Next Article in Journal
Experimental Study on the Mechanical Behaviors of Loess Reinforced with Randomly Distributed Basalt Fiber
Next Article in Special Issue
Metaheuristic Method for a Wind-Integrated Distribution Network to Support Voltage Stabilisation Employing Electric Vehicle Loads
Previous Article in Journal
Correction: Ananyev et al. Selection of Fuel Isotope Composition in Heating Injectors of the FNS-ST Compact Fusion Neutron Source. Appl. Sci. 2021, 11, 7565
Previous Article in Special Issue
Design of Novel HG-SIQBC-Fed Multilevel Inverter for Standalone Microgrid Applications
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Energy Bidding Quadratic Model and the Use of the B-Loss Matrix for Determining Consumer Energy Price

by
Jangkung Raharjo
1,* and
Hermagasantos Zein
2
1
School of Electrical Engineering, Telkom University, Bandung 40257, Indonesia
2
Energy Conversion Engineering Department, State of Polytechnic of Bandung, Bandung 40559, Indonesia
*
Author to whom correspondence should be addressed.
Appl. Sci. 2022, 12(19), 9743; https://doi.org/10.3390/app12199743
Submission received: 4 September 2022 / Revised: 22 September 2022 / Accepted: 25 September 2022 / Published: 28 September 2022

Abstract

:
The liberalization trend has led to electric restructuring in market industries. At the start of the 1990s, it was recommended to shift the electricity business from a monopoly to a competitive system. The electric power problem becomes more complex from competition because competitors must be ready to win or lose. The method that has succeeded in determining energy prices in competition is the locational marginal price method implemented by the New York Service Operator. In general, the characteristic of the supplier offers are in step function forms, so optimizing prices and allocating transmission losses are a problem. This paper proposes a method for determining electrical energy prices on the consumer side in each location. The method uses a quadratic approach to perform direct method optimization. The transmission losses are calculated through the B-loss matrix approach, and then allocations of the transmission losses are separated with the proportional method. Simulation results for three locations with six suppliers, as well as on a larger scale (118 buses, 54 generators) were obtained.

1. Introduction

The energy crisis is a serious phenomenon that is of concern now and in the future. Various efforts continue to be taken to improve the efficiency of power generation. This efficiency problem has experienced its highest peak since the application of a generator with a combination cycle with a high level of efficiency. However, the threat of lack of energy continues until this day, caused by the reduced fossil reserves, while the demand growth rises sharply. As a result, the energy price of fossils in the future will be tough to estimate, although renewable energy sources have been developed in the last two decades. In the early 1990s, experts focused on energy savings, operational efficiency, and transparency. The results are a message for changing the electricity business to a market system as a competition system [1].
In an effort to achieve prosperity for electricity users, competition efforts to create healthy electricity trading conditions have been carried out [2], and one of the indicators of success in the competition is shown by the optimal selling price for consumers. However, to achieve competitive selling prices, power plants must undertake various strategies to further improve their production efficiency [3]. An important thing that also plays a role in influencing electricity costs is the transmission network that delivers the electricity to the customer. Compared to an integrated system, the roles of the network in a competition system will be complex because it is open to all market participants [4]. In 1990, the UK restructured the power supply industry. As an implication of the restructuring, several private companies are competing to contribute significantly to the electricity supply for the next period. Therefore, a new term Main Electricity Producers (MPPs) is introduced for designated companies whose main purpose is to generate electricity [5].
The success of electricity trading is shown by the following facts, such as Pennsylvania-New Jersey-Maryland (PJM) [6], Competition in New York: NYISO [7], in New England: ISO-NE [8], in California: CAISO [9], in Texas: ERCOT [10], Midcontinent Independent System Operator [11], and Neidhardt Engineering and Manufacturing. The success of those markets is due to the implementation of locational marginal price (LMP), while other markets are heading toward LMP. LMP is the essential key in evaluating the electric energy market, and GENCO has a large share in the power market [12]. The LMP mechanism was first discovered by [13] and was introduced in PJM-ISO. However, the basis of the LMP mechanism is the determination theory of spot pricing proposed by [14]. The hallmark of the LMP mechanism is that all scheduling generators from suppliers (competition participants and bilateral transactions) are carried out centrally. It is essential to meet the conditions of the system and the constraints caused by it. Ning Zhang proposed an econometric and statistical model to analyze the behavior of generator supply in the NYISO wholesale electricity market one day ahead [15]. If an effective policy can be implemented by NYISO to move generators from a high price bracket to a cheaper price bracket, the effect is likely to be long-lasting. Therefore, in the long term, the market price can be lowered [15].
A rule-based bidding strategy to address various challenges and represent individual market participants has been presented in the form of an agent-based market simulation model [16]. Meanwhile, after comparing power and revenue in different weathers, different markets, and different bidding strategies shown in [17] their proposes a bidding strategy to optimize the bidding behavior of traditional coal-fired units and provides a reference for the bidding strategy of thermal power units when the unified market and renewable energy is connected to the grid in the future. The economic modeling and operation of energy hubs considering the energy market demand and prices have been studied [18] and the most profitable strategies from the electricity operator’s perspective in the energy grid have been discussed in depth. On the other hand, related to these conditions, plants that are at high risk of uncertainty in energy output, such as photovoltaic and wind turbines using energy storage, must observe this condition very carefully [19].
In research conducted by [20], there is a minimum income arrangement from power plants using swap techniques related to the production costs of each generating unit, where if more such offers are present in the market, their interactions could open the possibility of strategic bidding. An alternative to conventional multi-unit pay-as-clear type auctions commonly used for electric power exchange clearing was proposed by [21], and some of its characteristic features were analyzed and compared with conventional clearing. Xiang Gao et al. propose a model offering for an integrated PV power generation battery energy storage system (BESS) in the pool-based power market, where the uncertainty of PV generation output is considered [22]. This model considers the market clearing process as an external environment, and through communication with the environmental market, each agent updates the bid price to maximize its income. In the multi-zone integrated energy reserves market model, bidders may submit bids in the form of hourly incremental bids and block bids, which are settled and paid at market-clearing prices (MCP) [23].
The restructuring of the electric power industry aims to eliminate monopolies in the generation and trade sectors, thereby introducing competition at various levels as much as possible [24]. Concepts of the power market have been clearly described by [25,26,27]. The concept of deregulation and structuring in the power industry is a core of market success. The industry concept in the competitive electricity market has been clearly explained by [28]. A major concern with restructuring the electricity market is the possibility that fuel price volatility could leak into electricity prices [29]. Market power detection techniques were successfully studied by [25]. Factors that give rise to market forces supporting effects that affect consumers and producers must be based on a theoretical and quantitative basis [26]. A study on California’s electricity markets breaks market power problems through arbitrage [27].
The definition of pricing was comprehensively studied by [30], especially regarding fuel cost. Implementation of the pricing with the Locational Marginal Pricing (LMP) concept has been formulated by [31,32,33,34,35]. An overview of LMP for the deregulation industry was described in [31]. The study in [32] presented a new market indicated by the market power index based on transmission security constraints. In [33], the main challenge in forecasting LMP is estimating prices accurately in the market day ahead. Mohammad Amin Mirzaei studied a model that integrates the energy market clearing process with the rail route problem [34], in which the space-time network is used to describe the limitations of the rail transport network (RTN). This model is used to determine optimal hourly locations, schedule battery-based energy storage transport system (BEST) charge/discharge, unit thermal power delivery, flexible load scheduling, and find LMP without ignoring the thermal unit daily carbon emission limit. Efforts have been made to determine LMP through the Direct Current-Optimal Power Flow (DC-OPF) model approach by considering losses [35]. In contrast, the determination of the LMP can be used to consider the optimal location of the generator based on the LMP [36].
Practically, the difference in LMP values between locations is due to the consideration of voltage drop, line capacity, losses, etc. The electric energy price is charged to consume not only the LMP but also the cost of transmission losses (TL). This paper proposes calculating energy prices on the consumer side in each location, which is reasonable and fair. The methodology used is a quadratic function approach from the price offered by the supplier so that optimization can be carried out directly [37]. Thus, the determination of the winner of the competition can be decided appropriately. In contrast, the TL is calculated separately through the B-loss matrix approach. Then, allocations of the TL to locations are estimated using the proportional method. In addition to applying several methods, this paper also contributes to formulating the concept of the locational consumer price (LCP) in a competition system. The formulations were tested with a three-location system and six suppliers in 24 auctions with satisfactory results.
In [38], problem-solving was described through distributed coordination, which was applied to a distributed generator to increase energy utilization between the network and the internet. In the power system, the locations formed are connected in an electrical circuit that cannot be separated from each other. Calculation of the optimal power flow and losses must be performed in an integrated manner. Therefore, the algorithm developed in this energy auction issue is through a centralized independent service operator (ISO). In this context, ISO informs the optimization results to stakeholders and to the location operators for follow-up.
For electricity participants, the formation of a bidding strategy in an open access environment is one of the important and most challenging tasks to maximize their profits [39]. This paper creates a framework for determining energy prices on the consumer side of each location through a market mechanism. ISO determines the winner based on offers from Generator Company (GENCO) and Distribution Company (DISCO) that meet transmission network constraints. A GENCO who wins is declared committed, and those who lose are declared uncommitted. ISO performs energy price optimization calculations, while at the same time ensuring committed and non-committed GENCOs to serve loads and losses in determining energy prices on the consumer side. This energy pricing process must be fast (less than five minutes) to have sufficient time to operate the power system, especially to run GENCO, which has been declared the winner, where the bidding process is generally one hour ahead. For the calculation process to run quickly, this paper proposes a direct method for optimization calculations. This method is a method without iteration, so the processing time is fast compared to the iteration method (indirect). The determination of transmission losses is carried out using the B-loss matrix approach. The simulation for the GENCO six system takes 0.04 s to process through Fortran language programming with an Asus Core i3 laptop. With a fast calculation process in determining electricity prices on the consumer side, this proposed model can be operated for large-scale systems, for example, a 118 Bus, 54 GENCO system with a CPU time of 0.37 s.
The layout of this paper comprises several sections. The Section 2 overviews the problem formulation, the Section 3 explains the methodology, and the Section 4 discusses the results. The Section 5 is the conclusion.

2. Problem Formulation

Fairness in energy prices is the key to a successful electricity market, especially from the consumer side. Therefore, the application of the LMP mechanism in the electric power system can lead to market success.
For energy prices that are fair to every consumer, this paper proposes a model for calculating energy prices from the consumer side called LCP. The methodology is based on the model through a mechanism in Figure 1. An ISO will optimize energy prices based on supply and demand. Transmission loss is calculated through the B-loss matrix approach, where LCP is calculated based on LMP and the price of losses.
From this explanation, consumers in each location will obtain energy prices based on the energy used and the resulting losses, which in this paper are defined as the energy price on the demand site as follows:
ρ L P = ρ E P + ρ T P
where ρ L P is the price of electrical energy for consumers in each location, namely, LCP. ρ E P is the price of energy based on LMP. In contrast, ρ T P is the price of transmission loss calculated based on the energy price of the system (marginal price system) and the allocation of transmission losses.

3. Methods

3.1. Energy Price Optimization

The ISO determines the energy price based on the optimization of the GENCO offers and the amount of power from the DISCO demand in a system based on the mechanism in Figure 1. Generally, the energy offer characteristics of GENCOs can vary, yet in this paper, the offer function in the form of a step function is considered, as shown in Figure 2. This function is a form of function that is not differentiable.
The step function in Figure 2 can be expressed by (2).
f ( P ) = { ρ 1 ,   P m i n P < P 1 ρ 2 ,     P 1 P < P 2 ρ 3 ,     P 2 P < P 3 ρ 4 ,     P 3 P < P 4 ρ 5 ,     P 4 P P m a x
where f(P) is a function of fuel price in the form of a step function and ρ1 is the price of fuel in the power range between P m i n and P 1 . P m i n is the minimum power limit, and P m a x is the maximum power limit.
Therefore, the optimization problem can be formulated with the objective function (F) and its constraints as follows:
  • Objective Function
    F = i = 1 n f i ( P i )
  • Equation Constraints
    P D = i = 1 n P i
    where PD is the demand load.
  • Inequality Constraints
    P m i n i P i P m a x i
As previously mentioned, the paper engaged the direct method suggested by [37]. This method is practical and superior in both speed and accuracy. However, the optimization problem must be in the form of a quadratic function. For this reason, a quadratic approach is used. The characteristics of the offer in Figure 2 can be approximated by a quadratic form, as presented in Figure 3. With this approach, the characteristics of the offers, in general, are shown in (6).
f ( P ) = a + b P + c P 2
where a, b, and c are parameters of the fuel cost function in the quadratic form.
The optimization problem is solved by the LaGrange function, which is:
= i = 1 n f i ( P i ) + λ ( i = 1 n P i P D )
where λ is the LaGrange multiplier. The partial derivative of (7) is
λ i = b + 2 c i P i
The optimal conditions must meet the following:
λ = λ 1 = λ 2 = = λ i
From (8) and (9), the generator power is obtained, namely
P i = λ b 2 c i
For n generators, the power obtained is
P d = i = 1 n P i = i = 1 n λ b 2 c i
From (11), the Lagrange multiplier factor can be calculated directly, namely:
λ = P D + i = 1 n b i 2 c i i = 1 n 1 2 c i
Furthermore, the value of Pi is directly obtained based on the derivative of Equation (6), namely:
P i = λ b i 2 a i
This settlement is still not final and needs to be checked with each GENCO limit with the following conditions:
P i = λ b i 2 a i
  • if P i > P m a x i , then P o p t i = P m a x i
  • if P m i n i P i P m a x i , then P o p t i = P i .
  • If P i < P m i n i , then P o p t i = 0 .
Note that Popti is the optimal power. If conditions a and b occur, then GENCO wins the competition. In contrast, condition c indicates that the competition is lost.
This direct method (DM) has been validated by several methods, namely, the genetic algorithm (GA), lambda iteration (LI), dynamic programming (DP), and large to small area technique (LSAT), for 15 generators. The direct method gives the best results, namely, the lowest cost (32,502.92), as shown in Table 1.
The computational time of the DM is much more competitive than that of the iteration method, as the computation time of the DM is 0.22 s and the computation time of the iteration method (e.g., LSAT) is greater than 20 s [40].

3.2. Determination of LMP and System Energy Price

The energy prices on GENCO buses are called nodal prices (NP). This is determined from the results of optimization, namely:
N P i = b i + 2 c i P o p t i
The LMP is defined based on the energy price caused by an increase in demand for one unit of energy and is formulated based on (11).
L M P = m a x { N P 1 , N P 2 , , N P m }
where m is the number of GENCOs at that location. Referring to the LMP definition, the energy price of the system is
ρ S P = m a x { N P 1 , N P 2 , , N P n }

3.3. Determination of Loss Price

Transmission loss is a problem that must be solved in the competition system because transmission losses are a natural property of nature and cannot be neglected. Even though the percentage is small (2–5%), in large electric power systems, it is quite large. For example, 3% of 2000 MW is 60 MW. The calculation of the real transmission losses must be performed by calculating the power flow or the measurement method. Both methods must be supported by complete data, and the calculation should be fast since the competition time is short (less than 5 min).
This paper calculates transmission losses through an approach using the B-loss matrix. After the generator quotas (as a winner) are obtained from the optimization process, the transmission loss can be calculated through Equation (18).
P l o s s = [ P o p t ] [ B ] [ P o p t ]
where B is the B-loss matrix. P o p t is the optimal power matrix. Meanwhile, the allocation of transmission losses for each location is approached by the proportional method expressed in Equation (19).
P L i = P L D i P D P l o s s
where P L D i is the number of loads in location i. From Equations (17) and (19), the same loss price is obtained at all locations, namely:
ρ T P = P l o s s P D ρ S P
where ρ T P is the energy price of transmission losses.

4. Simulation Results and Discussion

Figure 4 shows a power system used for the numerical simulation to evaluate the proposed method. This system consists of three separate locations. Location-1 contains three GENCOs ( G 1 ,   G 3 , and   G 2 ) with a total load of DISCOs of 480 MW. Location-2 contains three GENCOs ( G 4 ,   G 5 , and   G 6 ) with a total load of DISCOs of 430 MW.
Location-3 only consists of DISCOs with a total load of 300 MW. In contrast, losses will be supplied by a separated generator GL. Furthermore, Table 2 contains the offer data of GENCOs with four supply blocks (α, β, γ, and π). Table 3 assumes the demand for power every hour for 24 h, where the B-loss matrix is presented in (21). The calculation of B-loss matrix components in this paper is not the main discussion. The values of the B-loss matrix components are obtained from separate calculations in the paper.
B = 10 3 [ 1.7 1.2 0.7 0.1 0.5 0.2 1.2 1.4 0.9 0.1 0.6 0.1 0.7 0.9 3.1 0.0 0.1 0.6 0.1 0.1 0.0 0.24 0.6 0.8 0.5 0.6 0.1 0.6 12.9 0.2 0.2 0.1 0.6 0.8 0.2 15.0 ]
The results of optimization analysis at the 12th hour showed that the energy price of the system was $51/MWh. The analysis results are presented in Table 4, Table 5 and Table 6.
In this competition, G6 is declared losing, so the quota is zero. This is due to a very high offer, which is above $52/MWh (see Table 2).
For the competition at the 12th hour, Location-1 has a surplus of 495.6 MW, of which 180 MW are exported to Location-2, and the remaining is exported to Location-3. Therefore, the energy price in Location-3 is determined by the energy price from Location-1. At Location-2, although it imports power from Location-1, the energy price is determined by the LMP itself because the LMP of Location-2 is higher than the LMP of Location-1.
The analysis results for 24-h transactions are listed in Table 7.
In this simulation, Location-1 always has a surplus so that the excess power is exported to Location-2 and Location-3. This causes the LCP at Location-3 to be the same as the LCP at Location-1, whereas the LCP at Location-2 depends on the LMP itself. If the LMP at Location-2 is lower than the LMP at Location-1, then the LCP at Location-2 is the same as the LCP at Location-1, similar to hours 1–9 and hours 19–24. Beyond this hour, the LCP at Location 2 soared more than 4 times and reached a peak at $52.760/MWh. This was caused by the entry of G6 with a power quota of 92.2 MW, and the price fell to $52.1/MWh (see Table 2).
This method has been tested on a large-scale electrical system, namely 118 buses, 54 generators, based on IEEE 118 Bus data. The simulation results are compared with the calculation results from Newton’s Method Power Flow, which are presented in Table 8. Table 8 shows that the results of the proposed method are very close to the results of the Newton method. To supply a load of 4242 MW, the power generated by the proposed method and Newton’s method is 4377.59 and 4374.86 MW, respectively.
In other words, the losses generated by the proposed method and Newton’s method are 135.59 and 132.86 MW, respectively. Meanwhile, the cost of generating power with the proposed method and Newton’s method is $62,556.216 and $62,492.967, respectively. The results of the proposed method have a deviation of 0.0624% for power generation, 2.0548% for losses, and 0.1012% for generation costs from the results of Newton’s method.
The large-scale electrical system (IEEE 118 Bus, 54 generators) is divided into five locations, as shown in Table 9. The results of the calculation of energy prices for each location are listed in Table 10. The simulation of this system shows the optimal energy price in each location. The price is determined by the maximum value of all optimized generators at each location (maximum LMP) and their losses. This means that the energy price at each location will be different, as shown in Table 10. This large-scale simulation requires a very short computation time of 1.28 s.
To realize the energy price at each location in the competition system, for the proposed method, it is fast and guarantees convergence, whereas a new method based on iteration, especially the artificial intelligence method, requires a long computational time to be applied to a large-scale system. In addition, for artificial intelligence methods, such as particle swarm optimization (PSO), there is no guarantee that the solution will fall on the global minimum point, as the PSO is very dependent on the starting point.

5. Conclusions

The LMP calculation has an impact on the realignment of electric power that will be included in the competition mechanism, thus justice from losses can achieve the value of consumer satisfaction in the LCPs. The methods applied must accommodate the GENCO offers and the schedule (timeline) set by the ISO, which uses an auction mechanism one hour ahead. This paper has proposed a fair LCP calculation through the optimization methodology and transmission loss using the B-loss matrix approach. The characteristics of the GENCO offering in the form of step functions are approximated by quadratic functions so that optimization using the direct method can be applied. Transmission loss allocation is based on a proportional approach that is decent enough, where losses are supplied by separated special generators. The energy price of transmission losses is taken as the maximum value of the nodal price of the system. This method was tested through simulations by auctioning 24 times with an electric power system consisting of three locations and 6 GENCOs with satisfactory results. The LCP is very dominantly determined by the LMP rather than the transmission loss price, which is only less than 3%. Location-3 does not have GENCO, so the LCP is determined by the location of the power surplus, namely, Location-1. In Location-2, LCP increased sharply (more than four times) between hours 11–18 because very expensive offers of the GENCOs ( G 4   and   G 6 ) were operating and reached a peak of 52.760 $/MWh, which outside of these hours averaged 12.8 $/MWh. This analysis indicates a positive signal for investors to build cheaper power plants in Location-2 to compete with the participants of G 4   and   G 6 .

Author Contributions

Conceptualization, Problem Formulation, LCP, and LMP Analysis were done by J.R., and B-Loss Matrix was done by H.Z. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Directorate of Research and Community Service, Telkom University.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Not applicable.

Acknowledgments

This research was supported by Directorate of Research and Community Service, Telkom University and State of Polytechnic of Bandung.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Lo, K.L.; Yuen, Y.S. Deregulation of Electric Utilities. In Power System Restructuring and Deregulation; John Wiley & Sons Ltd. Wiley: Chichester, UK, 2001; pp. 50–74. [Google Scholar]
  2. Kopsakangas-Savolainen, M.; Svento, R. Real-Time Pricing; An Application to the Nordic Power Markets. In Modern Energy Markets, Green Energy and Technology; Springer: London, UK, 2012; pp. 29–44. [Google Scholar]
  3. Shayesteh, E.; Moghaddam, M.P.; Yousefi, A.; Haghifam, M.R.; Sheik-El-Eslami, M.K. A demand side approach for congestion management in competitive environment. Eur. Trans. Electr. Power 2010, 20, 470–490. [Google Scholar] [CrossRef]
  4. Christie, R.D.; Wollenberg, B.F.; Wangensteen, I. Transmission management in the deregulated environment. Proc. IEEE 2000, 88, 170–195. [Google Scholar] [CrossRef]
  5. Department for Business Energy & Industrial Strategy. Competition in UK Electricity Markets; Special Article-Energy Trends Collection 30 September 2021; Department for Business Energy & Industrial Strategy: London, UK, 2021.
  6. Lambert, J.D. Creating Competitive Power Markets: The PJM Model; PennWell: Washington, DC, USA, 2001. [Google Scholar]
  7. Tierney, S.F. The New York Independent System Operator: A Ten-Year Review; Analysis Group: Boston, MA, USA, 2010. [Google Scholar]
  8. Cheung, K.; Shamsollahi, P.; Sun, D.; Milligan, J.; Potishnak, M. Energy and Ancillary Service Dispatch for the Interim ISO New England Electricity Market. IEEE Trans. Power Syst. 2000, 15, 968–974. [Google Scholar] [CrossRef]
  9. Huang, J.; Yalla, P.; Yong, T. Greg Ford and Mark Rothleder, New real time market applications at the California independent system operator (CAISO). In Proceedings of the IEEE PES Power System Conference and Exposition, New York, NY, USA, 10–13 October 2004; pp. 1–6. [Google Scholar]
  10. Nimmagadda, S.; Islam, A.; Bayne, S.B.; Walker, R.P.; Caballero, L.G.; Camanes, A.F. A study of recent changes in Southwest Power Pool and Electric Reliability Council of Texas and its impact on the U.S wind industry. Renew. Sustain. Energy Rev. 2014, 36, 350–361. [Google Scholar] [CrossRef]
  11. Quint, D.; Dahlke, S. The impact of wind generation on wholesale electricity market prices in the midcontinent independent system operator energy market: An empirical investigation. Energy 2019, 169, 456–466. [Google Scholar] [CrossRef]
  12. Hajiabadi, M.E.; Samadi, M. Locational marginal price share: A new structural market power index. J. Mod. Power Syst. Clean Energy 2019, 7, 1709–1720. [Google Scholar] [CrossRef]
  13. Hogan, W.W. Independent System Operator (ISO) for a Competitive Electricity Market; Center for Business and Government, John F. Kennedy School of Government, Harvard University: Cambridge, MA, USA, 1998. [Google Scholar]
  14. Schweppe, F.C.; Caramanis, M.C.; Tabors, R.D.; Bohn, R.E. Spot Pricing of Electricity; Kluwer: Philadelphia, PA, USA, 1998. [Google Scholar]
  15. Zhang, N. Generator’s bidding behavior in the NYISO day-ahead wholesale electricity market. Energy Econ. 2009, 31, 897–913. [Google Scholar] [CrossRef]
  16. Qussous, R.; Harder, N.; Weidlich, A. Understanding Power Market Dynamics by Reflecting Market Interrelations and Flexibility-Oriented Bidding Strategis. Energies 2022, 15, 494. [Google Scholar] [CrossRef]
  17. Chen, Y.; Ye, L.; Zhou, Q.; Jiang, Y.; Qiang, W.; Zhang, Y. Bidding Strategis for Thermal Units Considering the Randomness of Renewable Energy Sources in A Unified Power market. In Proceedings of the 4th IEEE Conference on Energy Internet and Energy Integration, Wuhan, China, 30 October–1 November 2020. [Google Scholar]
  18. Kang, I.O.; You, H.; Choi, K.; Jeon, S.K.; Lee, J.; Lee, D. Modeling and Economic Operation of Energy Hub Considering Energy Market Price and Demand. Sustainability 2022, 14, 2004. [Google Scholar] [CrossRef]
  19. Tan, Z.; Tan, Q.; Wang, Y. Bidding Strategy of Virtual Plant with Energy Storage Power Station and Photovoltaic and Wind Power. J. Eng. 2018, 2018, 6139086. [Google Scholar] [CrossRef] [Green Version]
  20. Csercsik, D. Strategic bidding via interplay of minimum income condition orders in day-ahead power exchanges. Energy Econ. 2021, 95, 105126. [Google Scholar] [CrossRef]
  21. Csercsik, D. A Two-Sided Piece-Decoupled Pay=As-Bid Auction Approach for the Clearing of Day-Ahead Electricity Markets. In Proceedings of the 4th International Conference on Power, Energy and Mechanical Engineering (ICPEME 2020), Budapest, Hungary, 14–17 February 2020; Volume 162, p. 01006. [Google Scholar] [CrossRef]
  22. Gao, X.; Ma, H.; Chan, K.W.; Xia, S.; Zhu, Z. A Learning-Based Bidding Approach for PV-Attached BESS Power Plants. Front. Energy Res. 2021, 9, 750796. [Google Scholar] [CrossRef]
  23. Csercsik, D. Introduction of Flexible Production Bids and Combined Package-Price Bids in a Framework of Integrated Power-Reserve Market Coupling. Acta Polytech. Hung. 2020, 17, 131–153. [Google Scholar] [CrossRef]
  24. Tapre, P.C.; Singh, D.; Paraskar, S. Restructuring and deregulation of Power System—A Review. Int. J. Curr. Res. 2018, 10, 70474–70478. [Google Scholar]
  25. Lakić, E.; Medved, T.; Zupančič, J.; Gubina, A.F. The review of market power detection tools in organised electricity markets. In Proceedings of the 14th International Conference on the European Energy Market (EEM), Dresden, Germany, 17 July 2017; pp. 6–9. [Google Scholar]
  26. Ye, Y.; Papadaskalopoulos, D.; Strbac, G. Investigating the Ability of Demand Shifting to Mitigate Electricity Producers’ Market Power. IEEE Trans. Power Syst. 2017, 33, 3800–3811. [Google Scholar] [CrossRef]
  27. Borenstein, S.; Bushnell, J.; Knittel, C.R.; Wolfram, C. Inefficiencies and Market Power in Financial Arbitrage: A Study on California’s Electricity Markets. J. Ind. Econ. 2008, 56, 347–378. [Google Scholar] [CrossRef]
  28. Hirsh, R.F. Power Loss: The Origins of Deregulation and Restructuring in the America Electric Utility System; The MIT Press: Cambridge, MA, USA; London, UK, 2001. [Google Scholar]
  29. Ohler, A.; Mohammadi, H.; Loomis, D.G. Electricity restructuring and the relationship between fuel cost and electricity prices for industrial and residential customers. Energy Policy 2020, 142, 111559. [Google Scholar] [CrossRef]
  30. Gedra, T.W. On Transmission Congestion and Pricing. IEEE Trans. Power Syst. 1999, 14, 241–248. [Google Scholar] [CrossRef]
  31. Poushali, P. A review on Locational Marginal Price (LMP) for deregulated industry. J. Appl. Adv. Res. 2018, 3, 22–23. [Google Scholar]
  32. Lee, Y.Y.; Hur, J.; Baldick, R.; Pineda, S. New Indices of Market Power in Transmission-Constrained Electricity Markets. IEEE Trans. Power Syst. 2011, 26, 681–689. [Google Scholar] [CrossRef]
  33. Padmini, S.; Rajesh, V.S.; Chandrakanth, N.; Rajesh, V. Locational Marginal Pricing of GENCOs in a Deregulated Energy Market. Indian J. Sci. Technol. 2016, 9, 1–5. [Google Scholar] [CrossRef] [Green Version]
  34. Mirzaei, M.A.; Hemmati, M.; Zare, K.; Mohammadi-Ivatloo, B.; Abapour, M.; Marzband, M.; Farzamnia, A. Two-Stage-Stochastic Electricity Market Clearing Considering Mobile Energy Storage in Rail Transportation. IEEE Access 2020, 8, 121780–121794. [Google Scholar] [CrossRef]
  35. Abirami, A.; Manikandan, T.R. Locational Marginal Pricing Approach for A Deregulated Electricity Market. Int. Res. J. Eng. Technol. (IRJET) 2015, 2, 349–354. [Google Scholar]
  36. Zein, H.; Sabri, Y.; Dermawan, E. Determining LBMP through Optimal Power Flow in the Electric Power Business. Telkomnika Indones. J. Electr. Eng. 2014, 12, 5086–5095. [Google Scholar] [CrossRef]
  37. Zein, H.; Sabri, Y.; Mashar, A. Implementation of Electricity Competition Framework with Economic Dispatch Direct Method. Telkomnika Indones. J. Electr. Eng. 2012, 10, 625–632. [Google Scholar]
  38. Sun, Q.; Han, R.; Zhang, H.; Zhou, J.; Guerrero, J.M. A Multiagent-Based Consensus Algorithm for Distributed Coordinated Control of Distributed Generators in the Energy Internet. IEEE Trans. Smart Grid 2015, 6, 3006–3019. [Google Scholar] [CrossRef]
  39. Prabavathi, M.; Gnanadass, R. Electric power bidding model for practical utility system. Alex. Eng. J. 2018, 57, 277–286. [Google Scholar] [CrossRef]
  40. Raharjo, J.; Zein, H.; Adam, K.B. Optimal Economic Load Dispatch with Prohibited Operating Zones Using Large to Small Area Technique. Int. J. Energy Convers. (IRECON) 2021, 9, 29–34. [Google Scholar] [CrossRef]
Figure 1. LCP Mechanism.
Figure 1. LCP Mechanism.
Applsci 12 09743 g001
Figure 2. Characteristics of the offer function.
Figure 2. Characteristics of the offer function.
Applsci 12 09743 g002
Figure 3. Quadratic Approach.
Figure 3. Quadratic Approach.
Applsci 12 09743 g003
Figure 4. The system consisting of three locations.
Figure 4. The system consisting of three locations.
Applsci 12 09743 g004
Table 1. Comparison of optimization result.
Table 1. Comparison of optimization result.
Output Power (MW)
Gen.GALIDPLSATDM (Proposed Method)
1452.40455.00455.00455.00455.00
2455.00455.00455.00453.00455.00
3130.96130.00130.00130.00130.00
4129.10130.00130.00129.60130.00
5337.10295.30260.00259.70295.30
6428.50460.00460.00460.00460.00
7466.40465.00465.00463.60465.00
860.0060.0060.0060.0060.00
927.6025.0025.0025.0025.00
1027.1020.0020.0021.9020.00
1125.7043.4060.0059.0043.37
1254.0056.3075.0078.2056.33
1325.0025.0025.0025.0025.00
1415.0015.0015.0015.0015.00
1515.0015.0015.0015.0015.00
Total Power2648.862650.002650.002650.002650.00
Cost32,51732,50332,50632,50732,502.92
Table 2. Genco offers.
Table 2. Genco offers.
Genco α β γ π
Power Level
(MW)
Energy Price
($)
Power Level
(MW)
Energy Price
($)
Power Level
(MW)
Energy Price
($)
Power Level
(MW)
Energy Price
($)
G 1 100–2258225–3509350–4509.8450–50010.7
G 2 50–90690–1358.2135–17511.9175–20014.2
G 3 80–15011.2150–21511.7215–26012.5260–30012.7
G 4 50–8048.580–11049.6110–13551135–15051.5
G 5 50–9011.190–13511.4135–17511.7175–20012
G 6 80–15052.1150–21552.2215–26052.5260–30053
Table 3. 24 h Power on Demand Throughput.
Table 3. 24 h Power on Demand Throughput.
HourDemand Load (MW)HourDemand Load (MW)HourDemand Load (MW)HourDemand Load (MW)
19557989131220191159
294281023141311201092
393591126151320211023
493010118016135022984
593511119817132123975
696512121018126224960
Table 4. Result of Quota Analysis of Genco Losses and Nodal Price.
Table 4. Result of Quota Analysis of Genco Losses and Nodal Price.
# G 1
(MW)
G 2
(MW)
G 3
(MW)
G 4
(MW)
G 5
(MW)
G 6
(MW)
P l o s s
(MW)
P468.3198.7293.050.0200.00.015.6
NP10.714.212.751.512--
Table 5. Analysis Result of LMP, Losses, and Customer Price.
Table 5. Analysis Result of LMP, Losses, and Customer Price.
ItemLocation-1Location-2Location-3
LMPmax ($/MWh)14.248.514.2
Loss (MW)6.355.693.97
LCP ($/MWh)14.88149.18114.881
Table 6. Power Balance.
Table 6. Power Balance.
LocationTotal Generating Power (MW)Load (MW)Power Balance (MW)
Location-1960480+495.6
Location-2250430−180
Location-30300−300
Losses15.615.60
Table 7. LCP Analysis Results at 3 Location.
Table 7. LCP Analysis Results at 3 Location.
HourLocation-1 ($/MWh)Location-2 ($/MWh)Location-3 ($/MWh)
112.86512.86512.865
212.66112.66112.661
312.65912.65912.659
412.65912.65912.659
512.65912.65912.659
612.86612.86612.866
712.87512.87512.875
812.86912.86912.869
912.86512.86512.865
1014.36712.86712.867
1114.83649.13614.836
1214.88149.18114.881
1314.82449.32414.824
1414.85652.75614.856
1514.85552.75514.855
1614.86052.76014.860
1714.85552.75514.855
1814.83449.13414.834
1912.86612.86612.866
2012.87312.87312.873
2112.87312.87312.873
2212.86912.86912.869
2312.86812.86812.868
2412.86512.86512.865
Table 8. The Comparison Results Between Newton and Proposed Methods.
Table 8. The Comparison Results Between Newton and Proposed Methods.
Newton’s MethodProposed Method
GenP (MW)GenP (MW)GenP (MW)GenP (MW)GenP (MW)GenP (MW)
10190374771019037477.026
202019380202019.001380
30212043943021204.006394
40224840607402248.00240607.04
54502304105450.021230410
685240420685240420
70251554307025155.006430
80261604408026160.006440
90270452529027045252.006
10028391464010028391.0214640.001
112202939247011220.00629392.0184736.001
1231430513.8648012314.01330516.415480
130310490130310490
147320500147320500
1503305136150330510
160340520160340520
170350530170350530
180360540180360540
Total Power (MW) 4374.86 4377.59
Total Cost ($) 62,492.967 62,556.216
Losses (MW) 132.86 135.59
Table 9. Location grouping.
Table 9. Location grouping.
LocationBusTotal Demand (MW)
11; 2; 3; 4; 5; 6; 7; 8; 9; 10; 11; 12; 13; 16; 27; 28; 29; 31; 114587
214; 15; 17; 18; 19; 20; 21; 22; 23; 25; 26; 30;32; 113; 115; 117376
333; 34; 35; 36; 37; 38; 39; 40; 41; 42; 43; 44; 45; 46; 47; 48; 49; 50; 51; 52; 53; 54; 55; 56; 57; 58; 59; 60; 61; 63; 641342
424; 62; 65; 66; 67; 68; 69; 70; 71; 72; 73; 74; 75; 76; 77; 78; 79; 80; 81; 97; 98; 99; 116; 1181033
582; 83; 84; 85; 86; 87; 88; 89; 90; 91; 92; 93; 94; 95; 96; 100; 101; 102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 112904
Table 10. LMP, Losses, and Consumer Prices for a Large-Scale System.
Table 10. LMP, Losses, and Consumer Prices for a Large-Scale System.
LocationLoad (MW)LMPmax ($/MWH)Losses (MW)LCP ($/MWH)
1587.00023.28618.76224.030
2376.00022.35112.01823.066
31342.00023.51242.89424.264
41033.00022.37333.01823.088
5904.00022.45028.89423.168
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Raharjo, J.; Zein, H. Energy Bidding Quadratic Model and the Use of the B-Loss Matrix for Determining Consumer Energy Price. Appl. Sci. 2022, 12, 9743. https://doi.org/10.3390/app12199743

AMA Style

Raharjo J, Zein H. Energy Bidding Quadratic Model and the Use of the B-Loss Matrix for Determining Consumer Energy Price. Applied Sciences. 2022; 12(19):9743. https://doi.org/10.3390/app12199743

Chicago/Turabian Style

Raharjo, Jangkung, and Hermagasantos Zein. 2022. "Energy Bidding Quadratic Model and the Use of the B-Loss Matrix for Determining Consumer Energy Price" Applied Sciences 12, no. 19: 9743. https://doi.org/10.3390/app12199743

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop