 1 , 2 , ) into Equation (17). Furthermore, if the system after maintenance degrades successively, i.e., p i = 0 , i = 1 , 2 , , we can get the GPRM by substituting r i = a 1 and h i = b 1 , ( i = 1 , 2 , ) into Equation (17).
The optimal τ 1 , which minimizes C 1 ( τ 1 ) , exists. Because C 1 ( τ 1 ) is a continuous function on the interval [ 0 , τ 2 ] , from the extreme value theorem, there must exist an optimal τ 1 which minimizes C 1 ( τ 1 ) . Moreover, the optimal policies can be obtained by numerical methods under some conditions, and the optimal policies under different conditions are unique in the following numerical examples.
Furthermore,
C 2 ( ( N τ 1 , N ) * ) = min τ 1 [ min N C 2 ( τ 1 , N ) ] min τ 1 [ C 2 ( τ 1 , ) ] = C 1 ( τ 1 * )
therefore, the optimal policy ( N τ 1 , N ) * is better than the optimal policy N τ 1 * .
Case 2. τ 1 = 0 .
Since F k ( 0 ) = 0 and F ¯ k ( 0 ) = 1 for any k Z + , the policy N τ 1 is the case that the system will fail only when the working time reaches 0; therefore, Equation (17) becomes
C 1 ( 0 ) = c f k = 1 ( η i = 1 k 1 h i ) + c d k = 1 ( 0 τ 2 F k ( t ) d t ) + c r k = 1 ( λ i = 1 k 1 r i ) + k = 1 ( η i = 1 k 1 h i ) + k = 1 ( 0 τ 2 F k ( t ) d t )
If τ 1 = 0 , the policy ( N τ 1 , N ) will become the policy N , and Equation (16) becomes
C 2 ( 0 , N ) = c f i = 1 N 1 ( η m = 1 i 1 h m ) + c d i = 1 N 1 ( 0 τ 2 F i ( t ) d t ) + c r i = 1 N ( λ m = 1 i 1 r m ) + i = 1 N 1 ( η m = 1 i 1 h m ) + i = 1 N 1 ( 0 τ 2 F i ( t ) d t )
Case 3.  τ 1 = τ 2 = 0 .
Equation (16) becomes
C 2 ( 0 , N ) = c f i = 1 N 1 ( η m = 1 i 1 h m ) i = 1 N ( λ m = 1 i 1 r m ) + c r i = 1 N ( λ m = 1 i 1 r m ) + i = 1 N 1 ( η m = 1 i 1 h m )
Moreover, if τ 1 = τ 2 = 0 , r m = a 1 and h m = b 1 , m = 1 , 2 , , Equation (20) becomes Lam’s result [1,2], i.e.,
C 2 ( 0 , N ) = c f η i = 1 N 1 b i 1 λ i = 1 N a i 1 + c r λ i = 1 N a i 1 + η i = 1 N 1 b i 1

4. Numerical Example

In this section, numerical examples are provided to demonstrate the optimal replacement policies under two cases, respectively.
We assume that a new system’s lifetime ( X 1 ) and the first repair time ( Y 1 ) follow the Gamma distributions with mean λ and η , respectively, that is
F 1 ( x ) = 1 e 2 λ 1 x ( 1 + 2 λ 1 x )   and   G 1 ( x ) = 1 e 2 η 1 x ( 1 + 2 η 1 x ) ,   x 0 .

4.1. Long-Run Average Cost Rate under Policy N τ 1

Firstly, we determine the optimal replacement threshold that minimizes the long-run average cost rate under policy N τ 1 , and three cases are considered. Algorithm 1, which can be adopted to compute an optimal threshold τ 1 * , is summarized as follows. This algorithm could be coded and calculated by MATLAB.
Algorithm 1 Long-Run Average Cost Rate under Policy N τ 1
Input λ , η , a , b , p , q , c f , c d , c r , τ 2 .
Step 1. Compute C 1 ( τ 1 ) as defined by Equation (17).
Step 2. Find the optimal threshold τ 1 * to minimize C 1 ( τ 1 ) ; output τ 1 * and C 1 ( τ 1 * ) .
Step 3. For τ 1 = 0 to τ 2 , compute C 1 ( τ 1 ) as defined by Equation (17).
Step 4. Plot C 1 ( τ 1 ) against threshold τ 1 .
Stop.
Remark 4. 
Since the plot of C11) against the replacement threshold τ 1 can be obtained, Steps 3 and 4 can be viewed as a verification of the global and unique optimal threshold obtained in Step 2.
Moreover, the calculation of C 1 ( τ 1 ) involves infinite series, which should be calculated approximately by the n th partial sums of the series. The approximation precision is determined by n , and the corresponding approximation error can assess it via the following formula:
S = max t ( 0 , τ 2 ) | C 1 ( t , n + 1 ) C 1 ( t , n ) |
where C 1 ( t , n ) is the long-run average cost rate in the case that the infinite series is approximated by the nth partial sums. Therefore, the approximation error can be reduced by increasing n . In the numerical examples, we choose suitable n to guarantee S < 0.0001 .
Case 1. 0 < τ 1 * < τ 2 .
Let λ = 80 , η = 15 , a = 1.05 , b = 0.95 , p = 0.45 , q = 0.55 , c f = 10 , c d = 50 , c r = 1800 , τ 2 = 20 . Figure 2 is the plot of the long-run average cost rate C 1 ( τ 1 ) given by Equation (17). It can be found that C 1 ( τ 1 ) decreases in the interval [0, 12.0509] and increases in the interval [12.0509, 20]. The result means that the optimal τ 1 * = 12.0509 , and the minimum of the long-run average cost rate is C 1 ( τ 1 * ) = 4 . 1864 , which is in accordance with the result obtained using the nonlinear programming method. In other words, based on the optimal policy, the replacement occurs when the working time reaches 12.0509 for the first time.
Case 2. τ 1 * = 0 .
Let λ = 80 , η = 15 , a = 5 , b = 0.5 , p = 0.05 , q = 0.95 , c f = 10 , c d = 50 , c r = 800 , τ 2 = 20 , Figure 3 is the plot of the long-run average cost rate C 1 ( τ 1 ) , which is given by Equation (17). We can find that C 1 ( τ 1 ) increases in the interval [0, 20], which means that the optimal τ 1 * = 0 , and the minimum of the long-run average cost rate is C 1 ( 0 ) = 10 . 5241 . In other words, the system will be replaced when the working time reaches 0 for the first time based on the optimal policy.
Case 3. τ 1 * = τ 2 .
Let λ = 120 , η = 15 , a = 1.05 , b = 0.95 , p = 0.45 , q = 0.55 , c f = 10 , c d = 50 , c r = 300 , τ 2 = 20 ; Figure 4 is the plot of the long-run average cost function C 1 ( τ 1 ) which is given by Equation (17). We can find that C 1 ( τ 1 ) decreases in the interval [0, 20], which means that the optimal τ 1 * = 20 , and the minimum of the long-run average cost rate is C 1 ( 20 ) = 1 . 8842 . That is to say, based on the optimal policy, the system will be replaced at the first time the working time hits 20.
Secondly, we consider the influences of repair threshold τ 2 on the results under the policy N τ 1 . Let λ = 80 , η = 15 , a = 1.05 , b = 0.95 , p = 0.45 , q = 0.55 , c f = 10 , c d = 50 , c r = 1800 . The optimal τ 1 * and C 1 ( τ 1 * ) for different values of τ 2 are tabulated in Table 2. According to Table 2, when τ 2 is small, optimal policy τ 1 * equals τ 2 , which can be interpreted by the fact that C 1 ( τ 1 ) decreases on the interval [ 0 , τ 2 ] ; when τ 2 is large enough, with the increase of τ 2 , optimal policy τ 1 * and the corresponding long-run average cost rate increase gradually. The above analysis results are in line with our intuition.
In order to illustrate the effects of cf on the long-run average cost function C1(τ1), curves for different values of cf are put in the same figure. We choose cf = 10, 15, 20, and 30, and the other parameter values are the same as those in Case 1. The curves are all depicted in Figure 5. From Figure 5, we can find that the higher cf is, ceteris paribus, the higher the long-run average cost, which is in line with our intuition.

4.2. Long-Run Average Cost Rate under Policy ( N τ 1 , N )

In the following, we determine the optimal replacement threshold and repair number that minimize the long-run average cost rate under the policy ( N τ 1 , N ) . Algorithm 2, which can be adopted to compute optimal threshold and failure number ( τ 1 * , N * ) by the numerical methods, is summarized as follows. This algorithm could be coded and calculated by MATLAB.
Algorithm 2 Long-Run Average Cost Rate under Policy ( N τ 1 , N )
Input λ , η , a , b , p , q , c f , c d , c r , τ 2 .
Step 1. Compute C 2 ( τ 1 , N ) as defined by Equation (16).
Step 2. Find the optimal τ 1 * and N * to minimize C 2 ( τ 1 , N ) .
Step 3. Input n ; for N = 1 to n , τ 1 = 0 to τ 2 , compute C 2 ( τ 1 , N ) as defined by Equation (16).
Step 4. Plot C 2 ( τ 1 , N ) against τ 1 and N .
Stop.
Let λ = 80 , η = 15 , p = 0.3 , q = 0.7 , a = 1.2 , b = 0.8 , c f = 10 , c d = 50 , c r = 1500 , τ 2 = 20 ; Figure 6 is the plot of the long-run average cost rate function C 2 ( t , N ) , given by Equation (16).
The objective function is a bivariate function of N and τ 1 , whereas N is a discrete variable and τ 1 is a continuous variable. One unit as the step size of τ 1 and N is adopted to obtain the plot of C 2 ( τ 1 , N ) versus ( τ 1 , N ) . By the searching procedure, we can find that ( τ 1 , N ) * = ( 8.5769 , 7 ) , which minimizes C 2 ( τ 1 , N ) , i.e., C 2 ( τ 1 * , N * ) = C 2 ( 8.5769 , 7 )   = 5.7723 is the optimal long-run average cost rate, which is in line with the result of the graphic display. The optimal long-run average cost rates for different values of N are shown in Table 3. From Table 3, we can obtain the same result of (τ1, N)* = (8.5769, 7).
By using the same parameter values as those in Figure 6, we can also obtain the optimal τ 1 * = 13.5929 , and the minimum of the long-run average cost rate is C 1 ( τ 1 * ) = 7 . 0073 . The comparison between the optimal policy ( N τ 1 , N ) * and N τ 1 * is given in Table 4. Obviously, C 2 ( ( N τ 1 , N ) * ) = 5.7723 C 1 ( τ 1 * ) = 7.0073 , i.e., the optimal policy ( N τ 1 , N ) * is better than the optimal policy N τ 1 * .

5. Conclusions

The working time becomes shorter and shorter after many repairs are conducted for a repairable degradation system; when the working time of a system is too short for it to be worth repairing, it is best to replace it. Moreover, because of the delayed repair, the system cannot be repaired immediately, and the delayed repair time is dependent on the working time, whereas the delayed repair time is always assumed to be independent of the working time in most early works. In order to describe the above phenomena, a repair replacement model was developed using the extended geometric processes.
To minimize the long-run average cost rate, there are two replacement policies, one is based on the working time after the last repair, and the system is replaced when the working time first hits the replacement threshold; the other is a bivariate policy, and the system is replaced when the working time first hits the replacement threshold or when the Nth failure happens, whichever comes first. The explicit expressions of the long-run average cost rate under these two policies and some special cases can be easily used. The existence of optimal policies is proved, and numerical examples are presented to illustrate the application of the developed approach. Moreover, the optimal policy ( N τ 1 , N ) * is proved to be better than the optimal policy N τ 1 * .
Furthermore, if we consider the reward, Lam’s model [1,2] can be viewed as a special case of ours, in the case that τ 1 = τ 2 = 0 .
According to the proposed model, the characteristics of the long-run average cost rate curves based on the real applications can be easily obtained, and the optimal replacement policies are suitable in practical applications.
As a generalization and development of the GPRM, EGPRM is more reasonable than GPRM, and there are still many aspects worthy of in-depth study. For example, EGPRM can be applied to maintenance problems for a multi-component repairable system, and different systems, including series systems, parallel systems or k-out-of-n: G systems or multiple failure modes, are also worth considering. In addition, the parameter estimation is very important, which is also of great interest to investigate.

Author Contributions

Conceptualization, methodology, formal analysis, M.S. and Q.D.; software, M.S. and Z.G.; writing-original draft, M.S. and Z.G.; writing-review and editing, Q.D.; project administration, funding acquisition, Q.D. All authors have read and agreed to the published version of the manuscript.

Funding

This paper is supported by the National Social Science Fund of China (71961030), Natural Science Basic Research Program of Shaanxi (2021JM-419), and Yan’an University Students’ Program for Innovation and Entrepreneurship (D2021144).

Institutional Review Board Statement

Not Applicable.

Informed Consent Statement

Informed consent was obtained from all subjects involved in the study.

Data Availability Statement

The data are available on request.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Lam, Y. A note on the optimal replacement problem. Adv. Appl. Probab. 1988, 20, 479–482. [Google Scholar] [CrossRef] [Green Version]
  2. Lam, Y. Geometric processes and replacement problem. Acta Math. Appl. Sin. 1988, 4, 366–377. [Google Scholar] [CrossRef]
  3. Wu, D.; Peng, R.; Wu, S.M. A review of the extensions of the geometric process, applications, and challenges. Qual. Reliab. Eng. Int. 2020, 36, 436–446. [Google Scholar] [CrossRef]
  4. Zhang, Y.L.; Wang, G.J. An extended geometric process repair model with delayed repair and slight failure type. Commun. Stat.-Theory Methods 2017, 46, 427–437. [Google Scholar] [CrossRef]
  5. Chan, J.S.K.; Yu, P.L.H.; Lam, Y.; Ho, A.P.K. Modelling SARS data using threshold geometric process. Stat. Med. 2006, 25, 1826–1839. [Google Scholar] [CrossRef]
  6. Wu, S.M. Doubly geometric processes and applications. J. Oper. Res. Soc. 2018, 69, 66–77. [Google Scholar] [CrossRef] [Green Version]
  7. Sarada, Y.; Shenbagam, R. On a random lead time and threshold shock model using phase-type geometric processes. Appl. Stoch. Models Bus. Ind. 2018, 34, 407–422. [Google Scholar] [CrossRef]
  8. Braun, W.J.; Li, W.; Zhao, Y.Q. Properties of the geometric and related processes. Nav. Res. Logist. 2005, 52, 607–616. [Google Scholar] [CrossRef] [Green Version]
  9. Sun, Q.Z.; Ye, Z.S.; Zhu, X. Managing component degradation in series systems for balancing degradation through reallocation and maintenance. IISE Trans. 2020, 52, 797–810. [Google Scholar] [CrossRef]
  10. Zhang, Y.L.; Wang, G.J. An extended geometric process repair model for a cold standby repairable system with imperfect delayed repair. Int. J. Syst. Sci. Oper. Logist. 2016, 3, 163–175. [Google Scholar] [CrossRef]
  11. Zhang, Y.L.; Wang, G.J. An extended geometric process repair model with imperfect delayed repair under different objective functions. Commun. Stat.-Theory Methods 2018, 47, 3204–3219. [Google Scholar] [CrossRef]
  12. Wang, J.Y.; Ye, J.M.; Ma, Q.R.; Xie, P.F. An extended geometric process repairable model with its repairman having vacation. Ann. Oper. Res. 2022, 311, 401–415. [Google Scholar] [CrossRef]
  13. Zhang, Y.L. A bivariate optimal replacement policy for a repairable system. J. Appl. Probab. 1994, 31, 1123–1127. [Google Scholar] [CrossRef]
  14. Wang, G.J.; Zhang, Y.L. Optimal periodic preventive repair and replacement policy assuming geometric process repair. IEEE Trans. Reliab. 2006, 55, 118–122. [Google Scholar] [CrossRef]
  15. Wang, G.J.; Zhang, Y.L. A bivariate mixed policy for a simple repairable system based on preventive repair and failure repair. Appl. Math. Model. 2009, 33, 3354–3359. [Google Scholar] [CrossRef] [Green Version]
  16. Chang, C.C.; Sheu, S.H.; Chen, Y.L. A bivariate optimal replacement policy for a system with age-dependent minimal repair and cumulative repair-cost limit. Commun. Stat.-Theory Methods 2013, 42, 4108–4126. [Google Scholar] [CrossRef]
  17. Sheu, S.H.; Chien, Y.H.; Chang, C.C.; Chiu, C.H. Optimal trivariate replacement policies for a deteriorating system. Qual. Technol. Quant. Manag. 2014, 11, 307–320. [Google Scholar] [CrossRef]
  18. Dong, Q.L.; Cui, L.R.; Gao, H.D. A bivariate replacement policy for an imperfect repair system based on geometric processes. Proc. Inst. Mech. Eng. Part O J. Risk Reliab. 2019, 233, 670–681. [Google Scholar] [CrossRef]
  19. Sun, Q.Z.; Ye, Z.S.; Chen, N. Optimal inspection and replacement policies for multi-unit systems subject to degradation. IEEE Trans. Reliab. 2018, 47, 401–413. [Google Scholar] [CrossRef]
  20. Qiu, Q.A.; Maillart, L.; Prokopyev, O.; Cui, L.R. Optimal condition-based mission abort decisions. IEEE Trans. Reliab. 2022, 1–18. [Google Scholar] [CrossRef]
  21. Mendes, A.A.; Ribeiro, J.L.D.; Coit, D.W. Optimal time interval between periodic inspections for a two-component cold standby multistate system. IEEE Trans. Reliab. 2017, 66, 559–574. [Google Scholar] [CrossRef]
  22. Wang, J.J.; Qiu, Q.A.; Wang, H.H. Joint optimization of condition-based and age-based replacement policy and inventory policy for a two-unit series system. Reliab. Eng. Syst. Saf. 2021, 205, 107251. [Google Scholar] [CrossRef]
  23. Yang, L.; Chen, Y.; Qiu, Q.A.; Wang, J. Risk control of mission-critical systems: Abort decision-makings integrating health and age conditions. IEEE T. Ind. Inform. 2022. [Google Scholar] [CrossRef]
  24. Dong, Q.L.; Cui, L.R.; Si, S.B. Reliability and availability analysis of stochastic degradation systems based on bivariate Wiener processes. Appl. Math. Model. 2020, 79, 414–433. [Google Scholar] [CrossRef]
  25. Dong, Q.L.; Cui, L.R. Reliability analysis of a system with two-stage degradation using Wiener processes with piecewise linear drift. IMA J. Manag. Math. 2021, 32, 3–19. [Google Scholar] [CrossRef]
  26. Yu, M.M.; Tang, Y.H.; Wu, W.Q.; Zhou, J. Optimal order-replacement policy for a phase-type geometric process model with extreme shocks. Appl. Math. Model. 2014, 38, 4323–4332. [Google Scholar] [CrossRef]
  27. Zhang, Y.L. A geometrical process repair model for a repairable system with delayed repair. Comput. Math. Appl. 2008, 55, 1629–1643. [Google Scholar] [CrossRef] [Green Version]
  28. Zhang, M.M.; Ye, Z.S.; Xie, M. A condition-based maintenance strategy for heterogeneous populations. Comput. Ind. Eng. 2014, 77, 103–114. [Google Scholar] [CrossRef]
  29. Xie, W.; Liao, H.T.; Jin, T.D. Maximizing system availability through joint decision on component redundancy and spares inventory. Eur. J. Oper. Res. 2014, 237, 164–176. [Google Scholar] [CrossRef]
  30. Zhao, X.F.; Mizutani, S.; Nakagawa, T. Which is better for replacement policies with continuous or discrete scheduled times? Eur. J. Oper. Res. 2015, 242, 477–486. [Google Scholar] [CrossRef]
  31. Liu, B.; Xie, M.; Xu, Z.G.; Kuo, W. An imperfect maintenance policy for mission-oriented systems subject to degradation and external shocks. Comput. Ind. Eng. 2016, 102, 21–32. [Google Scholar] [CrossRef] [Green Version]
  32. Tsai, H.N.; Sheu, S.H.; Zhang, Z.G. A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections. Reliab. Eng. Syst. Saf. 2017, 160, 74–88. [Google Scholar] [CrossRef]
  33. Zhao, X.; Guo, X.X.; Wang, X.Y. Reliability and maintenance policies for a two-stage shock model with self-healing mechanism. Reliab. Eng. Syst. Saf. 2017, 172, 185–194. [Google Scholar] [CrossRef]
  34. Zhao, X.J.; Gaudoin, O.; Doyen, L.; Xie, M. Optimal inspection and replacement policy based on experimental degradation data with covariates. IISE Trans. 2019, 51, 322–336. [Google Scholar] [CrossRef]
  35. Gao, K.Y.; Peng, R.; Qu, L.; Wu, S.M. Jointly optimizing lot sizing and maintenance policy for a production system with two failure modes. Reliab. Eng. Syst. Saf. 2020, 202, 106996. [Google Scholar] [CrossRef]
  36. Chen, K.; Zhao, X.; Qiu, Q.A. Optimal task abort and maintenance policies considering time redundancy. Mathematics 2022, 10, 1360. [Google Scholar] [CrossRef]
Figure 1. A possible sample path of the system.
Figure 1. A possible sample path of the system.
Mathematics 10 02263 g001
Figure 2. The plot of C 1 ( τ 1 ) against threshold τ 1 , and 0 < τ 1 * < τ 2 .
Figure 2. The plot of C 1 ( τ 1 ) against threshold τ 1 , and 0 < τ 1 * < τ 2 .
Mathematics 10 02263 g002
Figure 3. The plot of C 1 ( τ 1 ) against threshold τ 1 , and τ 1 * = 0 .
Figure 3. The plot of C 1 ( τ 1 ) against threshold τ 1 , and τ 1 * = 0 .
Mathematics 10 02263 g003
Figure 4. The plot of C 1 ( τ 1 ) against threshold τ 1 , and τ 1 * = τ 2 .
Figure 4. The plot of C 1 ( τ 1 ) against threshold τ 1 , and τ 1 * = τ 2 .
Mathematics 10 02263 g004
Figure 5. The plot of C 1 ( τ 1 ) for different values of cf.
Figure 5. The plot of C 1 ( τ 1 ) for different values of cf.
Mathematics 10 02263 g005
Figure 6. The plot of C 2 ( τ 1 , N ) against τ 1 and N .
Figure 6. The plot of C 2 ( τ 1 , N ) against τ 1 and N .
Mathematics 10 02263 g006
Table 1. A summary of the existing results on similar topics to this paper.
Table 1. A summary of the existing results on similar topics to this paper.
LiteratureModelsDelayed RepairPolicyOther Factors
Zhang [27]GPRMIndependent of the working time; No costNAverage cost rate
Zhang & Wang [10]EGPRMIndependent of the working time; No costNCold standby and
average cost rate
Zhang & Wang [4]EGPRMIndependent of the working time; No costNAverage reward rate
Zhang & Wang [11]EGPRMIndependent of the working time; No costNAverage cost rate and
average availability rate
Dong et al. [18]GPRMDependent of the working time;
a penalty proportional to the delayed repair time
( T , N τ 1 ) System availability and
average cost rate
Wang et al. [12]EGPRMIndependent of the working time; No costNThe repairman has multiple vacation
This paperEGPRMDependent of the working time;
a penalty proportional to the delayed repair time
( N τ 1 , N ) ,
N τ 1
Average cost rate
Table 2. Optimal τ 1 * and C 1 ( τ 1 * ) obtained for different values τ 2 .
Table 2. Optimal τ 1 * and C 1 ( τ 1 * ) obtained for different values τ 2 .
τ 2 τ 1 * C 1 ( τ 1 * )
33.00004.5377
55.00004.2703
88.00003.9904
109.83983.9459
1510.83304.0076
2012.05094.1864
2513.40934.4771
3014.88714.8706
Table 3. The optimal long-run average cost rates for different values of N.
Table 3. The optimal long-run average cost rates for different values of N.
N23456789
τ 1 * 0003.53866.43048.576910.333311.8186
C 2 ( ( N τ 1 , N ) * ) 9.95987.54536.52306.04695.83725.77235.78685.8386
N1011121314151617
τ 1 * 13.063114.057714.7908 15.277815.565615.714815.781215.8058
C 2 ( ( N τ 1 , N ) * ) 5.89995.95345.99186.01536.02776.03336.03546.0361
Table 4. The comparison between the optimal policy ( N τ 1 , N ) * and N τ 1 * .
Table 4. The comparison between the optimal policy ( N τ 1 , N ) * and N τ 1 * .
N7N
τ 1 * 8.5769 τ 1 * 13.5929
C 2 ( ( N τ 1 , N ) * ) 5.7723 C 1 ( τ 1 * ) 7.0073
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Sun, M.; Dong, Q.; Gao, Z. An Imperfect Repair Model with Delayed Repair under Replacement and Repair Thresholds. Mathematics 2022, 10, 2263. https://doi.org/10.3390/math10132263

AMA Style

Sun M, Dong Q, Gao Z. An Imperfect Repair Model with Delayed Repair under Replacement and Repair Thresholds. Mathematics. 2022; 10(13):2263. https://doi.org/10.3390/math10132263

Chicago/Turabian Style

Sun, Mingjuan, Qinglai Dong, and Zihan Gao. 2022. "An Imperfect Repair Model with Delayed Repair under Replacement and Repair Thresholds" Mathematics 10, no. 13: 2263. https://doi.org/10.3390/math10132263

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop