Next Article in Journal
A Multi-Path Inpainting Forensics Network Based on Frequency Attention and Boundary Guidance
Previous Article in Journal
Enhancing System Reliability and Transient Voltage Stability through Optimized Power Sources and Network Planning
Previous Article in Special Issue
Peak Arm Current Minimization of Modular Multilevel Converter Using Multiple Circulating Current Injection
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Defense and Attack Game Strategies of Dual-Network Coupled CPPS with Communication Edge Failures

1
Information & Telecommunications Company, State Grid Shandong Electric Power Company, Jinan 250013, China
2
Shandong Provincial Key Laboratory of Wireless Communication Technologies, The School of Information Science and Engineering, Shandong University, Qingdao 266237, China
*
Authors to whom correspondence should be addressed.
Electronics 2023, 12(14), 3191; https://doi.org/10.3390/electronics12143191
Submission received: 26 June 2023 / Revised: 14 July 2023 / Accepted: 19 July 2023 / Published: 24 July 2023
(This article belongs to the Special Issue Advancement in Power Electronics and Control)

Abstract

:
With the development of power technology and communication technology, the power grid and power communication network have become interdependent and closely coupled. The load shedding operation of the power grid is an important means to reduce the occurrence of chain faults and ensure the safe and stable operation of the power grid. Based on the transmission of load control services in the communication network, this paper establishes a model for a dual-network coupled cyber physical power system (CPPS). Considering communication edge faults, the associated load capacity of the communication edge and the expected load loss of the power grid are defined. On this basis, the paper proposes a complete information zero-sum game mechanism called “defense attack defense” for communication edge failures, which takes the expected loss of load from the power grid as the benefit. The paper studies the optimal attack and defense game strategies and provides the algorithm implementation process for the three stages of the game. Considering the bandwidth capacity of the communication edge, this paper uses the Dijkstra algorithm or k shortest paths (KSP) algorithm with the cost factor of the communication edge as the weight to plan the main and backup communication channels for multiple load control services. The simulation results show that the game mechanism proposed in this paper can effectively reduce the expected load loss from the power grid and improve the stability of the CPPS.

1. Introduction

With the widespread application of the optical fiber composite overhead ground wire (OPGW), the integration of optical fiber communication technology and transmission technology has deepened the interdependence between power communication networks and power systems. At the same time, the functional coupling of the main power system and the secondary control system have caused the modern power grid to develop into a kind of cyber physical power system (CPPS) [1,2,3] with a dual coupling structure and function. The CPPS system integrates technologies, such as power, communication, sensing, computing, and control, making safe operation and control extremely complex [4,5]. Faults on the power grid or communication network side can lead to cascading failures in the CPPS system [6] and even network crashes. To ensure the safe and stable operation of the CPPS system and avoid the occurrence of chain failures, the system should have the ability to self regulate and reduce system losses. There have been numerous publications on the performance indicators of regulation methods and strategies for the study of CPPS cascading failures and system regulation mechanisms [7,8,9]. To maintain the power balance and stability of the power system, disconnecting a portion of the load from the grid is called load shedding.The load shedding operation of the power grid is an important means to ensure the safe and stable operation of the power grid [10,11], and the value of the load power change caused by the load shedding operation is called the load shedding amount.
The secondary power system undertakes the transmission of load control services, and with the deepening of internet services, the demand for information exchange between internet services and energy services has continued to increase, leading to a further increase in the possibility of attacks on the power communication network. Therefore, in CPPS systems, power communication networks are more prone to malfunctions. In order to reduce the impact of communication network failures on the CPPS, most research has focused on optimizing the routing of service information transmission. For example, Reference [12] achieves service recovery from N-1 faults in the power grid optical communication network by reconstructing routing and reducing the service interruption time. Reference [13] proposes a risk assessment algorithm for power communication service routing, which optimizes the traffic channel of communication risk through a dynamic routing constraint algorithm to reduce the risk of power interruption, Reference [14] proposes ant colony optimization algorithms to optimize the power communication line and obtain the shortest distance and the optimal path. Reference [15] considers the impact of communication link failures in device-to-device (D2D) communication structures on the microgrid (MG), and implements MG control and management through deep learning methods.
The sources of faults in the power communication network can be divided into two categories from the perspective of system management: uncontrollable factors and controllable factors. Communication failures caused by natural disasters, such as hurricanes, rainstorms, and snow disasters [16], are uncontrollable and sudden. To ensure the safe and stable operation of the power communication network, it is necessary to carry out maintenance on communication equipment [17,18]. During the maintenance process that does not meet the distance requirements for live working, maintenance personnel need to cut off the power supply of the optical cable in order to refurbish some equipment on the tower [19,20], resulting in the optical cable not working properly. Therefore, the impact of communication equipment maintenance on the communication network can be regarded as a source of faults and a controllable factor. New technologies and equipment can be adopted to extend maintenance cycles and reduce the probability of fiber optic cable power outages. Both types of fault sources mentioned above can cause communication network failures, resulting in incorrect transmission of power services data.
The topological structure of the power communication network is often represented by a graph composed of communication nodes (CNs) and communication edges (CEs), where CNs correspond to communication sites, CEs correspond to communication lines, and CEs are channels connecting all CNs. According to the different communication technologies used, the CEs of the power communication network are divided into wired CEs and wireless CEs. Wired CEs refer to optical cable links that use optical communication technologies such as the synchronous digital transport system (SDH) and optical transmission network (OTN) [21,22] with a wide coverage area and long communication distance. Wireless CEs refer to communication lines that use wireless communication technologies such as 2G/3G/4G/5G with a small coverage range and a close communication distance. During the operation of the power communication network, the protection measures of CNs are relatively flexible, while CEs are difficult to maintain and are greatly affected by external factors, resulting in a high probability of failure [23]. For example, in power systems with a large number of distributed energy resources (DER), there are a large number of Internet of Things (IoT) devices connected to the power communication network. Compared to traditional power networks, CEs are more susceptible to faults caused by human or natural factors [24]. Therefore, the paper ignores CN faults and focuses on studying communication network faults caused by CE faults.
On the other hand, game theory, as an important discipline of operations research, is one of the mathematical methods used to study the phenomenon of competition between members who participate in a game. It can effectively make logical decisions on events with an antagonistic nature and is widely used in many fields. For example, Reference [25] uses the noncooperative Stackelberg game theory model to study the management of a green electric vehicle energy network. According to the energy consumption and unit energy price required for charging and discharging, the Nash equilibrium solution of charging and discharging is obtained, and the energy network management scheme of electric vehicles is generated. Reference [26] considers distributed generation operators, distribution network operators, and power users and proposes a multi-agent collaborative planning method based on noncooperative game theory, which balances the economic benefits of each agent. Reference [27], based on the virtual power plant platform, uses the multi-agent reinforcement learning strategy to realize game behavior among multiple power generation enterprises, energy storage enterprises, and load users and works out the Nash equilibrium solution for the total income of the game participants to maximize the overall income of each participant.
From the perspective of the interaction between the power communication network and the power network, based on the load shedding operation and the transmission of load control services in the power network, this paper establishes a CPPS model for the coupling of the power network and the power communication network. The communication network adopts the main and backup routing methods, plans communication channels for multiple load control services, and describes the importance of CEs based on the associated load capacity. Furthermore, when given the probability of CE failure, the expected load loss of the power grid is defined to measure the impact of communication network failures on the power grid. On this basis, a three-stage zero-sum game mechanism of the CPPS is proposed based on the expected loss of load from the power grid. The attacker attacks the CE edge, and the defender plans a new load control service channel for defense. The Dijkstra algorithm or KSP algorithm is used for load control service channel planning. The paper studies the optimal attack strategy and optimal defense strategy and conducts algorithm implementation and simulation experiments.

2. CPPS System Model

2.1. Model Composition

The CPPS system model coupled with power and communication networks is shown in Figure 1. The system model consists of a power network and a communication network, which are abstracted from the main power system and the secondary control system, respectively. The power generation equipment and users of the main power system are power nodes (PNs), and the transmission and distribution lines are abstracted as power edges. In the secondary control system, data collection devices and monitoring control devices are abstracted as remote terminal unit (RTU) nodes (RNs), and relay stations, regional control nodes, and data processing devices are abstracted as access nodes (ANs), backbone nodes (BNs), and dispatch nodes (DNs), collectively referred to as communication nodes (CNs). The communication lines between CNs are called CEs, and wireless communication is used between RTU nodes, while wired communication is used between other nodes, such as OPGW fiber optic communication. The RN of the communication network is connected to the PN of the power network one-by-one, and the line connecting the two is called the coupling edge.
The numbers of communication networks (CNs) and CEs are set as N and M, where the numbers of DN, BN, AN, and RN are  N D N B N A , and  N R N = N D + N B + N A + N R . The set of communication node numbers is represented by  Ω = 1 , 2 , , N , and the sets of numbers for DN, BN, AN, and RN are represented by  Ω D Ω B Ω A , and  Ω R , which satisfies  Ω = Ω D + Ω B + Ω A + Ω R . The connections between communication nodes can be described by the adjacency matrix  C = { c i j , i Ω , j Ω } . When there is a CE between the i-th CN and the j-th CN,  c i j = 1 . Otherwise,  c i j = 0 . The set of directed CEs in a communication network can be represented by  E = ( i , j ) c i j = 1 , i Ω , j Ω , where  ( i , j )  represents the directed CE from the i-th CN to the j-th CN, with two directed CEs corresponding to one undirected CE.

2.2. Cost Factor of the CE

The communication network carries power service data, and service data pass through multiple CNs and multiple CEs from the source node to the destination node. The physical properties of CNs and CEs play important roles in the selection of service routes. We ignore the CN and define the parameters related to the CE. From the CPPS system model presented in Figure 1, it can be seen that the communication network includes a wired CE and a wireless CE. For the wired CEs  ( i , j ) E , the cable length, bandwidth capacity, and reliability coefficient are set as  L i j B i j max , and  R i j , respectively. The reliability coefficient  R i j  is related to factors, such as the type of CE and its operating year. The service data are transmitted from an optical cable with a length of  L i j , the transmission delay value is  D i j = L i j L i j c c , and the speed of light is c. Taking into account the reliability  R i j  and delay  D i j  of the CE, the cost factor  W i j  for data transmission on CE ( i , j )  is defined as
W i j = D i j D i j R i j R i j max D i j D i j R i j R i j
Considering the use of wireless communication between RN nodes in the communication network, compared to fiber optic communication between other nodes, the transmission rate of wireless communication is much lower than that of fiber optic communication, and the cost of a CE between RN nodes is greater than that of other CEs. When planning service communication channels, the cost factor of a CE can be used as the weight of the CE to calculate the total weight of all CEs on the channel and select the channel with a smaller weight. The bandwidth capacity of a CE determines the ability to carry services on that CE, and the bandwidth usage of all services carried on a CE cannot exceed the bandwidth capacity.

2.3. Communication Channel Planning for the Power Network Load Control Service

The degree to which the load shedding of the power grid is affected is an important indicator for measuring the stability of the power grid. To ensure the stable operation of the power grid, the CPPS monitors and regulates the operational status of the power grid. The RN collects power grid data and uploads them to the DN through the CN. The DN adopts corresponding control strategies to calculate the load shedding of power nodes, form the load control service (LCS) of the power grid, and search for communication channels for it. According to the planned communication channel, load control services are transmitted down to the RN through the BN and the AN, controlling the PN connected to the RN for load shedding operations. Load control services are transmitted in the direction of DN → BN → AN → RN and cannot be transmitted in reverse. Therefore, the cost factor of a CE that is not allowed to participate in load control service transmission is set to infinity. In all CNs,  W i j ( 0 ) = , when  i Ω B , j Ω D i Ω A , j Ω B  or  i Ω R , j Ω A . The cost factors of all CEs in the entire communication network are represented in matrix form, and the inherent cost factor matrix of the communication network is defined as  W ( 0 ) = W i j , ( i , j ) E . At the same time, the initial bandwidth occupation matrix of the communication network is defined as a full zero matrix,  B ( 0 ) = { 0 , ( i , j ) E } .
Let the CPPS generate K grid load control services at a certain time, and use the set  Λ  =  { 1 , 2 , , K }  to represent their numbered set. The k-th LCS can be represented by  L ( k ) = ( s ( k ) , d ( k ) , α k , b k ) . Among them,  s ( k ) Ω D  is the source node of the services,  d ( k ) Ω R  is the destination node,  α k  is the load shedding of the power node associated with the destination node  d ( k ) , and  b ( k )  is the communication bandwidth occupied by the LCS.
When planning communication channels for power grid load control services, the “1 + 1” main backup mode is adopted to plan the main backup communication channels for it. For the k-th service, we define the main and backup communication channel matrices  X k = { x i j ( k ) , i Ω , j Ω }  and  Y k = { y i j ( k ) , i Ω , j Ω } . If the transmission of the services passes through CE ( i , j ) E , the elements  x i j ( k )  and  y j i ( k )  in the i-th row and j-th column of the matrix have values of 1; otherwise, they have values of 0. At the same time, the main and backup communication channels meet the nonintersection condition of CEs:
x i j k + x j i k + y i j k + y j i k 1 , k Λ , i Ω , j Ω
Considering the bandwidth capacity limitations of CEs and the main and backup mechanisms of services, the selection of communication channels for different services and the selection of the main and backup channels for the same service both require the cost factor matrix and bandwidth occupancy matrix of the communication network to be updated.

2.4. Expected Load Loss from the Power Grid during CE Failure

The communication network carries K load control services, and each CE can carry multiple load control services. If a CE malfunctions, the data from all services it carries cannot be correctly transmitted to the destination node, and the corresponding PN cannot accurately perform load shedding operations, thereby affecting the stable operation of the power grid. Therefore, the importance of a CE can be represented by the associated load, and the associated load  I i j  of a CE is represented as
I i j = k = 1 K α k ( x i j k + y i j k + x j i k + y j i k ) , ( i , j ) E
In the above equation,  I i j = I j i .
When service data cannot be reliably transmitted on a CE, it is said that the CE has malfunctioned. Considering that communication networks have inherent protection or defense mechanisms, when a CE is affected by various uncontrollable or controllable factors, service data on a CE may not be reliably transmitted with a certain probability. In this paper, protective mechanisms or defensive measures are quantitatively represented as defensive resources. If there is a large number of defense resources, there is a low probability of CE failure; if the number of defense resources is small, the probability of CE failure is high.
If the probability of CE ( i , j )  failure is  p i j , then the expected load loss value corresponding to the CE is  G i j = p i j I i j . The CE with the highest expected load loss value is defined as the most important CE, represented as
( i , j ) * = arg max ( i , j ) E G i j
The higher the value of  G i j , the greater the importance or fragility of the CE. To reduce the impact of communication network failures on the power grid, more defense resources should be allocated to important CEs.
The sum of the expected load loss values of all CEs in the entire communication network and all attacked CEs in the communication network is defined as the expected load loss from the power network. For M CEs in the communication network, define 0–1 variables  z i j  and  z j i  to indicate whether the CE is under attack. For example,  z j i = z i j = 1  indicates that CE ( i , j )  and CE ( j , i )  are under attack; otherwise,  z j i = z i j = 0 . The expected load loss from the power grid is expressed as
G = ( i , j ) E z i j G i j
The expected load loss can be used as a quantitative indicator to characterize the degree of impact of communication network faults on the power grid. The key symbol table is as Table 1:

3. CPPS Attack and Defense Game for CE Faults

When a certain CE side fails, it may prevent the successful transmission of some power grid load control services, affecting the load shedding of the power grid and disrupting the stable operation of the CPPS. At this point, the CPPS system should have the ability to adapt and self regulate, searching for new communication channels for power grid load control services and reducing the impact of CE faults. The anomaly detection and intrusion detection system can determine the location of the attacked CE for the system administrator of the CPPS and issue an alarm to remind management personnel to prepare strategies for the failure of CE after being attacked. Therefore, deploying and upgrading anomaly detection and intrusion detection systems can improve the efficiency of CPPS when responding to attacks.
The zero-sum game is a branch of game theory, which means that users who participate in the game compete very strictly with each other. The gain of one user corresponds to the loss of other users, and the sum of the gains and losses of all users is always zero. Considering the source of CE faults as an attack, the CPPS system’s response to CE faults is viewed as a defense, and a fully informative dynamic zero-sum attack defense game model  T = A , D , S A , S D , U A , U D  is proposed to describe it. A is the attacker, D is the defender,  S A  is the set of attack strategies, and  S D  is the set of defense strategies.  U A  and  U D  respectively represent the benefits of the attacker and defender, satisfying  U A = U D . The strategic actions taken by the attacker and defender have a sequential order, and both parties in the game have a complete understanding of CPPS information, fully understand the strategies adopted by both parties, and know the benefits of various game situations for both parties. In a game, the attacker and defender adopt attack or defense strategies to maximize their own profits, which is a noncooperative game.
Specifically, the communication network of the CPPS has M CEs, and attacker A is defined as the factor causing CE failure, for example, natural factors, such as hurricanes and lightning, as well as human interference factors, such as cutting off optical cables and injecting false data. Defender D is defined as the automatic maintenance program or the CPPS administrator of the CPPS system, and the attacker’s profit is defined as the expected load loss  U A = G  of the power grid. For attackers, the attack strategy is to select m out of M CE edges for attack with a total of  C M m  attack strategies. For defenders, in order to counter the attacked CE, mobilize defense resources, and adopt various methods and measures to reduce the probability of CE damage, at the same time, it is necessary to plan new communication channels for load control services to reduce the expected load loss from the power grid.
As shown in Figure 2, the game process adopts a three-stage process of defense–attack–defense, which is described as follows:
Stage 1:
Defense stage
To ensure the safe transmission of power grid load control information, the defender plans the initial communication channel for all power grid load control services. The associated load  I i j  of each CE is calculated using Equation (3) to determine the importance of the CE. According to the importance of the CE, defense resources are allocated to the CE, the probability of CE failure after being attacked is reduced, and the load loss from the power grid is reduced.
Stage 2:
Attack stage
Under the assumption of a complete information game, attacker A knows the communication channels of all LCSs in the first stage and the allocation of defense resources to each CE. On this basis, the attacker develops optimal attack strategies to attack the CE, leading to the possibility of CE failure. A malfunctioning CE will block the transmission of LCSs on that CE, resulting in the destination node of the LCS, the RN corresponding to the LCS, not being able to successfully receive this information, ultimately resulting in an inability to complete the load shedding operation and increasing the expected load loss from the power grid.
Stage 3:
Defender response stage
The communication network is under attack, and the dispatch center in the communication network issues an alarm. Defenders adopt defense strategies based on the attack situation of the communication network, and re-plan the main and backup communication channels for load control services to minimize the load loss from the power network.
In the above three stages, the defender first plans the initial communication channel and defends against important CEs. Under the assumption of a complete information game, both attack and defense parties are aware of various parameters in the power communication network. Therefore, based on various information in the current power communication network, the attacker aims to maximize the expected load loss from the power network and launch an attack on the CE. Finally, the defender adjusts the communication channel of the attacked power communication network to reduce the expected load loss from the power network. Using the expected loss of load from the power grid as the revenue indicator of the entire game can accurately reflect the impact of LCS transmission obstruction on the normal operation of the power grid.

4. Optimal Attack and Defense Strategies of CPPS Offensive and Defense Games

4.1. Initial Communication Channel Planning and Defense Resource Allocation for the LCS

In the first stage, the defense behavior of the defender includes initial communication channel planning for load control information and defense resource allocation. The Dijkstra algorithm is used to select the main and backup communication channels for K services, and defense resources are allocated based on the importance of the CE, reducing the probability of important CE failures.

4.1.1. Initial Communication Channel Planning for the LCS

The Dijkstra algorithm is a greedy algorithm that is used for finding the shortest path of a weighted graph, which can find the shortest path from the source node to the destination node. For the communication network of the CPPS, the data transmission cost factor defined in Equation (1) is used as the weight of the CE to find the path with the minimum sum for the cost factors of the CE that the services passes through. Considering the bandwidth capacity limitations of the CE and the main and backup mechanisms of services, the selection of communication channels for different services and the selection of the main and backup channels for the same service both require the cost factor matrix and bandwidth occupancy matrix of the communication network to be updated. For the LCS numbered  k 1 , when the communication channel planning is completed, the bandwidth occupation of CE ( i , j ) E  is
B i j ( k 1 ) = n = 1 k 1 ( x i j ( n ) + y i j ( n ) + x j i ( n ) + y j i ( n ) ) · b ( n )
Assuming  B i j ( k 1 ) < B i j max , the bandwidth occupation matrix of the communication network is  B k 1 = { B i j k 1 , ( i , j ) E } , and the cost factor matrix is represented as  W ( k 1 ) = { W i j ( k 1 ) , ( i , j ) E } . For the k-th load control service  L ( k ) , the bandwidth is  b ( k ) . To prevent CE in the communication channel not meeting the bandwidth capacity limit, the estimated bandwidth usage of the CE is calculated and denoted as
B ^ i j ( k ) = B i j ( k 1 ) + b ( k ) , ( i , j ) E
When the estimated bandwidth usage of the CE exceeds the bandwidth capacity, it cannot participate in the transmission of services. The cost factor of the CE can be set to infinity; that is, when  B ^ i j ( k ) B i j max W i j ( k ) = , ( i , j ) E . The cost factors of other CEs remain unchanged, and the cost factor matrix is updated to  W ( k ) . Furthermore, it is determined that the main communication channel of  L ( k )  is  X ( k ) , and it is assumed that the CE set contained in  X ( k )  is
E * = ( i , j ) E x i j ( k ) + x j i ( k ) = 1
The sum of the cost factors of all CEs included in  E * W * = ( i , j ) E * W i j ( k )  has the smallest value. When searching for the backup channel matrix  Y ( k ) , in order to satisfy the conditions of Equation (2), the cost factor of CE that  X ( k )  passes through is set to infinity and represented as
W i j ( k ) = , ( i , j ) E *
The cost factors of the other CEs remain unchanged, and the cost factor matrix  W ( k )  is updated. The backup communication channel used for planning  L ( k )  is  Y ( k ) , and the bandwidth occupancy matrix of the communication network is
B k = B k 1 + b k [ X k + ( X k ) T + Y k + ( Y ( k ) ) T ]
In addition, considering the different load shedding  α ( k )  corresponding to each service, the impact on the load shedding of the power grid is also different. When planning communication channels, they are rearranged in the order of  α ( k )  from top to bottom. LCS’ with higher values of  α ( k )  have higher priority and prioritize the finding of communication channels. The number set after LCS reordering is set as  Λ ˜ = λ 1 , λ 2 , , λ K , where the number of the services with the highest load shedding is  λ 1 , and so on. For convenience of expression, the new sequence number of the LCS with the original number  λ 1  is still  k = 1 , and so on. The new sequence number of the LCS with the original number  λ K  is  k = K . The main and backup communication channels are planned one-by-one for K load control services in a new order. The steps are as follows:
Step 1:
Reorder the load control service numbers and obtain  Λ ˜ . Set  k = 1 .
Step 2:
According to Equation (7), calculate the estimated bandwidth usage of the CE and update the cost factor matrix  W ( k ) .
Step 3:
Using the Dijkstra algorithm, determine the main channel matrix  X ( k ) . According to Equation (9), update the cost factor matrix  W ( k ) .
Step 4:
Using the Dijkstra algorithm, determine the backup channel matrix  Y ( k ) . According to Equation (10), update the bandwidth occupancy matrix  B ( k ) .
Step 5:
Let  k = k + 1 , and end when  k > K  is met; otherwise, go to step 2.

4.1.2. Defense Resource Allocation

There are M CEs in the communication network, and defense resources with a total amount of  γ  are allocated to CEs in L rounds. Each round allocates defense resources  γ γ L L  to the most important CEs. To improve the utilization of defense resources, select the edge with the highest expected load loss, that is, the most important edge, to allocate defense resources, and reduce the expected load loss value of the entire system.
According to Section 4.1.1, plan the main and backup channels for K power grid control services, which can carry multiple services on the CE. Calculate the associated load  I i j  of the CE using Equation (3). When there are no defense resources, the probability of a CE being attacked and failing is 1. As defense resources are allocated to the CE, the probability of its failure gradually decreases. Assuming that the defense resources possessed by the  ( n 1 ) -th and n-th rounds of the directed CE ( i , j ) E  are  f i j ( n 1 )  and  f i j ( n ) , respectively, and their probabilities of failure after being attacked are  p i j ( n 1 )  and  p i j ( n ) , then  f i j ( n ) f i j ( n 1 ) p i j ( n ) p i j ( n 1 )  and
p i j ( n ) = 1 1 + f i j ( n ) , ( i , j ) E
The expected load loss value of a CE in the n-th round is
G i j ( n ) = p i j ( n ) · I i j , ( i , j ) E
The CE with the largest  G i j ( n )  is the most important CE, denoted as
( i * , j * ) = arg max ( i , j ) E G i j ( n )
CE ( i * , j * )  obtains defense resources for this round, and the calculation formula for the amount of defense resources it possesses is
f i * j * ( n ) = γ L + f i * j * ( n 1 )
Other edges with expected load losses of less than CE ( i * , j * )  do not obtain defense resources, and the defense resource amount remains unchanged.
f i j ( n ) = f i j ( n 1 ) , ( i , j ) E \ ( i * , j * )
The defense resource allocation steps are as follows:
Step 1:
Set the defense resources and initial failure probability of each CE ( i , j ) E  to  f i j ( 0 ) = 0 , p i j ( 0 ) = 1 , respectively. Set  n = 0 .
Step 2:
Calculate the expected load losses of all CEs according to Equation (12).
Step 3:
According to Equation (13), find the most important CE ( i * , j * ) .
Step 4:
According to Equations (14) and (15), allocate defense resources  γ γ L L  to  ( i * , j * ) , while other CEs are not allocated defense resources.
Step 5:
According to Equation (11), calculate the failure probability  p i j = p i j ( n )  of a CE being under attack.
Step 6:
Let  n = n + 1 , and end when  n > L ; otherwise, go to step 2.
It can be seen that the defense resource allocation steps adopted can enable CEs with high expected load loss values to obtain more defense resources, reducing their failure probability and thus reducing the expected load loss for the entire power grid.

4.2. Attack Strategy Selection Based on the Maximum Expected Load Loss in the Power Grid

Attackers obtain the importance information of a CE in the CPPS, adopt the best attack strategy, launch an attack, and maximize the expected load loss from the power grid. For attackers, the attack strategy is to select m out of M CEs for attack, having a total of  C M m  attack strategies. The attack matrix is defined as  Z = { z i j , i Ω , j Ω } . It is a binary symmetric matrix, and its dimensions are  N × N . If attacking m edges, there are  2 m  elements in  Z  that are valued at 1, and the others are valued at 0. Set all possible sets of  C M m  attack matrices to  Ψ . From the first stage of the game, it can be seen that after a CE is allocated defense resources, the probability of failure after being attacked is  p i j . Define the failure probability matrix  P = { p i j , i Ω , j Ω }  for all CEs in the communication network under attack. For the k-th LCS, assuming that CEs do not affect each other and use the main communication channel  X k  for transmission, the probability of service transmission failure is
μ k = i = 1 N j = 1 N z i j · p i j · x i j k
Equation (16) can be expressed in matrix form as
μ k = Z · P · X ( k ) m 1
where · represents the dot product of the matrix, and  m 1  represents the  m 1 -norm of the matrix, which is the sum of the absolute values of all elements in the matrix, such as  C m 1  =  i = 1 N j = 1 N C i j . Similarly, if backup communication channel A is used for transmission, the probability of service transmission failure is
λ k = Z · P · Y ( k ) m 1
For K load control services for the entire power grid, the main and backup communication channels work independently, and the expected load loss caused by service transmission failure in the power grid is
f ( Z ) = k = 1 K α ( k ) ( μ k + λ k ) = k = 1 K α ( k ) Z · P · ( X ( k ) + Y ( k ) ) m 1
The optimal attack matrix can be expressed as
Z * = arg max Z Ψ f ( Z )
In the attack matrix, set  Ψ , select  Z *  that maximizes  f ( Z )  as the attack matrix, determine the CE to attack, and carry out the attack. At this point, the calculation formula for the expected load loss of the power grid is
G = k = 1 K α ( k ) Z * · P · ( X ( k ) + Y ( k ) ) m 1

4.3. Optimization of the Communication Channel for the Power Network Load Control Service Based on the KSP Algorithm

In the third stage, based on the probability of CE failure when attacked and the optimal attack matrix, the defender re-plans the main and backup communication channels for each LCS to minimize the expected load loss from the power grid. From the second stage of the game, it can be seen that the attack matrix is  Z * , the communication network CE failure probability matrix is  P , and the set of the main and backup channel matrices of all K LCSs is  Φ X = X ( k ) , k Λ  and  Φ Y = Y ( k ) , k Λ , respectively. Therefore, the expected load loss from the power network caused by this attack matrix is
g ( Φ X , Φ Y ) = k = 1 K α ( k ) Z * · P · ( X ( k ) + Y ( k ) ) m 1
Given the communication network, the corresponding matrix sets  Φ X *  and  Φ Y *  and the main and backup channels for each LCS are simultaneously found to minimize the expected load loss of the entire power network, represented as
Φ X * , Φ Y * = arg min Φ X , Φ Y g ( Φ X , Φ Y )
The optimization problem that uses Equation (23) as the objective function has high complexity. To simplify the operation, the K-shortest paths (KSP) algorithm is used for a class exhaustive search to find a possible set of main and backup channels. Under the condition of meeting the CE bandwidth capacity of the communication network, with the aim of minimizing the expected load loss from the power network, the optimal set of main and backup channels for K LCSs is selected.

4.3.1. The KSP Algorithm Obtains the Set of Main and Backup Channels

For the k-th LCS  L ( k ) ( k Λ ) , use the KSP algorithm to search for  N k  possible main communication channels. For each possible main communication channel, search for  N k , n ( n = 1 , 2 , , N k )  possible backup communication channels. For LCS k, let the set of  N k  possible main communication channels be represented as  Π k = { X n k , n = 1 , 2 , , N k } . For any possible main communication channel  X n k Π k , the corresponding set of  N k , n  possible backup communication channels is represented as  Θ k , n = { Y n , l k , l = 1 , 2 , , N k , n } , and the set of backup channels corresponding to the main channel set  Π k  is represented as  Υ k = { Θ k , n , n = 1 , 2 , , N k } . For any  X n k Π k , the cost factor of the communication network CE ( i , j ) E  is  W i j ( k , n ) , and the cost factor matrix is  W ( k , n ) . When searching for the backup communication channel  Y n , l k Θ k , n  for  X n k , the cost factor needs to be updated. Similarly to Equation (9), let the CE set contained in  X n k  be  E * * , and set the cost factor  W i j ( k , n )  of the CE passed by  X n k  to infinity, denoted as
W i j ( k , n ) = , ( i , j ) E * *
The cost factors of other CEs are the same as the inherent cost factor matrix  W ( 0 )  of the communication network and remain unchanged:
W i j ( k , n ) = W i j ( 0 ) , ( i , j ) E * *

4.3.2. Select the Optimal Set of Main and Backup Channels for K LCSs

Select an element from  Π k  as the main channel set  X ( k )  of the k-th service, and select one element from its corresponding backup channel  Θ k , n  as the backup channel  Y ( k ) . Assuming  Φ X = X ( k ) , k Λ  and  Φ Y = Y ( k ) , k Λ , there are  ρ  possible combinations of main and backup channel matrices, represented as
ρ = k = 1 K n = 1 N k N k , n
Let the combination of  ( Φ X , Φ Y )  have U types. The u-th combination is represented by  Φ X ( u ) = { X u ( k ) , k Λ } Φ Y ( u ) = { Y u ( k ) , k Λ } . For the pair of main and backup channels  X u ( k )  and  Y u ( k )  of the k-th LCS, the expected load loss from the power grid is
h ( X u ( k ) , Y u ( k ) ) = ( i , j ) E α ( k ) Z · P · ( X u ( k ) + Y u ( k ) ) m 1
The expected load loss from the power grid considering the entire LCS transmission is
g ˜ ( Φ X ( u ) , Φ Y ( u ) ) = k Λ h ( X u ( k ) , Y u ( k ) )
At this point, Equation (23) can be converted to
Φ X * , Φ Y * = arg min u g ˜ ( Φ X ( u ) , Φ Y ( u ) )
At the same time, considering the bandwidth capacity limitation of the communication network CE, for the pair of main and backup channels  X u ( k )  and  Y u ( k )  of the k-th LCS, according to Equation (6), it can be seen that the bandwidth occupancy matrix of all CEs in the communication network is represented as
B ( X u ( k ) , Y u ( k ) ) = b k [ X u ( k ) + ( X u ( k ) ) T + Y u ( k ) + ( Y u ( k ) ) T ]
Then, the bandwidth occupancy matrix of all LCS is
B ˜ ( Φ X ( u ) , Φ Y ( u ) ) = k Λ B ( X u ( k ) , Y u ( k ) )
Then, the element  B ˜ ij  in the i-th row and j-th column of the bandwidth occupancy matrix  B ˜ ( Φ X ( u ) , Φ Y ( u ) )  needs to satisfy
B ˜ i j B i j max , ( i , j ) E

4.3.3. Steps for Optimizing the Communication Channel of the LCS

The steps for re-planning communication channels  Φ X *  and  Φ Y *  for all LCSs are as follows:
Step 1:
k = 1 n = 1 .
Step 2:
According to matrix  W ( 0 ) , apply the KSP algorithm to plan the set of  N k  possible main communication channels  Π k .
Step 3:
Update the cost factor matrix  W ( k , n )  for the possible main communication channel  X n k Π k  according to Equations (24) and (25), apply the KSP algorithm, and plan a set of  N k , n  possible backup communication channels  Θ k , n .
Step 4:
n = n + 1 , when  n > N k . Determine the set  Υ k ; otherwise, go to step 3.
Step 5:
k = k + 1 . When the condition  k > K  is met, end and obtain  ρ  possible combinations of the main and backup channel matrices; otherwise, proceed to step 2.
Step 6:
Calculate the expected loss in the load and bandwidth occupancy matrix of the power grid based on Equations (28) and (31) for all main and backup channel matrix combinations.
Step 7:
According to Equations (29) and (32), determine the optimal combination of main and backup channel matrices with the minimum expected load and bandwidth constraints.
Therefore, after the third stage of the game, if the new main and backup channel matrices for the k-th LCS are  X ( k ) Φ X * Y ( k ) Φ Y * . The calculation formula for the expected load loss from the power grid that has gone through the three stages of the game is
G = k = 1 K α k Z * · P · ( X ( k ) + Y ( k ) ) m 1

5. Experimental Simulation and Analysis

This paper used the power and communication networks of some cities in Shandong Province as examples for the experimental simulation and studied the CPPS game mechanism and strategy proposed in the paper.

5.1. Experimental Parameter Settings

The topological structure of the communication network is shown in Figure 3. It includes 30 CNs and 45 undirected CEs. The numbering sets of the four types of nodes, DN, BN, AN, and RN, in the CN are  Ω D = { 14 , 19 } Ω B = { 7 , 15 , 16 , 17 , 18 , 20 , 28 } Ω A  =  { 5 , 6 , 8 , 13 , 21 , 22 , 25 , 29 } , and  Ω R = { 1 , 2 , 3 , 4 , 9 , 10 , 11 , 12 , 23 , 24 , 26 , 27 , 30 } .
The DN, BN, and AN nodes use fiber optic communication, while the RN communicates wirelessly, with one RN corresponding to one PN node. In Figure 3, the length  L i j  of the cable CE is marked on the line segment, and the reliability coefficient  R i j  is set to 100. Considering that the cost factor for data transmission in a wired CE ranges from 0 to 1, the cost factor for the wireless communication CE is set to 1. In addition, the bandwidth capacity  B i j max  of all CEs in the communication network is set to 14 Mbps.
For the load control service  L ( k ) = ( s ( k ) , d ( k ) , α k , b k ) , k Λ , the source node  s ( k )  and destination node  d ( k )  are randomly selected from the set  Ω D  and  Ω R  according to the uniform distribution. Load shedding  α k  follows a normal distribution for the mean  μ  and variance  σ 2 , the bandwidth  b k  is set to 2 Mbps, and the number of rounds of defense resource allocation in the first stage of the game is  L = 45 .
In the first stage of the game, due to the sparsity of the experimental topology and the use of multiple Dijkstra algorithms during initial communication channel planning, the algorithm complexity of the initial communication channel planning is  O ( 2 K ( M + N log N ) ) . At the same time, in this stage, the algorithm’s complexity for defense resource allocation is  O ( L M ) . In the second stage of the game, the algorithm’s complexity for the optimal attack strategy is  O ( m M ) . In the third stage of the game, the algorithm’s complexity when using the KSP algorithm to plan the possible main and backup communication channels is  O ( K N ( N a + N b ) ( M + N log N ) ) , and the algorithm’s complexity when selecting the optimal communication channel is  O ( K N a N b ) . Therefore, the algorithm’s complexity of the game mechanism proposed in this article is  O ( 2 K ( M + N log N ) + ( L + m ) M + K N ( N a + N b ) ( M + N log N ) + K N a N b ) .

5.2. Simulation Experiment on the Three-Stage Process of CPPS Attack and Defense Game

In the experiment, it is assumed that the mean and variance of the normal distribution are  μ = 60  and  σ 2 = 20 , and the communication network generates  K = 7  power network load control services at the same time. The parameter information of the LCS is shown in Table 2.
In the three stages of the game, the relevant parameters are set as follows: In the first stage of the game, the total amount of defense resources is  γ = 4.5 , In the second stage of the game, the attacker selects the number of communication edges to attack,  m = 4 . In the third stage of the game, the number of possible main and backup communication channels is  N a = N b = 2 . In the first stage of the game, with the cost factor of the CE as the weight, initial communication channel planning is carried out for seven LCSs. The main and backup channels contain the CE, as shown in Table 3.
In the first stage of the game, defense resources are allocated to CEs. Among them, certain defense resources are allocated to CEs (6,4), (4,6), (7,6), (6,7), (9,7), (7,9), (13,15), (15,13), (14,7), (7,14), (14,15), (15,14), (16,8), (8,16), (16,17), (17,16), (17,20), (20,17), (18,19), (19,18), (19,20), and (20,19). The failure probabilities  p i j  during attack are 0.769, 0.769, 0.769, 0.769, 0.769, 0.833, 0.833, 0.833, 0.833, 0.472, 0.472, 0.833, 0.833, 0.714, 0.714, 0.769, 0.769, 0.909, 0.909, 0.625, 0.625, 0.556, and 0.556, respectively. Other CEs are not allocated defense resources, so their probability of failure when attacked is  p i j = 1 .
In the second stage of the game, the CEs corresponding to the optimal attack matrix  Z *  are (4,6), (6,7), (3,8), and (16,17). At this point, the attack benefit  U A , i.e., the expected loss of load G from the power grid, is 417.88 MW.
In the third stage of the game, communication channel optimization is carried out for the LCS, and the CE of the new main and backup communication channels is shown in Table 4.
Comparing Table 2 and Table 3, it can be seen that after the third stage, the main communication channels of the second and third LCSs and the backup communication channels of the first, second, and third LCSs have been optimized after searching for new communication channels for the attacked edges. For example, for the first LCS, the optimized main communication channel avoids the attacked edges (6,7), while the backup channel avoids the attacked edges (16,17). According to Equation (33), the expected load loss from the power grid in the third stage of the game is. Compared to the expected loss of load in the second stage of the game, the expected loss of load in the third stage decreased by 175.39 MW, a decrease of 41.972%. This game process simulation is based on the i7-12700 processor, which only takes 0.7394 s.

5.3. Research on the Performance of the CPPS Game Mechanism

According to the three-stage attack and defense game process proposed in the paper, it can be seen that parameters  γ ,   m ,   N a , and  N b  all affect the expected loss of load G in the third stage of the game. Based on the parameter settings presented in Section 5.1, the following is a specific study of the impact of each parameter on the expected loss of load G in the third stage of the game. In the simulation experiment, the Monte Carlo method is used. The average expected loss of load in the third stage of the game with multiple experiments is taken as the experimental result, and the number of Monte Carlo experiments is 1000. In the experiment, the number of concurrent LCS is relatively small, and the bandwidth resources of the communication network are relatively sufficient. There is no blocking in the planning of LCS channels; that is, each service will obtain the planning details from the main and backup communication channels.
In summary, in the topology of some real power communication networks in Shandong Province, assuming the presence of seven LCSs at the same time, the expected load loss from the power network is significantly reduced after the system experiences a complete game mechanism, and the game mechanism consumes an extreme amount of time, indicating the efficiency of the game mechanism proposed in this article.

5.3.1. The Influence of Total Defense Resources  γ  and the Attack CE Number m on the Expected Loss of Load G in the Third Stage of the Game

The values of the numbers of main and backup communication channels  N a  and  N b  remained unchanged, and the effects of the total defense resources  γ  and the number of attacked CEs m on the expected loss of load G in the third stage of the game were studied.
Figure 4 shows the curve of the expected loss of load G in the third stage of the game as a function of the total defense resources  γ  when  N a = 2 N b = 2 . It can be seen from Figure 4 that, given the number m of attacked CEs and the number  N a , N b  of main and backup channels searched in the third stage of the game, the expected load loss G in the third stage of the game will gradually decrease with an increase in the total defense resources  γ . When  γ  is valued from 0 to 4.5, G rapidly decreases. When  γ  is valued from 4.5 to 10.5, the speed of G decrease slows down and approximates a linear decrease. When  γ  is greater than 10.5, the speed of G further slows down. For example, given  m = 5 N a = 2 N b = 2  and  γ  values of 0 and 4.5, the corresponding G values are 753.407 MW and 433.578 MW with a difference of 319.829 MW. However, when the  γ  values are 9.5, 10, and 10.5, the G values are 193.280 MW, 188.077 MW, and 183.229 MW with differences of 5.203 MW and 4.848 MW, and the difference decreases. The reasons for the analysis are as follows.
When the number of rounds of defense resource allocation is fixed, the number of total defense resources  γ  increases, and the number of defense resources  γ γ L L  allocated in each round increases. In the n round of allocation, the defense resource  f i * j * ( n )  of the CE ( i * , j * )  allocated with defense resources increases. After all defense resources have been allocated, the defense resources of each CE in the network remain unchanged or increase compared to the situation where the total number of defense resources  γ  is small. According to Equation (11), the more defense resources CE ( i , j )  is allocated, the lower the probability  p i j  of being attacked by a failure. Therefore, as the total amount of defense resources  γ  increases, the probability of each CE in the network being attacked and malfunctioning remains unchanged or decreases. According to Equation (12), the smaller the probability of CE ( i , j )  being attacked by a fault, the smaller its corresponding expected loss of load  G i j  is. According to Equation (5), the expected loss of load from the power grid is the sum of the expected losses of all CEs in the entire communication network, ultimately leading to a decrease in the expected loss of load G in the third stage of the game. Moreover, according to Equation (11), as  γ  increases, the speed at which  p i j  decreases gradually slows down, resulting in the same slowing down of  G i j .Therefore, with the increase in the total number of defense resources  γ , the expected loss of load G in the third stage of the game is gradually reduced, and the decrease in speed gradually reduces.
At the same time, according to Figure 4, given  N a N b  and  γ , with the increase in m, the expected loss of load G in the third stage of the game gradually increases. For example, given  N a = 2 N b = 2  and  γ = 4.5 , when m takes values of 3, 5, and 7, the corresponding G values are 246.021 MW, 433.578 MW, and 628.392 MW, respectively. According to Section 4.2, as m increases, the number of CEs under attack increases, and the number of elements with a value of 1 in the attack matrix  Z *  increases. According to Equation (33), if  α k Z * · P · ( X ( k ) + Y ( k ) ) m 1  remains unchanged or increases, and the expected loss of load G in the third stage of the game obtained by summing k increases.

5.3.2. The Influence of the Number of Main and Backup Communication Channels  N a  and  N b  on the Expected Loss of Load G

The total amount of fixed defense resources  γ  and the number of attacked CEs m were used to study the impact of the numbers of main and backup communication channels  N a  and  N b  on the expected loss of load G in the third stage of the game.
Table 5 shows the expected loss of load G values in the third stage of the game under different  N a  and  N b  conditions when  m = 4  and  γ = 4.5 . Compared to rows 2, 5, and 6 of Table 5, given  N b = 2 , the larger the value of the number of main communication channels  N b , the smaller the value of G. Compared to rows 2, 3, and 4 of Table 5, given  N a = 2 , the larger the value of the number of backup communication channels  N b , the smaller the value of G. The reasons for the analysis are as follows:
According to Section 4.3, as  N a  increases, the third stage of the game will search for more possible main and backup communication channels. At this point, the total number U of main and backup communication channels  ( Φ X , Φ Y )  increases, and the solution space of Equation (29) is larger. It is possible to find a combination  Φ X * , Φ Y *  of main and backup communication channels that makes the G value smaller. Therefore, an increase in  N a  may lead to a decrease in the value of G. In an experiment, setting a larger  N a  will result in an equal or smaller G value compared to a smaller  N a . Similarly, setting a larger  N b  will result in a smaller G value. Therefore, as  N a  or  N b  increases, the expected loss of load G in the third stage of the game decreases.

5.4. Comparative Research on Defense Resource Allocation Algorithms and Attack Strategies

The algorithm for allocating defense resources in the first stage of the game in this article is called the optimal allocation algorithm, and the attack strategy selected in the second stage is called the optimal attack strategy. The following section describes the study and analysis of the impact of optimal allocation algorithms and optimal attack strategies on the results of the game process. For convenience of description, the game scheme using the optimal allocation algorithm and optimal attack strategy is marked as Scheme A.

5.4.1. Research on the Optimal Allocation Algorithm in the First Stage of Game Theory

When allocating defense resources in the first stage of the game, the total amount of defense resources  γ  is divided equally according to the number of CEs M, and the divided defense resources are allocated to each CE through a process called the average allocation algorithm. The game scheme that uses the average allocation algorithm and the optimal attack strategy is Scheme B. Figure 5a shows the trend for the expected loss of load G in the third stage of the game with the total amount of defense resources when Scheme A and Scheme B are used, where  m = 5  and  N a = N b = 2 .
From the figure, it can be seen that under Scheme A and Scheme B, as the total amount of defense resources  γ  increases, the expected loss of load G of the power grid shows a downward trend, and its rate of decline tends to stabilize. When Scheme A is adopted, defense resources are evenly allocated to all CEs, and CEs with larger and smaller associated loads  I i j  are allocated the same number of resources, resulting in the same probability of failure under attack. When Scheme B is adopted, CEs with a larger associated load  I i j  are allocated a greater number of defense resources, resulting in a lower probability of failure. CEs with a smaller associated load  I i j  are allocated fewer resources, resulting in a higher probability of failure during attacks. Therefore, according to Equation (33), when the optimal attack strategy is adopted in the second stage, Scheme A has a small expected loss of load, and the optimal allocation algorithm can effectively reduce the expected loss of load.

5.4.2. Research and Analysis of the Optimal Attack Strategy in the Second Stage of Game Theory

To analyze the impact of the optimal attack strategy on the outcome of the game process, a random attack strategy was used for comparison. The random attack strategy randomly selects m CEs from all CEs in the communication network for attack. The scheme that uses the optimal allocation algorithm and random attack strategy is Scheme C. By comparing the game process results using Scheme A and Scheme C, we analyzed the impact of the optimal attack strategy on the game process results.
Given  γ = 4.5  and  N a = N b = 2 , the attack strategy was changed to select the number of CE attacks m, and the impacts of different attack strategies in the second stage of the game on the expected loss of load G in the third stage were studied. Figure 5b shows the trend for the mean expected loss of load G in the third stage of the game with a change in m when Scheme A and Scheme C are used. Each mean is the average of 200 Monte Carlo experiments.
From Figure 5b, it can be seen that as the number of attacked CEs increases, the expected loss of load G in the third stage of the game between Scheme A and Scheme C shows an increasing trend, and the trend is approximately linear, but the G value of Scheme A is always greater than that of Scheme C. This is because the optimal attack strategy will search for important CEs in the communication network to attack, thus obtaining the maximum attack benefit, i.e., the maximum expected loss of load G. Therefore, adopting the optimal attack strategy can be used to study the defense strategies of the power grid when important CEs in the power communication network are attacked to varying degrees.

6. Conclusions

In response to the situation of CE failures caused by maintenance and natural factors in the CPPS, this paper established a dual-network coupling CPPS model, defined the communication-side-associated load based on load shedding and the expected load loss from the power grid, and established the correlation relationship between the communication network and the power grid. On this basis, the game theory method was applied to analyze the actual power system regulation process, and a three-stage zero-sum game mechanism with complete information considering CE faults was proposed. The regulation process of the CPPS during a CE attack was simulated, and the optimal strategies for both the attack and defense sides were studied. When a CE is attacked or repaired, the expected load loss from the power grid is reduced and the stability of the CPPS improves. Specifically, in a single game model simulation, the expected loss of load from the power grid decreased by 41.972% when using some of the actual power communication networks in Shandong Province as the topology. In multiple Monte Carlo experiments, when five CEs were attacked and the total defense resource value was 4.5, compared to the situation without defense resources, the expected loss of load from the power grid decreased by 42.451%. When adjusting the possible main communication channels in the third stage of the game from 2 to 4, the expected load loss of the power grid also decreased by 21.493%.
With the continuous acceleration of the construction speed of the power communication network, the number and types of communication equipment have increased, and the network structure has become increasingly complex, continuously increasing the pressure on communication maintenance to strengthen security risk prevention and control. The game strategy studied in this article can provide a theoretical and experimental basis for the risk assessment of communication maintenance, enabling power communication maintenance to ensure the safe and effective operation of power communication networks and various LCSs. It can improve the security and stability of power systems with an increasing number of IoT devices.

Author Contributions

Methodology, G.Z.; Software, Q.Y.; Investigation, S.X.; Resources, P.M.; Data curation, S.Q.; Visualization, Y.Z.; Supervision, G.H. All authors have read and agreed to the published version of the manuscript.

Funding

The work was supported by the Science and Technology project of State Grid Corporation of China (Research on Dispatching Fusion Communication Oriented to Power Communication Network and Its Cooperative Control with Power Network Operation, 52060022001B).

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Yohanandhan, R.V.; Elavarasan, R.M.; Manoharan, P.; Mihet-Popa, L. Cyber-Physical Power System (CPPS): A Review on Modeling, Simulation, and Analysis With Cyber Security Applications. IEEE Access 2020, 8, 151019–151064. [Google Scholar] [CrossRef]
  2. Guo, J.; Wang, Y.; Guo, C.; Dong, S.; Wen, B. Cyber-Physical Power System (CPPS) reliability assessment considering cyber attacks against monitoring functions. In Proceedings of the 2016 IEEE Power and Energy Society General Meeting (PESGM), Boston, MA, USA, 17–21 July 2016; pp. 1–5. [Google Scholar]
  3. Zhang, D.; Li, X.; Zhou, L.; Li, H.; Shi, H.; Gao, F. The Control Strategy for Power CPS Microgrid under Network Attack. In Proceedings of the 2022 4th Asia Energy and Electrical Engineering Symposium (AEEES), Chengdu, China, 25–28 March 2022; pp. 161–165. [Google Scholar]
  4. Xin, S.; Guo, Q.; Sun, H.; Zhang, B.; Wang, J.; Chen, C. Cyber-Physical Modeling and Cyber-Contingency Assessment of Hierarchical Control Systems. IEEE Trans. Smart Grid 2015, 6, 2375–2385. [Google Scholar] [CrossRef]
  5. Cordova-Garcia, J.; Wang, X.; Xie, D.; Zhao, Y.; Zuo, L. Control of Communications-Dependent Cascading Failures in Power Grids. IEEE Trans. Smart Grid 2019, 10, 5021–5031. [Google Scholar] [CrossRef]
  6. Wang, Z.; Chen, G.; Liu, L.; Hill, D.J. Cascading risk assessment in power-communication interdependent networks. Phys. A Stat. Mech. Its Appl. 2020, 540, 120496. [Google Scholar] [CrossRef]
  7. Zhao, Z.; Zhou, T.; Wang, Q.; Gao, W.; Zhou, Z. Research on Modeling and Simulation of CPPS and Its Cascading Failure Mechanism. In Proceedings of the 2021 IEEE 12th International Conference on Software Engineering and Service Science (ICSESS), Beijing, China, 20–22 August 2021; pp. 42–47. [Google Scholar]
  8. Yu, C.; Zhang, L.; Sun, S.; Sun, Y.; Yin, X.; Wang, C. Cascading Failure Propagation in Cyber Physical Power Systems under Extreme Weather Events. In Proceedings of the 2022 4th International Conference on Smart Power & Internet Energy Systems (SPIES), Beijing, China, 9–12 December 2022; pp. 1486–1490. [Google Scholar]
  9. Nazari, M.H.; Wang, L.Y.; Grijalva, S.; Egerstedt, M. Communication-Failure-Resilient Distributed Frequency Control in Smart Grids: Part I: Architecture and Distributed Algorithms. IEEE Trans. Power Syst. 2020, 35, 1317–1326. [Google Scholar] [CrossRef]
  10. Zhou, X.; Ning, L.; Wang, B.; Yang, C.; Sun, H.; Liu, Y. An Industrial Park Load Shedding Scheme Based on Smart Contract. In Proceedings of the 2022 IEEE 6th Conference on Energy Internet and Energy System Integration (EI2), Chengdu, China, 11–13 November 2022; pp. 1811–1816. [Google Scholar]
  11. Zhu, X.; Li, Z.; Jia, Y.; Tang, X.; Dou, F.; Wang, Q. Study on Low Voltage Precise Load Shedding Measures in Receiving-side Power Grid Considering Source-Grid-Load Coordination. In Proceedings of the 2022 China International Conference on Electricity Distribution (CICED), Changsha, China, 7–8 September 2022; pp. 1613–1618. [Google Scholar]
  12. Lv, J.; Liu, Y.; Gao, K.; Wang, J.; Guo, X.; Yu, X.; Zhao, Y.; Zhang, J. Service Awareness Recovery under N-1 Failure in Power Grid Optical Communication Networks. In Proceedings of the 2021 IEEE 4th International Conference on Automation, Electronics and Electrical Engineering (AUTEEE), Shenyang, China, 19–21 November 2021; pp. 303–306. [Google Scholar]
  13. Guo, Y.; Xu, M. Research on reliability evaluation model and path optimization for power communication network. In Proceedings of the 2015 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), Changsha, China, 26–29 November 2015; pp. 2495–2500. [Google Scholar]
  14. Sun, W.; Zhu, Y.; Li, L.; Qian, Y. On Route Design with Ant Colony Optimization Algorithm for Power Line Communication Network. In Proceedings of the 2020 IEEE International Conference on Advances in Electrical Engineering and Computer Applications (AEECA), Dalian, China, 25–27 August 2020; pp. 799–802. [Google Scholar]
  15. Arbab-Zavar, B.; Sharkh, S.M.; Palacios-Garcia, E.J.; Vasquez, J.C.; Guerrero, J.M. Reducing Detrimental Communication Failure Impacts in Microgrids by Using Deep Learning Techniques. Sensors 2022, 22, 6006. [Google Scholar] [CrossRef] [PubMed]
  16. Dagle, J. Data management issues associated with the August 14, 2003 blackout investigation. In Proceedings of the IEEE Power Engineering Society General Meeting, Denver, CO, USA, 6–10 June 2004; Volume 2, pp. 1680–1684. [Google Scholar]
  17. Shi, Z.; Zeng, Y.; Sun, L.q. Operation and maintenance analysis for power communication networks based on big data. In Proceedings of the 2016 China International Conference on Electricity Distribution (CICED), Xi’an, China, 10–13 August 2016; pp. 1–4. [Google Scholar]
  18. Zhu, L.; Xu, M.; Zhou, A.; Qiao, J. Metadata modeling and management for power communication network operation and maintenance. In Proceedings of the 2022 IEEE 10th Joint International Information Technology and Artificial Intelligence Conference (ITAIC), Chongqing, China, 17–19 June 2022; Volume 10, pp. 1947–1951. [Google Scholar]
  19. Lovrenčić, V.; Ribič, P.; Ogrizek, P.; Lušin, M.; Lovrenčič, A. Safe Work in The Vicinity of Live Parts on High Voltage Double-Circuit Overhead Lines. In Proceedings of the 2022 13th International Conference on Live Maintenance (ICOLIM), Turin, Italy, 15–17 June 2022; pp. 1–6. [Google Scholar]
  20. Xiao, B.; Liu, K.; Wu, T.; Liu, T.; Peng, Y.; Lei, X.; Su, Z.; Tang, P. Experimental research on minimum approach distances and complex gaps for live working in substation. In Proceedings of the 2015 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), Changsha, China, 26–29 November 2015; pp. 1595–1599. [Google Scholar]
  21. Dong, W.; Liu, X.; He, X. Evaluation index system of electric power SD-OTN service riskfactors. In Proceedings of the 2017 16th International Conference on Optical Communications and Networks (ICOCN), Wuzhen, China, 7–10 August 2017; pp. 1–3. [Google Scholar]
  22. Ma, L.; Li, D.; Nan, D.; He, L. Troubleshooting and Maintenance of SDH Optical Transmission System. In Proceedings of the 2022 IEEE 6th Information Technology and Mechatronics Engineering Conference (ITOEC), Chongqing, China, 4–6 March 2022; Volume 6, pp. 1629–1632. [Google Scholar]
  23. Yuan, H.; Zhu, G.; Xu, J.; Dong, L.; Dai, D.; Zheng, L. Research on power system line vulnerability analysis and quantitative assessment under blind attack. In Proceedings of the 2021 13th International Conference on Measuring Technology and Mechatronics Automation (ICMTMA), Beihai, China, 16–17 January 2021; pp. 244–250. [Google Scholar]
  24. Fragkos, G.; Johnson, J.; Tsiropoulou, E.E. Centralized and Decentralized Distributed Energy Resource Access Control Implementation Considerations. Energies 2022, 15, 6375. [Google Scholar] [CrossRef]
  25. Mondal, A.; Misra, S. Game-theoretic green electric vehicle energy networks management in smart grid. In Proceedings of the 2015 IEEE International Conference on Advanced Networks and Telecommuncations Systems (ANTS), Kolkata, India, 15–18 December 2015; pp. 1–6. [Google Scholar]
  26. Yang, Y.; Liu, W.; Zhou, J.; Zhou, J.; Zhang, J. Non-cooperative-game-based Multi-agent Collaborative Planning Method for Distributed Generations. In Proceedings of the 2020 IEEE 4th Conference on Energy Internet and Energy System Integration (EI2), Wuhan, China, 30 October–1 November 2020; pp. 273–278. [Google Scholar]
  27. Que, L.; Jiang, X.; Wang, B.; Jin, X.; Cai, Z.; Shi, L.; Lyn, Q. Virtual Power Plant Adjustable Resource Aggregation Adjustment Optimization Strategy Based on Multi-agent Game. In Proceedings of the 2021 International Conference on Networking, Communications and Information Technology (NetCIT), Manchester, UK, 26–27 December 2021; pp. 285–290. [Google Scholar]
Figure 1. Schematic diagram of the coupling model between the CPPS communication network and the power network.
Figure 1. Schematic diagram of the coupling model between the CPPS communication network and the power network.
Electronics 12 03191 g001
Figure 2. Game flow chart of three stages of the game.
Figure 2. Game flow chart of three stages of the game.
Electronics 12 03191 g002
Figure 3. Topology of power communication networks in part of Shandong Province.
Figure 3. Topology of power communication networks in part of Shandong Province.
Electronics 12 03191 g003
Figure 4. The Influence of total defense resources  γ  on the expected loss of load G from the power grid when  N a = 2 , N b = 2 .
Figure 4. The Influence of total defense resources  γ  on the expected loss of load G from the power grid when  N a = 2 , N b = 2 .
Electronics 12 03191 g004
Figure 5. Comparison of different schemes. (a) The influence of the total defense resources on the expected loss of load G from the power grid under different schemes. (b) The influence of the number of attacked CEs on the expected loss of load G from power networks under different schemes.
Figure 5. Comparison of different schemes. (a) The influence of the total defense resources on the expected loss of load G from the power grid under different schemes. (b) The influence of the number of attacked CEs on the expected loss of load G from power networks under different schemes.
Electronics 12 03191 g005
Table 1. Key symbol.
Table 1. Key symbol.
SymbolMeaning of the SymbolUnit of the SymbolSymbolMeaning of the SymbolUnit of the Symbol
Ω Number set of CN/ Λ Number set of LCS/
Ω D Number set of DN/ s ( k ) The source node of LCS/
Ω B Number set of BN/ d ( k ) The destination node of LCS/
Ω A Number set of AN/ α ( k ) Load shedding corresponding to LCSMW
Ω R Number set of RN/ b k Bandwidth occupied by LCSMbps
EDirected CE set/ B ( 0 ) Initial bandwidth occupancy matrix/
D i j Transmission delay of CEm/s X k Main communication channel matrix/
R i j Reliability factor of CE/ Y k Backup communication channel matrix/
L i j Length of CEm I i j Associated load of CEMW
W i j Cost factor of CE/ p i j Probability of CE failure under attack/
W ( 0 ) Inherent cost factor matrix of the communication network/ G i j Expected load loss of CEMW
Table 2. Parameters of grid load control services.
Table 2. Parameters of grid load control services.
kControl Center
Node Number
RTU Device
Node Number
Value of Load
Shedding/MW
114131.129
219460.840
319343.804
414443.541
5193077.171
6192661.249
7141176.757
Table 3. Initial communication channel planning results for the power grid load control services.
Table 3. Initial communication channel planning results for the power grid load control services.
kCE of the Initial Main
Communication Channel
CE of the Initial Backup
Communication Channel
1(14,7) (7,6) (6,4) (4,1)(14,17) (17,16) (16,8) (8,3) (3,2) (2,1)
2(19,14) (14,7) (7,6) (6,4)(19,18) (18,3) (3,2) (2,1) (1,4)
3(19,18) (18,3)(19,20) (20,17) (17,16) (16,8) (8,3)
4(14,7) (7,6) (6,4)(14,15) (15,13) (13,9) (9,7) (7,5) (5,4)
5(19,29) (29,30)(19,20) (20,27) (27,30)
6(19,20) (20,17) (17,16) (16,8) (8,21) (21,26)(19,18) (18,25) (25,26)
7(14,15) (15,13) (13,12) (12,11)(14,7) (7,9) (9,10) (10,11)
Table 4. Communication channel optimization results.
Table 4. Communication channel optimization results.
kCE of the Optimized Main
Communication Channel
CE of the Optimized Backup
Communication Channel
1(14,7) (7,6) (6,4) (4,1)(14,16) (16,8) (8,3) (3,2) (2,1)
2(19,14) (14,7) (7,5) (5,4)(19,20) (20,17) (17,16) (16,8) (8,3) (3,2) (2,1) (1,4)
3(19,20) (20,17) (17,16) (16,8) (8,3)(19,14) (14,7) (7,5) (5,2) (2,3)
4(14,7) (7,6) (6,4)(14,15) (15,13) (13,9) (9,7) (7,5) (5,4)
5(19,29) (29,30)(19,20) (20,27) (27,30)
6(19,20) (20,17) (17,16) (16,8) (8,21) (21,26)(19,18) (18,25) (25,26)
7(14,15) (15,13) (13,12) (12,11)(14,7) (7,9) (9,10) (10,11)
Table 5. The expected loss of load G in the third stage of the game under different  N a  and  N b  values.
Table 5. The expected loss of load G in the third stage of the game under different  N a  and  N b  values.
Number of Main
Communication
Channels  N a
Number of Backup
Communication
Channels  N b
Expected Loss of G
Load in the Third
Stage of the Game
22323.92
23299.92
24283.33
32273.70
42254.30
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Zhu, G.; Yu, Q.; Xiao, S.; Qian, S.; Han, G.; Zhang, Y.; Ma, P. Defense and Attack Game Strategies of Dual-Network Coupled CPPS with Communication Edge Failures. Electronics 2023, 12, 3191. https://doi.org/10.3390/electronics12143191

AMA Style

Zhu G, Yu Q, Xiao S, Qian S, Han G, Zhang Y, Ma P. Defense and Attack Game Strategies of Dual-Network Coupled CPPS with Communication Edge Failures. Electronics. 2023; 12(14):3191. https://doi.org/10.3390/electronics12143191

Chicago/Turabian Style

Zhu, Guopeng, Qiusheng Yu, Shenyang Xiao, Shaobo Qian, Guangming Han, Yan Zhang, and Piming Ma. 2023. "Defense and Attack Game Strategies of Dual-Network Coupled CPPS with Communication Edge Failures" Electronics 12, no. 14: 3191. https://doi.org/10.3390/electronics12143191

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.