Next Article in Journal
Composite Cements Using Ground Granulated Blast Furnace Slag, Fly Ash, and Geothermal Silica with Alkali Activation
Next Article in Special Issue
Examining the Relative Importance and Association between Safety Leadership Styles and Factors Affecting Organizational Safety Climate
Previous Article in Journal
A Machine Learning-Based Approach to Evaluate the Spatial Performance of Courtyards—A Case Study of Beijing’s Old Town
Previous Article in Special Issue
A Study of the Foremen’s Influence on the Safety Behavior of Construction Workers Based on Cognitive Theory
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Systematic Review

A Bibliometrics-Based Systematic Review of Safety Risk Assessment for IBS Hoisting Construction

Department of Civil Engineering, Faculty of Engineering, Universiti Putra Malaysia (UPM), Serdang 43400, Malaysia
*
Author to whom correspondence should be addressed.
Buildings 2023, 13(7), 1853; https://doi.org/10.3390/buildings13071853
Submission received: 2 June 2023 / Revised: 27 June 2023 / Accepted: 18 July 2023 / Published: 21 July 2023
(This article belongs to the Special Issue Proactive and Advanced Research on Construction Safety Management)

Abstract

:
Construction faces many safety accidents with urbanization, particularly in hoisting. However, there is a lack of systematic review studies in this area. This paper explored the factors and methods of risk assessment in hoisting for industrial building system (IBS) construction. Firstly, bibliometric analysis revealed that future research will focus on “ergonomics”, “machine learning”, “computer simulation”, and “wearable sensors”. Secondly, the previous 80 factors contributing to hoisting risks were summarized from a “human–equipment–management–material–environment” perspective, which can serve as a reference point for managers. Finally, we discussed, in-depth, the application of artificial neural networks (ANNs) and digital twins (DT). ANNs have improved the efficiency and accuracy of risk assessment. Still, they require high-quality and significant data, which traditional methods do not provide, resulting in the low accuracy of risk simulation results. DT data are emerging as an alternative, enabling stakeholders to visualize and analyze the construction process. However, DT’s interactivity, high cost, and information security need further improvement. Based on the discussion and analysis, the risk control model created in this paper guides the direction for future research.

1. Introduction

Construction is still considered one of the most hazardous industries, with safety accidents being a primary concern for many years [1,2]. These accidents have severe implications that cannot be ignored [3,4]. In Malaysia alone, there were 148 construction accidents in 2022, resulting in 59 fatalities [5]. Even in economically developed European countries, construction still causes many casualties. For instance, in Germany, 115,739 people were injured due to construction accidents in 2020, according to the ILO [6].
In the construction industry, hoisting accidents are an unfortunately common occurrence. Studies conducted by Shao (2019) and Simutenda (2022) have shown that a significant proportion of safety incidents can be attributed to hoisting [7,8]. This is particularly true for equipment such as tower and truck cranes, which are critical in transporting loads in high-rise construction projects. Hoisting machinery is a fundamental part of modern construction sites [9,10,11]. However, using such enormous equipment also has inherent risks, as Xu et al. and Grant and Hinze highlighted [12,13]. Project teams must conduct practical risk assessments during the hoisting process to mitigate these risks. Unfortunately, as noted by Esmaeili (2015) and Kargar (2022), many teams only become aware of the dangers once an accident has occurred [14,15]. Therefore, identifying and evaluating the risks associated with hoisting is essential. By doing so, management can take the necessary steps to ensure a safe and secure work environment. Recent research by Wan (2022) and Pan (2021) has emphasized the importance of conducting thorough risk assessments during hoisting [16,17].
Research in this field currently faces an issue with incomplete indicator systems. Most articles only include small-scale indicators, and there is significant variation in the elements used [18,19,20,21]. This highlights the urgent need to generalize risk factors. While various studies use different assessment methods, there is a lack of comparison between them [22,23,24,25]. In fact, the niche area of hoisting in IBS construction has only attracted the interest of researchers in recent years. As a result, there are only a handful of review articles in this area. The uniqueness of this paper lies in the fact that, firstly, we have combined a systematic review approach with bibliometrics, which offers new ideas in terms of methodology compared to traditional reviews. Secondly, this paper uses Bibliomatrix® software to visualize content such as keywords and co-authors to uncover research trends and topical themes. This new software, based on the R language, is powerful but complex to use and, therefore, currently underused, making this paper somewhat pioneering in its technical approach. Finally, our findings interest construction industry professionals, policymakers, and researchers involved in IBS construction projects. The identified framework for future research can guide the development of effective safety protocols and strategies that can contribute to the overall improvement of safety standards for the hoisting of IBS construction.
The following sections are structured as shown in Figure 1. Section 2 covers the research material and methodology, including an introduction to the systematic review and bibliometric approaches. Section 3 provides an overview of the results of the bibliometric and inductive analyses, mainly covering risk factors and assessment methods. Section 4 provides a framework discussion on the application and future research directions of ANN and DT, and Section 5 concludes with a summary and limitations.

2. Materials and Methods

2.1. Materials

The PRISMA protocol (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) was used in this literature review. The PRISMA guidelines outline the necessary components of a systematic review or meta-analysis report, including the research question, search strategy, study selection criteria, data extraction methods, data analysis, and conclusions [26]. Following these guidelines ensures that the research process is transparent and comprehensive, essential in assessing the validity and replicability of studies [27,28,29].
Figure 2 illustrates the PRISMA method, which utilizes the comprehensive civil engineering literature available on the Web of Science (WoS) and Scopus databases. While both databases offer vast literature, WoS provides more refined articles, and Scopus provides a broader range of topics [30,31]. To demonstrate, we used WoS’s search process and entered keywords such as “hoisting”, “safety”, “risk assessment”, “risk evaluation”, and “crane” to perform a combined topic search, which yielded 597 records. We filtered the search results by specifying the fields of specialization as “public environmental occupational health”, “engineering civil”, “engineering multidisciplinary”, and “construction building technology”, resulting in 231 records. After narrowing down the search results to only records in English, we were left with 226 records. Peer-reviewed articles undergo rigorous evaluation processes by field experts, ensuring the reliability and quality of the research. They provide the most up-to-date research findings and are more likely to reflect the current state of knowledge in the field. Furthermore, journal articles offer more detailed and in-depth analyses of specific research questions or topics, presenting empirical evidence, methods, results, and discussion more comprehensively, which makes them suitable for rigorous literature reviews. Therefore, we identified only 136 peer-reviewed articles as the dataset. Similarly, we obtained 342 articles from Scopus, and after a manual review of the full text by three experts, we identified 197 records that met the criteria.

2.2. Methods

Bibliometric analysis is a technique that originated from Nalimov and Mulchenko’s (1971) book on the progression of science as an information process. This approach employs statistical methods to investigate the influence of scientific publications, encompassing author distribution, citations, keywords, and publications [32,33]. To monitor the development of the field more impartially, the researcher usually entails utilizing bibliometric databases such as Web of Science, Scopus, or Google Scholar, as they contain extensive metadata on scientific publications [34,35].
Numerous tools are available for conducting bibliometric analysis, including VOSviewer®, Gephi®, CiteSpace®, SciMAT®, Bibliomatrix®, and HistCite®. Each tool has its own strengths and weaknesses, as highlighted in recent studies [36,37,38]. For this study’s bibliographic data analysis, Bibliomatrix® was selected due to its rich features and reliable data visualization capabilities [39,40,41]. In the construction field, recent literature reviews have focused on topics such as BIM collaboration and risk [42], construction waste [43], wood waste from construction [44], and stakeholder relationships in off-site construction [45]. By using Bibliomatrix®, researchers can conduct co-word analysis and co-citation network analysis to visualize the field’s research evolution [46,47,48].
Our team also has conducted an inductive analysis of recent high-quality papers by creating concise summaries of key findings. The analysis focused on two main aspects—risk factors and assessment methods. Qualitative content analysis can be inductive or deductive; we used the former. We extracted specific factors from previous studies to establish a formal IBS hoisting risk control model, which aims to clarify and create more cohesion in the field of knowledge.

3. Results

3.1. Annual Publication and Main Sources

Annual publication volume is often used to gauge the level of productivity within a specific field, indicating its research intensity [49]. Figure 3 displays the yearly publication count in this area from 1994 to 2023. Between 1992 and 2012, the number of publications remained low, with a high of only 9, indicating that the topic needed to receive more attention during that period. However, after 2012, there was a significant surge in published articles, reaching 21 in 2022, indicating that the topic is now a thriving academic area.
MeanTCperYear is a metric measuring the total publications and average total citations per year. It provides valuable insights into the impact of publication [50]. To calculate MeanTCperYear, we divide the total citations by the years between the current and publication years. Total citations refer to the number of citations a research paper or publication receives, while the current year represents the current year, and the publication year denotes the year the paper was published. For example, if a paper has received 100 citations since its publication five years ago, the average total citations per year would be 100/5 = 20 citations per year. Figure 4 displays the MeanTCperYear values in this field from 1992 to 2023. From 1992 to 2011, it remained below 2.5, fluctuating consistently. After 2013, there were two significant swings, with a peak of 4.74 in 2017. However, in the last five years, it has steadily declined from 4.74 to 1.41, indicating a need for more influential and high-quality articles in the field as it is inversely proportional to the number of published articles.
For the convenience of readers, Table 1 displays the top 10 primary sources related to this field. Notably, “Applied Ergonomics” dominates the category of occupational health journals with 35 sources. “Safety Science” and “Sensors” are closely behind, with 22 and 9 sources, respectively. This information can aid readers in quickly identifying relevant sources.
Table 2 indicates the top three institutions as follows: Vanderbilt University (United States), Hong Kong Polytechnic University (China), and Southwest Petroleum University (China). In terms of authors, the top three are N. Arjmand, Z. Liu, and ON. Aneziris.

3.2. National Co-Authorship

In Figure 5 from Bibliomatrix®, the frequency of collaboration between countries is visualized; the connection line’s thickness reflects the cooperation’s strength. The darker the color of the country, the higher the number of publications (Grey means there are no articles that meet the screening criteria). The collaboration frequency of Iran and Canada is the highest at 4, while the United Kingdom and Italy have the second-highest rating at 3. Partnerships between other countries such as Iran and Germany or Canada and the United States also hold significant importance.
Bibliomatrix®’s Figure 6 displays the primary co-author’s team, with colors representing different groups and node sizes indicating author productivity [51]. For example, the blue team includes Liu Z, Sun Z, Meng X, Chu X, and Ma H. It is worth noting that all teams depicted in the figure have made remarkable contributions to field development.
Figure 7 from Bibliomatrix® shows the changes in lead authors in a particular field over time. The nodes in the graph represent authors, and the lines connecting them indicate citation relationships. The graph shows the radial network, suggesting the field is expanding gradually. Notably, articles by Nurse Ca, Zhou G, Hu S, and Sadeghi H in 2023 are worth referencing for interested readers.

3.3. Topic Trends

Figure 8 displays the development of critical keywords. The present focus of evaluation centers around “crane operations” [52,53,54,55]. Analyzing “accidents” remains the dominant method [56]. “Machine learning” is gradually replacing traditional approaches [57,58,59]. “Wearable sensors” is increasingly apparent in addressing human risks [60,61,62], which can monitor the factors that may impact operation [63,64]. “Manual material handling” poses various risks, and it is vital to include it in a hoisting risk assessment. “Musculoskeletal disorder” is an injury or illness that affects the musculoskeletal system, and occurs due to repetitive or awkward movements, constant poor posture, or physical exertion, leading to pain, discomfort, and functional limitations [65,66]. “Backache” is one of the most prevalent types of work-related musculoskeletal disorders (WMSDs) and a risk factor [67,68]. Therefore, it is essential to provide “ergonomics” equipment and “personnel training” to promote correct lifting techniques [69,70].

3.4. Hoisting Risk Factors

The risks associated with hoisting in construction are multifaceted and interconnected [52,71,72]. Zavadskas (2010) examined the interests, objectives, and factors influencing construction efficiency [73]. Song (2022) identified the external environment, organizational factors, preconditions that trigger accidents, and unsafe leadership behaviors as the main factors impacting safety in assembly building construction [25]. Wang (2022) stressed the importance of scaffolding, footings, and formwork support systems [74]. Wang (2022) classified risk factors based on the Wuli–Shili–Renli (WSR) system and found that risk probabilities show seasonal and dynamic trends, requiring targeted measures to prevent and neutralize different risk sources at other points in time [16]. Ajith (2019) used hazard identification and risk assessment (HIRA) techniques to prioritize risks on construction sites and found that crane operations, working at height, and drilling were the top three high-risk tasks [75]. Shapira (2009) identified the main factors affecting safety in the tower crane environment, including crowded conditions, overlapping work areas, and time, budget, and labor constraints [76]. Umar (2020) found that management commitment, training, employee engagement, behavior, communication, accountability, fairness, and leadership were the most prevalent safety climate factors [77]. Jamalluddin (2022) found that design, management, financial, safety, and logistical factors were significant risk factors that must be considered when implementing IBS construction [78]. Amin (2019) identified UV exposure and mobile equipment risks as the primary risks for IBS construction sites [79]. Ismail (2012) found that personal awareness and communication significantly impacted the implementation of safety management systems on construction sites [80]. Wuni (2019) identified critical risk factors (CRFs) in modular integrated build (MiC) applications, including stakeholder fragmentation, high initial capital costs, poor supply chain integration, delayed delivery of modular components, and inadequate government support and regulation [81]. Finally, Construction site layout plans (CSLP) are crucial to prefabricated building project management, especially with the prevalence of hoisting operations, emphasizing the importance of tower cranes and precast supply point locations [82].
Through a thorough review of the literature, we have identified 80 key risk factors (Table 3). On a human level, the crane operator’s proper training and adherence to safety procedures are crucial to prevent accidents. Detecting errors related to human factors, such as distraction, fatigue, or misjudgment, may not always be easy. Regular training, certification, and monitoring of crane operators and appropriate rest periods can help reduce this risk. Effective communication between crane operators, fitters, signalers, and others involved in lifting operations is also essential for safe crane operations. Poor communication can lead to the mishandling of loads or other accidents. Clear communication protocols, standardized hand signals, and practical communication training can help reduce this risk. Cranes are complex machines with many mechanical and electrical components that can fail, leading to equipment failure, structural collapse, or other accidents. Regular maintenance, inspection, and compliance with the manufacturer’s recommendations for using and maintaining the equipment can help identify and reduce this risk. Overloading is another common risk factor in crane operations. It can lead to instability, tipping, or structural failure. This risk factor is usually detectable and can be mitigated by following the load capacity limits specified by the crane manufacturer and performing appropriate load calculations. Rigging, which involves attaching a load to a crane hook using slings, chains, or other lifting equipment, is critical to prevent loads from becoming unstable or falling off during lifting operations. Improper rigging can usually be detected by visual inspection. Proper training and certification of the rigging, inspecting the rigging for damage, and using adequate rigging techniques following industry standards can help reduce this risk. Environmental factors such as wind, rain, snow, and uneven ground can also pose risks during crane operations. Wind gusts can cause loads to swing or sway, leading to accidents. Although weather conditions are usually detectable, sudden changes in the weather or wind gusts may be difficult to anticipate, making it challenging to reduce the risk. Monitoring weather conditions and developing appropriate protocols for adverse weather conditions can help minimize this risk.

3.5. Risk Assessment Methods

We summarized the methods used to assess hoisting risk in recent years, as shown in Table 4. There are many shortcomings in current risk assessment methods for hoisting construction, mainly including the following reasons: (1) Complexity and uniqueness of hoisting construction: Hoisting construction involves complex operations, different site conditions, different equipment, and dynamic interactions between different elements. Many risk assessment methodologies fail to adequately capture the complexity and uniqueness of hoisting, resulting in a limited understanding of the associated risks [55,111,112]. (2) Lack of specific guidance and standards: The lack of comprehensive and standardized guidance specific to lifting construction poses a challenge to risk assessors [22,84]. Generic risk assessment methods may not address the specific hazards and complexities of lifting operations, resulting in the inadequate identification and assessment of risks. (3) Inadequate consideration of the human element: Hoisting construction relies heavily on human operators, riggers, and other personnel, who play a key role in ensuring safety. However, many risk assessment methods tend to focus more on technical aspects and equipment-related risks, often neglecting the critical human factor [15,23,113]. (4) Lack of real-time and dynamic analysis: Traditional risk assessment methods often involve static analysis based on historical data or what-if scenarios. However, hoisting is a dynamic and evolving process where risks can change rapidly due to factors such as changing site conditions, project progress and human behavior. Failure to incorporate real-time and dynamic analysis into risk assessment can lead to outdated and ineffective risk mitigation strategies [4,16,24]. (5) Limited stakeholder involvement: Effective risk assessment requires the active involvement and collaboration of various stakeholders, including project managers, workers, equipment suppliers and safety professionals. However, some methodologies may not adequately engage these stakeholders, resulting in a lack of diverse perspectives and relevant input [100,114,115].
One of the most widely used methods for risk analysis is fault tree analysis (FTA). This deductive approach involves identifying and examining all potential events or circumstances that could lead to an undesired outcome, such as a crane accident. A tree structure is employed to demonstrate the events or conditions resulting in the adverse effect, assigning each event or situation a probability [56,110]. FTA enables a quantitative risk assessment by identifying all possible factors and their likelihood [15,24]. However, FTA necessitates specialized knowledge to estimate probabilities accurately and can be complicated and time-consuming [119].
A Bayesian network (BN) is a graphical model that displays the probabilistic relationships between variables, providing a structured method for expressing and modelling the uncertainty and dependencies between variables related to construction risk [113,120]. Nodes within the network represent variables such as weather conditions, equipment failure rates, operator capabilities, and load characteristics, with edges capturing probabilistic relationships; this allows for a quantitative representation of the likelihood of different risk events occurring and their interdependencies [17,84]. Experts can contribute subjective probabilities, data, and domain-specific knowledge, which can be integrated into the Bayesian network to update risk assessments. This helps capture the tacit knowledge of domain experts, which may not be easily quantifiable but can play a crucial role in assessing the risks of hoisting construction [84,86,121,122]. The Bayesian network can be updated as new data becomes available during construction, allowing for real-time risk monitoring and decision-making based on the changing risk landscape. It also enables different risk scenarios to be modelled and analyzed, empowering construction stakeholders to assess the likelihood of risk events occurring under different conditions [122,123,124].
An artificial neural network (ANN) is a computational model inspired by the structure and function of biological neural networks in the human brain [125,126]. As shown in Figure 9, a classical artificial neural consists of an input layer, hidden layers, and an output layer [127,128]. The hidden layer is many processing elements between the output layer and the input layer, which are interrelated and layered [129,130]. The network learns from example data by adjusting the strength or weight of the connections between neurons, enabling it to make predictions or classify based on new inputs [131]. In dealing with risk assessment, the sources of information are neither complete nor illusory. Decision rules sometimes contradict each other and sometimes do not exist. This poses a great difficulty for traditional information processing methods, but neural networks can handle these problems well and give reasonable recognition and judgments [132,133]. Currently, those such as BP neural networks are used for risk assessment of many projects such as railroads, highways, tunnel openings, etc. [134,135].
Digital twins is a virtual representation or digital copy of a physical object, system, or process, which combines real-time data, sensor information, and advanced modelling techniques to create a virtual copy that mimics the behavior and characteristics of its physical counterpart [136,137,138]. Digital twins are used in risk assessment because they provide a powerful tool to simulate and analyze potential risks in a secure and controlled environment [139,140,141]. In DT, inspection data are collected in the real world and then transferred to the simulation environment for further evaluation; the virtual model runs simulations to obtain the best predictions, enabling it to provide rapid solutions for adapting natural processes to changing conditions [142,143].

4. Discussion

4.1. Application of ANN and DT

It is important to discuss the prospects and potential challenges for the application of artificial neural networks and digital twins in hoisting construction risks. The application of these technologies is improving operational efficiency and safety. For example, artificial neural networks can help optimize hoisting parameters, such as load capacity and speed, to minimize risk. Digital twins can identify potential hazards and virtually test different scenarios before they are executed in an actual construction environment. However, the application process involves addressing issues such as data availability, model accuracy, implementation costs and technician requirements. By acknowledging these factors, a balanced view of the opportunities and limitations of these technologies is provided to assist project managers with best practices.
The construction site is not random, it is constructed according to the laws of physics, biology, and sociology, and the mind reflects this structure [144,145,146]. Artificial neural networks, as approximators for identifying objective laws, are often criticized for “fitting” and “black boxes” in the application of risk assessment [147,148,149]. The three common cases of model fitting are “ideal fit”, “underfitting”, and “overfitting” [150]. An underfit model has too few parameters to capture the underlying structure of the observed data and therefore provides poor predictions or fails to generalize; an overfit model is flexible enough to adapt and/or remember the structure of the training sample [151]. An ideal-fit model learns the data’s underlying generative or global structure by exposing some underlying factors or rules [152]. In contrast to underfitting and overfitting models, ideal fit models can generalize, which means accurately predicting new observations that were never seen during training. Traditionally, experimenters have used highly controlled data to construct rule-based ideal-fit models in the hope that these models will generalize beyond the training set into real life [153]. However, the “ideal fit” models thus generated are often heavily noisy. Over-parameterized models will tend to learn traits specific to the training data and will not extrapolate beyond that range [154,155]. In the presence of complex non-linearities and interactions between variables in different parts of the parameter space, extrapolation from such limited data is bound to fail [156]. In such cases, “direct fit” based on big data may be a good option. A “direct fit” is not an “intuitive fit”, and allows full regularization only in the interpolation region, provided that the variability in the data is not caused by random noise, to obtain as good or better predictions than an ideal fit model’s performance [157]. Direct-fit models regularize the process to avoid excessive overfitting and optimize alignment with the training data structure [158]. This regularization can crucially be achieved using generic local computations and does not require any explicit model of the underlying characteristics of the data [159,160,161]. Critics often derogate over-parameterized direct-fit models as “black-box” models: models that give the correct inputs produce the correct outputs without explaining their inner workings [130]. Instead, we argue that extensive direct-fit neural network models provide a concise framework for understanding neural code, emphasizing the close connection between the world’s structure and the brain’s structure [162]. After all, compared to the billions of years that brain nerves have evolved in a complex world, ANNs are still in their infancy. However, “direct fitting” relies on the dense and extensive sampling of the parameter space to obtain reliable interpolations [54]. Thus, the emergence of the “digital twin” is a powerful aid to this idea. In addition, ANN can be mixed with several meta-heuristics, such as the lion optimization algorithm (LOA), the social engineering optimizer (SEO), the red deer algorithm (RDA), and the Levenberg–Marquardt algorithm (LMA) to improve accuracy and speed further [163,164].
Digital twins (DT), on the other hand, use integrated technologies from the Internet of Things (IoT), building information modelling (BIM) and many sensors so that the system can collect data throughout the lifting process [165]. Previous research has shown that DT has many advantages, making it suitable for risk modelling, especially for industrial building systems (IBS) with complex issues and high prefabrication rates [141,166]. Depending on the spatial scale, data from DT provides a virtual copy of the physical construction project compared to other sources and allows stakeholders to visualize and analyze the construction process [167,168]. In addition, DT is beneficial for data sharing and communication to minimize risks and facilitate collaboration between project stakeholders, including architects, contractors, engineers, and owners [169]. However, there are some limitations to using DT in the context of sub-application IBS. Currently, camera positions and poses need to be calibrated individually, bidirectional interaction capabilities between virtual and real models must be implemented, and video data structure algorithms are not integrated. Future work should include the data-driven online updating of 3D scenes, predictive projection, perception, and analysis of application scenes based on the fusion of virtual and accurate models [170,171]. The capabilities and applications of the digital twin are also limited by infrastructure and computing power [172]. DT has limited intelligence and relies on inherent knowledge rules and independent AI-powered simulations and predictions to make decisions and forecasts [142,173]. Not all algorithms produce accurate results, and advanced algorithms should be selected based on their accuracy in producing the desired results. Table 5 shows various machine learning algorithms that can be used in DT, including support vector machines (SVM), random forest (RF), k nearest neighbor (KNN), and convolutional neural networks (CNNs). Implementing DT in construction risk assessment requires significant investment in technical infrastructure, including sensors, data collection, and analytical tools, which can be challenging for smaller construction projects or companies with limited resources, especially for developing countries. Not all countries can afford DT due to economic constraints, so the high cost and difficulty of handling massive DT datasets may be why DT is not used in these countries [168]. Another challenge in using DT is the ample data storage required due to the high density of real-time data; processing multidimensional data requires a long computation time [174]. As data are collected from multiple stakeholders with different data quality standards, DT needs to improve its information processing regarding complex logical relationships between objects, threats, and security rules [175,176]. DT relies on data communication and storage and is vulnerable to cyber threats. Protecting sensitive data from cyber-attacks and ensuring data privacy may be a challenge for the construction industry, where cybersecurity measures may need to be better developed [177,178].

4.2. Future Research Directions

Future research can concentrate on critical areas to enhance hoisting construction risk assessment. Firstly, developing advanced risk assessment models that integrate artificial intelligence, machine learning, and data analytics to leverage real-time data from different sources can improve the accuracy and timeliness of identifying and mitigating risks. Secondly, exploring the potential of BIM in risk assessment can provide a comprehensive digital representation of the construction project to identify and analyze potential risks during the design phase. Additionally, considering the impact of human behavior, communication, and organizational culture on hoisting construction safety, research efforts can integrate human factors and organizational aspects into risk assessment methodologies. Lastly, researching the effectiveness of novel risk mitigation strategies, such as autonomous systems, robotics, and sensor technologies, can enhance safety during lifting operations. These research directions can significantly improve risk assessment in hoisting construction, leading to safer and more efficient construction practices. As a result, we propose the hoisting risk control model shown in Figure 10.

5. Conclusions

Hoisting risk assessment has garnered significant attention due to the high occurrence of construction accidents, particularly in Australia, China, the USA, and Europe. Accurate and valid risk factors are important input parameters for risk modelling and assessment. The performance of risk models is highly dependent on the comprehensiveness of the risk factors, especially in small-scale risk modelling studies. Simulation results from risk models show differences in assessing the impact and likelihood of risk when using detailed risk factors, demonstrating that risk factors significantly impact the risk assessment outcome. The 80 risk factors in this study inform future models. Furthermore, the constant updating of risk models explains the interest in exploring new techniques to produce accurate assessment results. In this review, the modeling results of numerous hoisting risk studies show that DT can provide real-time and precise sensing data to improve the inputs to risk models, enabling risk model results to be more specific. However, data and interaction integration issues, high costs, and information security continue to limit the development of the DT. The human factors involved in hoisting are only captured by sensor data, resulting in too quantitative model parameters. Furthermore, integrating ANNs and other assessment methods or theoretical frameworks is a promising approach to addressing the problems associated with the inadequate representation of multidimensional non-linear data. Thus, research on extending risk data collection systems and more accurate deep learning algorithms can be foreseen in the upcoming applications of hoisting risk.

Author Contributions

Conceptualization, A.H.A. and Y.J.; methodology, Y.J.; software, Y.J.; validation, Y.J. and A.H.A.; formal analysis, Y.J.; investigation, Y.J.; resources, Y.J.; data curation, Y.J.; writing—original draft preparation, Y.J.; writing—review and editing, Y.J. and A.H.A.; visualization, Y.J.; supervision, A.H.A., N.A.H. and N.A.B.; project administration, Y.J. and A.H.A. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The data used to support the findings of this study are available from the corresponding author upon request.

Acknowledgments

The authors would like to thank the Department of Civil Engineering, Faculty of Engineering, University Putra Malaysia, Serdang, Malaysia, for supporting this review paper.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Abdul Halim, N.N.A.; Jaafar, M.H.; Mohamad Anuar Kamaruddin, M.A.; Kamaruzaman, N.A.; Jamir Singh, P.S. The Causes of Malaysian Construction Fatalities. J. Sustain. Sci. Manag. 2020, 15, 236–256. [Google Scholar] [CrossRef]
  2. Shafique, M.; Rafiq, M. An Overview of Construction Occupational Accidents in Hong Kong: A Recent Trend and Future Perspectives. Appl. Sci. 2019, 9, 2069. [Google Scholar] [CrossRef] [Green Version]
  3. Zhou, C.; Luo, H.; Fang, W.; Wei, R.; Ding, L. Cyber-Physical-System-Based Safety Monitoring for Blind Hoisting with the Internet of Things: A Case Study. Autom. Constr. 2019, 97, 138–150. [Google Scholar] [CrossRef]
  4. Liu, Z.-S.; Meng, X.-T.; Xing, Z.-Z.; Cao, C.-F.; Jiao, Y.-Y.; Li, A.-X. Digital Twin-Based Intelligent Safety Risks Prediction of Prefabricated Construction Hoisting. Sustainability 2022, 14, 5179. [Google Scholar] [CrossRef]
  5. DOSH. Occupational Accident Statistics. Available online: https://www.dosh.gov.my/index.php/statistic-v/occupational-accident-statistics/occupational-accident-statistic-2022/ (accessed on 1 May 2023).
  6. ILO (International Labor Organization). Statistics on Safety and Health at Work. Available online: https://ilostat.ilo.org/topics/safety-and-health-at-work/ (accessed on 9 March 2023).
  7. Shao, B.; Hu, Z.; Liu, Q.; Chen, S.; He, W. Fatal Accident Patterns of Building Construction Activities in China. Saf. Sci. 2019, 111, 253–263. [Google Scholar] [CrossRef]
  8. Simutenda, P.; Zambwe, M.; Mutemwa, R. Types of Occupational Accidents and Their Predictors at Construction Sites in Lusaka City. medRxiv 2022. [Google Scholar] [CrossRef]
  9. Huang, Z.; Ren, L.; Tong, Y.; Ouyang, W. The Research on Safety Evaluation Theory of Hoisting Machinery Based on Sustainable Development. E3S Web Conf. 2021, 257, 03073. [Google Scholar] [CrossRef]
  10. Sadeghi, H.; Zhang, X.; Mohandes, S.R. Developing an Ensemble Risk Analysis Framework for Improving the Safety of Tower Crane Operations under Coupled Fuzzy-Based Environment. Saf. Sci. 2023, 158, 105957. [Google Scholar] [CrossRef]
  11. Sadeghi, S.; Soltanmohammadlou, N.; Rahnamayiezekavat, P. A Systematic Review of Scholarly Works Addressing Crane Safety Requirements. Saf. Sci. 2021, 133, 105002. [Google Scholar] [CrossRef]
  12. Xu, P.; Lu, C.; Lu, N. The Improvement Research of Hoisting Machinery Accidents’ Emergency Response Mechanism under the Idea of Safety and Delicacy Management. In Proceedings of the International Conference on Education, Management and Computing Technology (ICEMCT-15), Tianjin, China, 13–14 June 2015; Atlantis Press: Amsterdam, The Netherlands, 2015; pp. 221–223. [Google Scholar] [CrossRef]
  13. Grant, A.; Hinze, J. Construction Worker Fatalities Related to Trusses: An Analysis of the OSHA Fatality and Catastrophic Incident Database. Saf. Sci. 2014, 65, 54–62. [Google Scholar] [CrossRef]
  14. Esmaeili, B.; Hallowell, M.R.; Rajagopalan, B. Attribute-Based Safety Risk Assessment. I: Analysis at the Fundamental Level. J. Constr. Eng. Manag. 2015, 141, 04015021. [Google Scholar] [CrossRef]
  15. Kargar, V.; Jahangiri, M.; Alimohammadlu, M.; Kamalinia, M.; Mirazahossieninejad, M. Risk Assessment of Mobile Crane Overturning in Asymmetric Tandem Lifting (ATL) Operation Based on Fuzzy Fault Tree Analysis (FFTA). Results Eng. 2022, 16, 100755. [Google Scholar] [CrossRef]
  16. Wan, P.; Wang, J.; Liu, Y.; Lu, Q.; Yuan, C. On Risk Probability of Prefabricated Building Hoisting Construction Based on Multiple Correlations. Sustainability 2022, 14, 4430. [Google Scholar] [CrossRef]
  17. Pan, Z.; Wang, J.; Wang, J.; Tian, M.; Liu, S. Safety Risk Analysis for Prefabricated Building Hoisting Construction Based on STPA-BN. ICCREM 2021, 2021, 171–180. [Google Scholar] [CrossRef]
  18. Aneziris, O.N.; Papazoglou, I.A.; Mud, M.L.; Damen, M.; Kuiper, J.; Baksteen, H.; Ale, B.J.; Bellamy, L.J.; Hale, A.R.; Bloemhoff, A.; et al. Towards Risk Assessment for Crane Activities. Saf. Sci. 2008, 46, 872–884. [Google Scholar] [CrossRef]
  19. Zheng, X.J.; Wang, Y.Y.; Xie, Z.Y. Failure Probability Calculation of Tower Crane Hoisting Mechanism. Appl. Mech. Mater. 2013, 483, 533–537. [Google Scholar] [CrossRef]
  20. Zhu, L.; Ma, H.; Huang, Y.; Liu, X.; Xu, X.; Shi, Z. Analyzing Construction Workers’ Unsafe Behaviors in Hoisting Operations of Prefabricated Buildings Using HAZOP. Int. J. Environ. Res. Public Health 2022, 19, 15275. [Google Scholar] [CrossRef]
  21. Yingbo, J.; Yanyao, L.; Yan, L. Prefabricated Building Hoisting Safety Risk Identification and Control. IOP Conf. Ser. Earth Environ. Sci. 2019, 371, 032004. [Google Scholar] [CrossRef]
  22. Liu, Z.; Li, A.; Sun, Z.; Shi, G.; Meng, X. Digital Twin-Based Risk Control during Prefabricated Building Hoisting Operations. Sensors 2022, 22, 2522. [Google Scholar] [CrossRef]
  23. Xu, G. Analysis of Safety Behavior of Prefabricated Building Workers’ Hoisting Operation Based on Computer Vision. Math. Probl. Eng. 2022, 2022, 1–9. [Google Scholar] [CrossRef]
  24. Chen, F. Safety Evaluation Method of Hoisting Machinery Based on Neural Network. Neural Comput. Appl. 2020, 33, 565–576. [Google Scholar] [CrossRef]
  25. Song, Y.; Wang, J.; Liu, D.; Guo, F. Study of Occupational Safety Risks in Prefabricated Building Hoisting Construction Based on HFACS-PH and SEM. Int. J. Environ. Res. Public Health 2022, 19, 1550. [Google Scholar] [CrossRef] [PubMed]
  26. PRISMA. Available online: http://prisma-statement.org (accessed on 1 May 2023).
  27. Sarkis-Onofre, R.; Catalá-López, F.; Aromataris, E.; Lockwood, C. How to Properly Use the PRISMA Statement. Syst. Rev. 2021, 10, 117. [Google Scholar] [CrossRef] [PubMed]
  28. Rethlefsen, M.L.; Kirtley, S.; Waffenschmidt, S.; Ayala, A.P.; Moher, D.; Page, M.J.; Koffel, J.B. PRISMA-S: An Extension to the PRISMA Statement for Reporting Literature Searches in Systematic Reviews. Syst. Rev. 2021, 10, 39. [Google Scholar] [CrossRef]
  29. Moher, D.; Stewart, L.; Shekelle, P. Implementing PRISMA-P: Recommendations for Prospective Authors. Syst. Rev. 2016, 5, 15. [Google Scholar] [CrossRef] [Green Version]
  30. Mongeon, P.; Paul-Hus, A. The Journal Coverage of Web of Science and Scopus: A Comparative Analysis. Scientometrics 2015, 106, 213–228. [Google Scholar] [CrossRef]
  31. Chadegani, A.A.; Salehi, H.; Yunus, M.M.; Farhadi, H.; Fooladi, M.; Farhadi, M.; Ebrahim, N.A. A Comparison between Two Main Academic Literature Collections: Web of Science and Scopus Databases. Asian Soc. Sci. 2013, 9, 18–26. [Google Scholar] [CrossRef] [Green Version]
  32. Hosseini, M.R.; Martek, I.; Zavadskas, E.K.; Aibinu, A.A.; Arashpour, M.; Chileshe, N. Critical Evaluation of Off-Site Construction Research: A Scientometric Analysis. Autom. Constr. 2018, 87, 235–247. [Google Scholar] [CrossRef]
  33. He, Q.; Wang, G.; Luo, L.; Shi, Q.; Xie, J.; Meng, X. Mapping the Managerial Areas of Building Information Modeling (BIM) Using Scientometric Analysis. Int. J. Proj. Manag. 2017, 35, 670–685. [Google Scholar] [CrossRef] [Green Version]
  34. Jin, R.; Zou, Y.; Gidado, K.; Ashton, P.; Painting, N. Scientometric Analysis of BIM-Based Research in Construction Engineering and Management. Eng. Constr. Archit. Manag. 2019, 26, 1750–1776. [Google Scholar] [CrossRef] [Green Version]
  35. Vigneshkumar, C.; Ravindra Salve, U. A Scientometric Analysis and Review of Fall from Height Research in Construction. Constr. Econ. Build. 2020, 20, 17–35. [Google Scholar] [CrossRef]
  36. Van Eck, N.J.; Waltman, L. Visualizing Bibliometric Networks. In Measuring Scholarly Impact; Springer: Cham, Switzerland, 2014; pp. 285–320. [Google Scholar] [CrossRef]
  37. Moral-Muñoz, J.A.; Herrera-Viedma, E.; Santisteban-Espejo, A.; Cobo, M.J. Software Tools for Conducting Bibliometric Analysis in Science: An Up-To-Date Review. Prof. Inf. 2020, 29, e290103. [Google Scholar] [CrossRef] [Green Version]
  38. Osinska, V.; Klimas, R. Mapping Science: Tools for Bibliometric and Altmetric Studies. Inf. Res. Int. Electron. J. 2021, 26, 909. [Google Scholar] [CrossRef]
  39. Van Eck, N.J.; Waltman, L. Software Survey: VOSviewer, a Computer Program for Bibliometric Mapping. Scientometrics 2009, 84, 523–538. [Google Scholar] [CrossRef] [PubMed] [Green Version]
  40. Wu, Y. Summary of Research on Contract Risk Management of EPC General Contracting Project—Based on VOSviewer Knowledge Graph Analysis. In Proceedings of the 25th International Symposium on Advancement of Construction Management and Real Estate, Wuhan, China, 28 November 2020; Springer: Singapore, 2020; pp. 1043–1058. [Google Scholar] [CrossRef]
  41. Aria, M.; Cuccurullo, C. Bibliometrix: An R-Tool for Comprehensive Science Mapping Analysis. J. Informetr. 2017, 11, 959–975. [Google Scholar] [CrossRef]
  42. Ali, K.N.; Alhajlah, H.H.; Kassem, M.A. Collaboration and Risk in Building Information Modelling (BIM): A Systematic Literature Review. Buildings 2022, 12, 571. [Google Scholar] [CrossRef]
  43. Han, L.; Gong, Z. Visual Analysis of Construction Waste Research Based on VOSviewer. E3S Web Conf. 2021, 237, 04016. [Google Scholar] [CrossRef]
  44. Maier, D. The Use of Wood Waste from Construction and Demolition to Produce Sustainable Bioenergy—A Bibliometric Review of the Literature. Int. J. Energy Res. 2022, 46, 11640–11658. [Google Scholar] [CrossRef]
  45. Nguyen, B.N.; London, K.; Zhang, P. Stakeholder Relationships in Off-Site Construction: A Systematic Literature Review. Smart Sustain. Built Environ. 2022, 11, 765–791. [Google Scholar] [CrossRef]
  46. Al-Ashmori, Y.Y.; Othman, I.; Rahmawati, Y. Bibliographic Analysis of BIM Success Factors and Other BIM Literatures Using Vosviewer: A Theoretical Mapping and Discussion. J. Phys. Conf. Ser. 2020, 1529, 042105. [Google Scholar] [CrossRef]
  47. Pradhananga, P.; ElZomor, M.; Santi Kasabdji, G. Identifying the Challenges to Adopting Robotics in the US Construction Industry. J. Constr. Eng. Manag. 2021, 147, 05021003. [Google Scholar] [CrossRef]
  48. Guleria, D.; Kaur, G. Bibliometric Analysis of Ecopreneurship Using VOSviewer and RStudio Bibliometrix, 1989–2019. Library Hi Tech 2021, 39, 1001–1024. [Google Scholar] [CrossRef]
  49. Hu, M.; Milner, D. Visualizing the Research of Embodied Energy and Environmental Impact Research in the Building and Construction Field: A Bibliometric Analysis. Dev. Built Environ. 2020, 3, 100010. [Google Scholar] [CrossRef]
  50. Sharun, K.; Musa, T.H.; Musa, H.H.; Kumar, R.; Pawde, A.M.; Chandra, V.; Tuli, H.S.; Dhama, K.; Sharma, G.T.; Amarpal; et al. Mapping Global Trends in Adipose-Derived Mesenchymal Stem Cell Research: A Bibliometric Analysis Using Scopus Database. Ann. Med. Surg. 2022, 77, 103542. [Google Scholar] [CrossRef]
  51. Tang, K.-Y.; Chang, C.-Y.; Hwang, G.-J. Trends in Artificial Intelligence-Supported E-Learning: A Systematic Review and Co-Citation Network Analysis (1998–2019). Interact. Learn. Environ. 2021, 31, 2134–2152. [Google Scholar] [CrossRef]
  52. Salihu, A.A.; Aliyu, S.S.; Abubakar, M. An Evaluation of Safety Risk Factors during Installation and Dismantling of Tower Cranes in Construction Sites. Niger. J. Technol. 2021, 39, 992–1000. [Google Scholar] [CrossRef]
  53. Thanh-Long, N.; Hanoi University of Civil Engineering. An Estimation of the Safety Risk Factors Encountered during Tower Crane Installation and Dismantling on Construction Sites in Vietnam. Int. J. Sustain. Constr. Eng. Technol. 2023, 14, 337–345. [Google Scholar] [CrossRef]
  54. Sadeghi, H.; Mohandes, S.R.; Hosseini, M.R.; Banihashemi, S.; Mahdiyar, A.; Abdullah, A. Developing an Ensemble Predictive Safety Risk Assessment Model: Case of Malaysian Construction Projects. Int. J. Environ. Res. Public Health 2020, 17, 8395. [Google Scholar] [CrossRef]
  55. Yi, J.G.; Cai, X.; Xu, J.C.; Li, H.X.; Dai, S.X. Hoist Safety Risk Assessment Model Research. Adv. Mater. Res. 2011, 383–390, 1225–1230. [Google Scholar] [CrossRef]
  56. Fang, H.; Jianxing, Y.; Haicheng, C.; Zhaohui, W.; Yun, L.; Junxiong, L. Risk Analysis Method of FPSO Module Hoisting and Its Application. China Saf. Sci. J. 2019, 29, 123. [Google Scholar] [CrossRef]
  57. Lee, D.; Kim, M. Autonomous Construction Hoist System Based on Deep Reinforcement Learning in High-Rise Building Construction. Autom. Constr. 2021, 128, 103737. [Google Scholar] [CrossRef]
  58. Li, J.; Jiang, S.; Li, M.; Xie, J. A Fault Diagnosis Method of Mine Hoist Disc Brake System Based on Machine Learning. Appl. Sci. 2020, 10, 1768. [Google Scholar] [CrossRef] [Green Version]
  59. Ma, G.; Wu, Z.; Jia, J.; Shang, S. Safety Risk Factors Comprehensive Analysis for Construction Project: Combined Cascading Effect and Machine Learning Approach. Saf. Sci. 2021, 143, 105410. [Google Scholar] [CrossRef]
  60. Guo, B.H.W.; Zou, Y.; Fang, Y.; Goh, Y.M.; Zou, P.X.W. Computer Vision Technologies for Safety Science and Management in Construction: A Critical Review and Future Research Directions. Saf. Sci. 2021, 135, 105130. [Google Scholar] [CrossRef]
  61. Yang, B.; Zhang, B.; Zhang, Q.; Wang, Z.; Dong, M.; Fang, T. Automatic Detection of Falling Hazard from Surveillance Videos Based on Computer Vision and Building Information Modeling. Struct. Infrastruct. Eng. 2022, 18, 1049–1063. [Google Scholar] [CrossRef]
  62. Fang, W.; Ma, L.; Love, P.E.D.; Luo, H.; Ding, L.; Zhou, A. Knowledge Graph for Identifying Hazards on Construction Sites: Integrating Computer Vision with Ontology. Autom. Constr. 2020, 119, 103310. [Google Scholar] [CrossRef]
  63. Zhu, Y.; Gao, Y.; Zeng, Q.; Liao, J.; Liu, Z.; Zhou, C. Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure. Sensors 2021, 21, 4737. [Google Scholar] [CrossRef]
  64. Zhao, Y.; Cao, C.; Liu, Z.; Mu, E. Intelligent Control Method of Hoisting Prefabricated Components Based on Internet-of-Things. Sensors 2021, 21, 980. [Google Scholar] [CrossRef]
  65. Ranavolo, A.; Draicchio, F.; Varrecchia, T.; Silvetti, A.; Iavicoli, S. Wearable Monitoring Devices for Biomechanical Risk Assessment at Work: Current Status and Future Challenges—A Systematic Review. Int. J. Environ. Res. Public Health 2018, 15, 2001. [Google Scholar] [CrossRef] [Green Version]
  66. Donisi, L.; Cesarelli, G.; Capodaglio, E.; Panigazzi, M.; D’Addio, G.; Cesarelli, M.; Amato, F. A Logistic Regression Model for Biomechanical Risk Classification in Lifting Tasks. Diagnostics 2022, 12, 2624. [Google Scholar] [CrossRef]
  67. Mudiyanselage, S.E.; Nguyen, P.H.D.; Rajabi, M.S.; Akhavian, R. Automated Workers’ Ergonomic Risk Assessment in Manual Material Handling Using SEMG Wearable Sensors and Machine Learning. Electronics 2021, 10, 2558. [Google Scholar] [CrossRef]
  68. Ciccarelli, M.; Papetti, A.; Cappelletti, F.; Brunzini, A.; Germani, M. Combining World Class Manufacturing System and Industry 4.0 Technologies to Design Ergonomic Manufacturing Equipment. Int. J. Interact. Des. Manuf. 2022, 16, 263–279. [Google Scholar] [CrossRef]
  69. Lamooki, S.R.; Hajifar, S.; Kang, J.; Sun, H.; Megahed, F.M.; Cavuoto, L.A. A Data Analytic End-To-End Framework for the Automated Quantification of Ergonomic Risk Factors across Multiple Tasks Using a Single Wearable Sensor. Appl. Ergon. 2022, 102, 103732. [Google Scholar] [CrossRef] [PubMed]
  70. Antwi-Afari, M.F.; Li, H.; Edwards, D.J.; Pärn, E.A.; Seo, J.; Wong, A.Y.L. Biomechanical Analysis of Risk Factors for Work-Related Musculoskeletal Disorders during Repetitive Lifting Task in Construction Workers. Autom. Constr. 2017, 83, 41–47. [Google Scholar] [CrossRef]
  71. Ancione, G.; Paltrinieri, N.; Milazzo, M.F. Integrating Real-Time Monitoring Data in Risk Assessment for Crane Related Offshore Operations. J. Mar. Sci. Eng. 2020, 8, 532. [Google Scholar] [CrossRef]
  72. Shapira, A.; Simcha, M.; Goldenberg, M. Integrative Model for Quantitative Evaluation of Safety on Construction Sites with Tower Cranes. J. Constr. Eng. Manag. 2012, 138, 1281–1293. [Google Scholar] [CrossRef]
  73. Zavadskas, E.; Turskis, Z.; Tamošaitiene, J.; Kazimieras Zavadskas, E.; Tamošaitienė, J. Risk Assessment of Construction Projects. J. Civ. Eng. Manag. 2010, 16, 33–46. [Google Scholar] [CrossRef] [Green Version]
  74. Wang, G.; Liu, M.; Cao, D.; Tan, D. Identifying High-Frequency–Low-Severity Construction Safety Risks: An Empirical Study Based on Official Supervision Reports in Shanghai. Eng. Constr. Archit. Manag. 2021, 29, 940–960. [Google Scholar] [CrossRef]
  75. Ajith, S.; Sivapragasam, C.; Arumugaprabu, V. Quantification of Risk and Assessment of Key Safety Factors for Safe Workplace in Indian Building Construction Sites. Asian J. Civ. Eng. 2019, 20, 693–702. [Google Scholar] [CrossRef]
  76. Shapira, A.; Lyachin, B. Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes. J. Constr. Eng. Manag. 2009, 135, 24–33. [Google Scholar] [CrossRef] [Green Version]
  77. Umar, T. Safety Climate Factors in Construction—A Literature Review. Policy Pract. Health Saf. 2020, 18, 80–99. [Google Scholar] [CrossRef]
  78. Jamalluddin, N.A.; Adnan, H.; Bakhary, N.A.; Rosman, M.R. Risk Mitigation in Industrialized Building System (IBS) Construction. IOP Conf. Ser. Earth Environ. Sci. 2022, 1067, 012065. [Google Scholar] [CrossRef]
  79. Ariff Mohd Amin, M.; Haslinda Abas, N.; Harina Azman, A.; Khatijah Mohamad, S. Identification of the Activity-Based Hazards/Risks Involved in the IBS Construction Process: Case Study of Project That Uses Prefabricated Steel Framing System and Prefabricated Timber Framing System. IOP Conf. Ser. Mater. Sci. Eng. 2019, 601, 012032. [Google Scholar] [CrossRef] [Green Version]
  80. Ismail, Z.; Doostdar, S.; Harun, Z. Factors Influencing the Implementation of a Safety Management System for Construction Sites. Saf. Sci. 2012, 50, 418–423. [Google Scholar] [CrossRef]
  81. Wuni, I.Y.; Shen, G.Q.P.; Mahmud, A.T. Critical Risk Factors in the Application of Modular Integrated Construction: A Systematic Review. Int. J. Constr. Manag. 2019, 22, 133–147. [Google Scholar] [CrossRef]
  82. Lu, Y.; Zhu, Y. Integrating Hoisting Efficiency into Construction Site Layout Plan Model for Prefabricated Construction. J. Constr. Eng. Manag. 2021, 147, 04021130. [Google Scholar] [CrossRef]
  83. Lv, R.; Chen, J.; Sun, Q.; Ye, Z. Design—Construction Phase Safety Risk Analysis of Assembled Buildings. Buildings 2023, 13, 949. [Google Scholar] [CrossRef]
  84. Wang, J.; Guo, F.; Song, Y.; Liu, Y.; Hu, X.; Yuan, C. Safety Risk Assessment of Prefabricated Buildings Hoisting Construction: Based on IHFACS-ISAM-BN. Buildings 2022, 12, 811. [Google Scholar] [CrossRef]
  85. Liu, J.; Gong, E.; Wang, D.; Teng, Y. Cloud Model-Based Safety Performance Evaluation of Prefabricated Building Project in China. Wirel. Pers. Commun. 2018, 102, 3021–3039. [Google Scholar] [CrossRef]
  86. Xia, N.; Zou, P.X.W.; Liu, X.; Wang, X.; Zhu, R. A Hybrid BN-HFACS Model for Predicting Safety Performance in Construction Projects. Saf. Sci. 2018, 101, 332–343. [Google Scholar] [CrossRef]
  87. Pervez, H.; Ali, Y.; Pamucar, D.; Garai-Fodor, M.; Csiszárik-Kocsir, Á. Evaluation of Critical Risk Factors in the Implementation of Modular Construction. PLoS ONE 2022, 17, e0272448. [Google Scholar] [CrossRef]
  88. Yuan, M.; Li, Z.; Li, X.; Luo, X. Managing Stakeholder-Associated Risks and Their Interactions in the Life Cycle of Prefabricated Building Projects: A Social Network Analysis Approach. J. Clean. Prod. 2021, 323, 129102. [Google Scholar] [CrossRef]
  89. Abdul Nabi, M.; El-adaway, I.H. Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects. J. Manag. Eng. 2021, 37, 04021023. [Google Scholar] [CrossRef]
  90. Wang, Q.; Gong, Z.; Liu, C. Risk Network Evaluation of Prefabricated Building Projects in Underdeveloped Areas: A Case Study in Qinghai. Sustainability 2022, 14, 6335. [Google Scholar] [CrossRef]
  91. Shen, Y.; Xu, M.; Lin, Y.; Cui, C.; Shi, X.; Liu, Y. Safety Risk Management of Prefabricated Building Construction Based on Ontology Technology in the BIM Environment. Buildings 2022, 12, 765. [Google Scholar] [CrossRef]
  92. Chatzimichailidou, M.; Ma, Y. Using BIM in the Safety Risk Management of Modular Construction. Saf. Sci. 2022, 154, 105852. [Google Scholar] [CrossRef]
  93. Li, Y.; Wang, T.; Han, Z.; Wang, W.; Huang, J. A Quantitative Method for Assessing and Monetizing the Failure Risk of Prefabricated Building Structures under Seismic Effect. Buildings 2022, 12, 2221. [Google Scholar] [CrossRef]
  94. Darko, A.; Chan, A.P.C.; Yang, Y.; Tetteh, M.O. Building Information Modeling (BIM)-Based Modular Integrated Construction Risk Management—Critical Survey and Future Needs. Comput. Ind. 2020, 123, 103327. [Google Scholar] [CrossRef]
  95. Zhu, T.; Liu, G. A Novel Hybrid Methodology to Study the Risk Management of Prefabricated Building Supply Chains: An Outlook for Sustainability. Sustainability 2022, 15, 361. [Google Scholar] [CrossRef]
  96. Chang, C.; Wu, X.; Yan, X. Multiobjective Optimization of Safety Risk of Prefabricated Building Construction Considering Risk Correlation. Math. Probl. Eng. 2020, 2020, 3923486. [Google Scholar] [CrossRef]
  97. Enshassi, M.S.A.; Walbridge, S.; West, J.S.; Haas, C.T. Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects. J. Manag. Eng. 2019, 35, 05019004. [Google Scholar] [CrossRef]
  98. Tam, V.W.Y.; Fung, I.W.H. Tower Crane Safety in the Construction Industry: A Hong Kong Study. Saf. Sci. 2011, 49, 208–215. [Google Scholar] [CrossRef]
  99. Shin, I.J. Factors That Affect Safety of Tower Crane Installation/Dismantling in Construction Industry. Saf. Sci. 2015, 72, 379–390. [Google Scholar] [CrossRef]
  100. Liu, Z.; Meng, X.; Xing, Z.; Jiang, A. Digital Twin-Based Safety Risk Coupling of Prefabricated Building Hoisting. Sensors 2021, 21, 3583. [Google Scholar] [CrossRef]
  101. Zhou, W.; Zhao, T.; Liu, W.; Tang, J. Tower Crane Safety on Construction Sites: A Complex Sociotechnical System Perspective. Saf. Sci. 2018, 109, 95–108. [Google Scholar] [CrossRef]
  102. Wang, T.; Gao, S.; Li, X.; Ning, X. A Meta-Network-Based Risk Evaluation and Control Method for Industrialized Building Construction Projects. J. Clean. Prod. 2018, 205, 552–564. [Google Scholar] [CrossRef]
  103. Wuni, I.Y.; Shen, G.Q.; Saka, A.B. Computing the Severities of Critical Onsite Assembly Risk Factors for Modular Integrated Construction Projects. Eng. Constr. Archit. Manag. 2023, 30, 1864–1882. [Google Scholar] [CrossRef]
  104. Guo, J. Research on Safety Risk Assessment Model of Prefabricated Concrete Building Construction. Int. J. Crit. Infrastruct. 2022, 18, 197. [Google Scholar] [CrossRef]
  105. Shahtaheri, Y.; Rausch, C.; West, J.; Haas, C.; Nahangi, M. Managing Risk in Modular Construction Using Dimensional and Geometric Tolerance Strategies. Autom. Constr. 2017, 83, 303–315. [Google Scholar] [CrossRef]
  106. Wuni, I.Y.; Shen, G.Q.; Osei-Kyei, R.; Agyeman-Yeboah, S. Modelling the Critical Risk Factors for Modular Integrated Construction Projects. Int. J. Constr. Manag. 2020, 22, 2013–2026. [Google Scholar] [CrossRef]
  107. Li, H.X.; Al-Hussein, M.; Lei, Z.; Ajweh, Z. Risk Identification and Assessment of Modular Construction Utilizing Fuzzy Analytic Hierarchy Process (AHP) and Simulation. Can. J. Civ. Eng. 2013, 40, 1184–1195. [Google Scholar] [CrossRef]
  108. Li, X.; Wang, C.; Kassem, M.A.; Alhajlah, H.H.; Bimenyimana, S. Evaluation Method for Quality Risks of Safety in Prefabricated Building Construction Using SEM–SDM Approach. Int. J. Environ. Res. Public Health 2022, 19, 5180. [Google Scholar] [CrossRef]
  109. Jiang, W.; Ding, L.; Zhou, C. Digital Twin: Stability Analysis for Tower Crane Hoisting Safety with a Scale Model. Autom. Constr. 2022, 138, 104257. [Google Scholar] [CrossRef]
  110. Bai, X.; Sun, L.; Sun, H. Risk Assessment of Hoisting Aboard and Installation for Offshore Wind Turbine. In Proceedings of the American Society of Mechanical Engineers, Rio de Janeiro, Brazil, 1–6 July 2012; American Society of Mechanical Engineers: New York, NY, USA, 2012; pp. 107–114. [Google Scholar] [CrossRef]
  111. Aminbakhsh, S.; Gunduz, M.; Sonmez, R. Safety Risk Assessment Using Analytic Hierarchy Process (AHP) during Planning and Budgeting of Construction Projects. J. Saf. Res. 2013, 46, 99–105. [Google Scholar] [CrossRef]
  112. Xia, M.; Zhao, L.; Zhao, L. A Comprehensive Risk-Assessment Method for Prefabricated Buildings Using EPC: A Case Study from China. Sustainability 2022, 14, 1910. [Google Scholar] [CrossRef]
  113. Leu, S.-S.; Chang, C.-M. Bayesian-Network-Based Fall Risk Evaluation of Steel Construction Projects by Fault Tree Transformation. J. Civ. Eng. Manag. 2015, 21, 334–342. [Google Scholar] [CrossRef]
  114. Leu, S.-S.; Chang, C.-M. Bayesian-Network-Based Safety Risk Assessment for Steel Construction Projects. Accid. Anal. Prev. 2013, 54, 122–133. [Google Scholar] [CrossRef]
  115. Bao, X. Grey Clustering Evaluation of Prefabricated Building Construction Safety Based on Anp. J. Phys. Conf. Ser. 2022, 2202, 012031. [Google Scholar] [CrossRef]
  116. Luo, Z.; Guo, J.; Han, J.; Wang, Y. Research on the Construction Safety Risk Assessment of Prefabricated Subway Stations in China. Eng. Constr. Archit. Manag. 2022; ahead-of-print. [Google Scholar] [CrossRef]
  117. Ling, S.; Yewen, T.; Yue, M. Safety Assessment of Component Hoisting for Prefabricated Residence Based on Cloud-BN Model. China Saf. Sci. J. 2019, 29, 147. [Google Scholar] [CrossRef]
  118. Ismail, F.; Muhamad, R. Risk Assessment of Tower Crane Operation in High Rise Construction. J. Adv. Res. Occup. Saf. Health 2018, 1, 32–38. Available online: http://eprints.utm.my/id/eprint/81989/1/FaizIsmail2018_RiskAssessmentofTowerCraneOperation.pdf (accessed on 1 June 2023).
  119. Wang, F.; Zhang, J.; Liang, X.; Hu, K.; Zhang, J. Elevator Safety Risk and Countermeasures Based on FTA-TFN. Appl. Math. Inf. Sci. 2014, 8, 1741–1748. [Google Scholar] [CrossRef]
  120. Zhang, L.; Wu, X.; Skibniewski, M.J.; Zhong, J.; Lu, Y. Bayesian-Network-Based Safety Risk Analysis in Construction Projects. Reliab. Eng. Syst. Saf. 2014, 131, 29–39. [Google Scholar] [CrossRef]
  121. Ji, C.; Su, X.; Qin, Z.; Nawaz, A. Probability Analysis of Construction Risk Based on Noisy-or Gate Bayesian Networks. Reliab. Eng. Syst. Saf. 2022, 217, 107974. [Google Scholar] [CrossRef]
  122. Lin, S.-S.; Shen, S.-L.; Zhou, A.; Xu, Y.-S. Risk Assessment and Management of Excavation System Based on Fuzzy Set Theory and Machine Learning Methods. Autom. Constr. 2021, 122, 103490. [Google Scholar] [CrossRef]
  123. Wang, Z.Z.; Chen, C. Fuzzy Comprehensive Bayesian Network-Based Safety Risk Assessment for Metro Construction Projects. Tunn. Undergr. Space Technol. 2017, 70, 330–342. [Google Scholar] [CrossRef]
  124. Wu, W.-S.; Yang, C.-F.; Chang, J.-C.; Château, P.-A.; Chang, Y.-C. Risk Assessment by Integrating Interpretive Structural Modeling and Bayesian Network, Case of Offshore Pipeline Project. Reliab. Eng. Syst. Saf. 2015, 142, 515–524. [Google Scholar] [CrossRef]
  125. Zou, J.; Han, Y.; So, S.-S. Overview of Artificial Neural Networks. Methods Mol. Biol. 2008, 458, 14–22. [Google Scholar] [CrossRef]
  126. Krogh, A. What are artificial neural networks? Nat. Biotechnol. 2008, 26, 195–197. [Google Scholar] [CrossRef]
  127. Jain, A.K.; Mao, J.; Mohiuddin, K.M. Artificial Neural Networks: A Tutorial. Computer 1996, 29, 31–44. [Google Scholar] [CrossRef] [Green Version]
  128. Allam, Z. Achieving Neuroplasticity in Artificial Neural Networks through Smart Cities. Smart Cities 2019, 2, 118–134. [Google Scholar] [CrossRef] [Green Version]
  129. Mishra, M.; Srivastava, M. A View of Artificial Neural Network. In Proceedings of the 2014 International Conference on Advances in Engineering & Technology Research (ICAETR—2014), Unnao, Kanpur, India, 1–2 August 2014; pp. 1–3. [Google Scholar] [CrossRef]
  130. Zhang, Z. Artificial Neural Network. In Multivariate Time Series Analysis in Climate and Environmental Research; Springer: Berlin/Heidelberg, Germany, 2017; pp. 1–35. [Google Scholar]
  131. Nabawy, M.; Gouda Mohamed, A. Risks Assessment in the Construction of Infrastructure Projects Using Artificial Neural Networks. Int. J. Constr. Manag. 2022, 1–13. [Google Scholar] [CrossRef]
  132. Wu, Y.; Feng, J. Development and Application of Artificial Neural Network. Wirel. Pers. Commun. 2017, 102, 1645–1656. [Google Scholar] [CrossRef]
  133. Jin, X.-H.; Zhang, G. Modelling Optimal Risk Allocation in PPP Projects Using Artificial Neural Networks. Int. J. Proj. Manag. 2011, 29, 591–603. [Google Scholar] [CrossRef]
  134. Changwei, Y.; Zonghao, L.; Xueyan, G.; Wenying, Y.; Jing, J.; Liang, Z. Application of BP Neural Network Model in Risk Evaluation of Railway Construction. Complexity 2019, 2019, 2946158. [Google Scholar] [CrossRef] [Green Version]
  135. Deng, X.; Xu, T.; Wang, R. Risk Evaluation Model of Highway Tunnel Portal Construction Based on BP Fuzzy Neural Network. Comput. Intell. Neurosci. 2018, 2018, e8547313. [Google Scholar] [CrossRef] [Green Version]
  136. Meža, S.; Mauko Pranjić, A.; Vezočnik, R.; Osmokrović, I.; Lenart, S. Digital Twins and Road Construction Using Secondary Raw Materials. J. Adv. Transp. 2021, 2021, 8833058. [Google Scholar] [CrossRef]
  137. Tao, F.; Qi, Q. Make More Digital Twins. Nature 2019, 573, 490–491. [Google Scholar] [CrossRef] [PubMed] [Green Version]
  138. Tao, F.; Zhang, H.; Liu, A.; Nee, A.Y.C. Digital Twin in Industry: State-of-The-Art. IEEE Trans. Ind. Inform. 2019, 15, 2405–2415. [Google Scholar] [CrossRef]
  139. Akanmu, A.A.; Anumba, C.J.; Ogunseiju, O.O. Towards next Generation Cyber-Physical Systems and Digital Twins for Construction. J. Inf. Technol. Constr. 2021, 26, 505–525. [Google Scholar] [CrossRef]
  140. Boje, C.; Guerriero, A.; Kubicki, S.; Rezgui, Y. Towards a Semantic Construction Digital Twin: Directions for Future Research. Autom. Constr. 2020, 114, 103179. [Google Scholar] [CrossRef]
  141. Zhao, Y.; Cao, C.; Liu, Z. A Framework for Prefabricated Component Hoisting Management Systems Based on Digital Twin Technology. Buildings 2022, 12, 276. [Google Scholar] [CrossRef]
  142. Kor, M.; Yitmen, I.; Alizadehsalehi, S. An Investigation for Integration of Deep Learning and Digital Twins towards Construction 4.0. Smart Sustain. Built Environ. 2022, 12, 461–487. [Google Scholar] [CrossRef]
  143. Teisserenc, B.; Sepasgozar, S. Project Data Categorization, Adoption Factors, and Non-Functional Requirements for Blockchain Based Digital Twins in the Construction Industry 4.0. Buildings 2021, 11, 626. [Google Scholar] [CrossRef]
  144. Zhang, W.; Zhu, S.; Zhang, X.; Zhao, T. Identification of Critical Causes of Construction Accidents in China Using a Model Based on System Thinking and Case Analysis. Saf. Sci. 2019, 121, 606–618. [Google Scholar] [CrossRef]
  145. Xu, N.; Ma, L.; Liu, Q.; Wang, L.; Deng, Y. An Improved Text Mining Approach to Extract Safety Risk Factors from Construction Accident Reports. Saf. Sci. 2021, 138, 105216. [Google Scholar] [CrossRef]
  146. Xu, Q.; Xu, K. Analysis of the Characteristics of Fatal Accidents in the Construction Industry in China Based on Statistical Data. Int. J. Environ. Res. Public Health 2021, 18, 2162. [Google Scholar] [CrossRef]
  147. Ayhan, B.U.; Tokdemir, O.B. Accident Analysis for Construction Safety Using Latent Class Clustering and Artificial Neural Networks. J. Constr. Eng. Manag. 2020, 146, 04019114. [Google Scholar] [CrossRef]
  148. Boateng, E.B.; Pillay, M.; Davis, P.G. Predicting the Level of Safety Performance Using an Artificial Neural Network. In Human Systems Engineering and Design, Proceedings of the 1st International Conference on Human Systems Engineering and Design (IHSED2018): Future Trends and Applications, Reims, France, 25–27 October 2018; Springer International Publishing: Cham, Switzerland, 2018; pp. 705–710. [Google Scholar] [CrossRef]
  149. Bai, L.; Wang, Z.; Wang, H.; Huang, N.; Shi, H. Prediction of Multiproject Resource Conflict Risk via an Artificial Neural Network. Eng. Constr. Archit. Manag. 2020, 28, 2857–2883. [Google Scholar] [CrossRef]
  150. Mocanu, D.C.; Mocanu, E.; Stone, P.; Nguyen, P.H.; Gibescu, M.; Liotta, A. Scalable Training of Artificial Neural Networks with Adaptive Sparse Connectivity Inspired by Network Science. Nat. Commun. 2018, 9, 2383. [Google Scholar] [CrossRef] [Green Version]
  151. Tu, J.V. Advantages and Disadvantages of Using Artificial Neural Networks versus Logistic Regression for Predicting Medical Outcomes. J. Clin. Epidemiol. 1996, 49, 1225–1231. [Google Scholar] [CrossRef]
  152. Kolehmainen, M.; Martikainen, H.; Ruuskanen, J. Neural Networks and Periodic Components Used in Air Quality Forecasting. Atmos. Environ. 2001, 35, 815–825. [Google Scholar] [CrossRef]
  153. Szoplik, J. Forecasting of Natural Gas Consumption with Artificial Neural Networks. Energy 2015, 85, 208–220. [Google Scholar] [CrossRef]
  154. Bansal, Y.; Advani, M.; Cox, D.G.; Saxe, A.M. Minnorm Training: An Algorithm for Training Over-Parameterized Deep Neural Networks. arXiv 2018, arXiv:1806.00730. [Google Scholar]
  155. Stringer, C.; Pachitariu, M.; Steinmetz, N.; Carandini, M.; Harris, K.D. High-Dimensional Geometry of Population Responses in Visual Cortex. Nature 2019, 571, 361–365. [Google Scholar] [CrossRef]
  156. Gao, P.; Trautmann, E.; Yu, B.X.; Santhanam, G.; Ryu, S.; Shenoy, K.V.; Ganguli, S.N. A Theory of Multineuronal Dimensionality, Dynamics and Measurement. Biorxiv 2017. [Google Scholar] [CrossRef] [Green Version]
  157. Hasson, U.; Nastase, S.A.; Goldstein, A. Direct Fit to Nature: An Evolutionary Perspective on Biological and Artificial Neural Networks. Neuron 2020, 105, 416–434. [Google Scholar] [CrossRef]
  158. Raghu, M.; Poole, B.; Kleinberg, J.; Ganguli, S.; Sohl-Dickstein, J. On the Expressive Power of Deep Neural Networks. In Proceedings of the the 34th International Conference on Machine Learning, Sydney, Australia, 6–11 August 2017; Volume 70, pp. 2847–2854. [Google Scholar]
  159. Wan, L.; Zeiler, M.; Zhang, S.; Le Cun, Y.; Fergus, R. Regularization of Neural Networks Using DropConnect. In Proceedings of the 30th International Conference on Machine Learning, Atlanta, GA, USA, 16–21 June 2013; Volume 28, pp. 1058–1066. [Google Scholar]
  160. Barron, A.R. Complexity Regularization with Application to Artificial Neural Networks. Nonparametric Funct. Estim. Relat. Top. 1991, 335, 561–576. [Google Scholar] [CrossRef]
  161. Girosi, F.; Jones, M.; Poggio, T. Regularization Theory and Neural Networks Architectures. Neural Comput. 1995, 7, 219–269. [Google Scholar] [CrossRef]
  162. Di Franco, G.; Santurro, M. Machine Learning, Artificial Neural Networks and Social Research. Qual. Quant. 2020, 55, 1007–1025. [Google Scholar] [CrossRef]
  163. Shahmansouri, A.A.; Yazdani, M.; Ghanbari, S.; Akbarzadeh Bengar, H.; Jafari, A.; Farrokh Ghatte, H. Artificial Neural Network Model to Predict the Compressive Strength of Eco-Friendly Geopolymer Concrete Incorporating Silica Fume and Natural Zeolite. J. Clean. Prod. 2021, 279, 123697. [Google Scholar] [CrossRef]
  164. Singh, K.P.; Basant, A.; Malik, A.; Jain, G. Artificial Neural Network Modeling of the River Water Quality—A Case Study. Ecol. Model. 2009, 220, 888–895. [Google Scholar] [CrossRef]
  165. Kritzinger, W.; Karner, M.; Traar, G.; Henjes, J.; Sihn, W. Digital Twin in Manufacturing: A Categorical Literature Review and Classification. IFAC-Pap. 2018, 51, 1016–1022. [Google Scholar] [CrossRef]
  166. Zhou, Y.; Wei, X.; Peng, Y. The Modelling of Digital Twins Technology in the Construction Process of Prefabricated Buildings. Adv. Civ. Eng. 2021, 2021, 2801557. [Google Scholar] [CrossRef]
  167. Madubuike, O.C.; Anumba, C.J.; Khallaf, R. A Review of Digital Twin Applications in Construction. J. Inf. Technol. Constr. 2022, 27, 145–172. [Google Scholar] [CrossRef]
  168. Salem, T.; Dragomir, M. Options for and Challenges of Employing Digital Twins in Construction Management. Appl. Sci. 2022, 12, 2928. [Google Scholar] [CrossRef]
  169. Sun, H.; Liu, Z. Research on Intelligent Dispatching System Management Platform for Construction Projects Based on Digital Twin and BIM Technology. Adv. Civ. Eng. 2022, 2022, 8273451. [Google Scholar] [CrossRef]
  170. Wu, Z.; Chang, Y.; Li, Q.; Cai, R. A Novel Method for Tunnel Digital Twin Construction and Virtual-Real Fusion Application. Electronics 2022, 11, 1413. [Google Scholar] [CrossRef]
  171. Niederer, S.A.; Sacks, M.S.; Girolami, M.; Willcox, K. Scaling Digital Twins from the Artisanal to the Industrial. Nat. Comput. Sci. 2021, 1, 313–320. [Google Scholar] [CrossRef]
  172. Adamenko, D.; Kunnen, S.; Nagarajah, A. Comparative Analysis of Platforms for Designing a Digital Twin. In Advances in Design, Simulation and Manufacturing III; Springer: Berlin/Heidelberg, Germany, 2020; pp. 3–12. [Google Scholar] [CrossRef]
  173. Far, S.B.; Rad, A.I. Applying Digital Twins in Metaverse: User Interface, Security and Privacy Challenges. J. Metaverse 2022, 2, 8–15. [Google Scholar]
  174. Kapteyn, M.G.; Pretorius, J.V.R.; Willcox, K.E. A Probabilistic Graphical Model Foundation for Enabling Predictive Digital Twins at Scale. Nat. Comput. Sci. 2021, 1, 337–347. [Google Scholar] [CrossRef]
  175. Hou, L.; Wu, S.; Zhang, G.; Tan, Y.; Wang, X. Literature Review of Digital Twins Applications in Construction Workforce Safety. Appl. Sci. 2020, 11, 339. [Google Scholar] [CrossRef]
  176. Blair, G.S. Digital Twins of the Natural Environment. Patterns 2021, 2, 100359. [Google Scholar] [CrossRef]
  177. Rafsanjani, H.N.; Nabizadeh, A.H. Towards Digital Architecture, Engineering, and Construction (AEC) Industry through Virtual Design and Construction (VDC) and Digital Twin. Energy Built Environ. 2021, 4, 169–178. [Google Scholar] [CrossRef]
  178. Al-Sehrawy, R.; Kumar, B. Digital Twins in Architecture, Engineering, Construction and Operations. A Brief Review and Analysis. Lect. Notes Civ. Eng. 2020, 98, 924–939. [Google Scholar] [CrossRef]
  179. Odeyinka, H.; Lowe, J.; Kaka, A. Regression Modelling of Risk Impacts on Construction Cost Flow Forecast. J. Financ. Manag. Prop. Constr. 2012, 17, 203–221. [Google Scholar] [CrossRef] [Green Version]
  180. Soltanzadeh, A.; Mohammadfam, I.; Moghimbeigi, A.; Ghiasvand, R. Key Factors Contributing to Accident Severity Rate in Construction Industry in Iran: A Regression Modelling Approach/Primjena Regresijskog Modela U Analizi Ključnih Čimbenika Koji Pridonose Težini Nesreća U Građevinskoj Industriji U Iranu. Arch. Ind. Hyg. Toxicol. 2016, 67, 47–53. [Google Scholar] [CrossRef] [Green Version]
  181. Kumari, K.; Yadav, S. Linear Regression Analysis Study. J. Pract. Cardiovasc. Sci. 2018, 4, 33–36. [Google Scholar] [CrossRef]
  182. Westreich, D.; Lessler, J.; Funk, M.J. Propensity Score Estimation: Neural Networks, Support Vector Machines, Decision Trees (CART), and Meta-Classifiers as Alternatives to Logistic Regression. J. Clin. Epidemiol. 2010, 63, 826–833. [Google Scholar] [CrossRef] [Green Version]
  183. Akboğa Kale, Ö.; Baradan, S. Identifying Factors That Contribute to Severity of Construction Injuries Using Logistic Regression Model. Teknik Dergi 2020, 31, 9919–9940. [Google Scholar] [CrossRef] [Green Version]
  184. Dey, P.K. Project Risk Management Using Multiple Criteria Decision-Making Technique and Decision Tree Analysis: A Case Study of Indian Oil Refinery. Prod. Plan. Control 2011, 23, 903–921. [Google Scholar] [CrossRef]
  185. Bengio, Y.; Delalleau, O.; Simard, C. Decision Trees do not Generalize to New Variations. Comput. Intell. 2010, 26, 449–467. [Google Scholar] [CrossRef]
  186. Zorman, M.; Štiglic, M.M.; Kokol, P.; Malčić, I. Journal of Medical Systems. J. Med. Syst. 1997, 21, 403–415. [Google Scholar] [CrossRef] [PubMed]
  187. Ziegler, A.; König, I.R. Mining Data with Random Forests: Current Options for Real-World Applications. Wiley Interdiscip. Rev. Data Min. Knowl. Discov. 2013, 4, 55–63. [Google Scholar] [CrossRef]
  188. Masarat, S.; Sharifian, S.; Taheri, H. Modified Parallel Random Forest for Intrusion Detection Systems. J. Supercomput. 2016, 72, 2235–2258. [Google Scholar] [CrossRef]
  189. Karamizadeh, S.; Abdullah, S.M.; Halimi, M.; Shayan, J.; Rajabi, M.J. Advantage and Drawback of Support Vector Machine Functionality. In Proceedings of the 2014 International Conference on Computer, Communications, and Control Technology (I4CT), Langkawi, Malaysia, 2–4 September 2014; pp. 63–65. [Google Scholar] [CrossRef]
  190. Anguita, D.; Ghio, A.; Greco, N.; Oneto, L.; Ridella, S. Model Selection for Support Vector Machines: Advantages and Disadvantages of the Machine Learning Theory. Available online: https://ieeexplore.ieee.org/abstract/document/5596450 (accessed on 1 June 2023).
  191. Auria, L.; Moro, R.A. Support Vector Machines (SVM) as a Technique for Solvency Analysis. SSRN Electron. J. 2008, 1, 811. [Google Scholar] [CrossRef] [Green Version]
  192. Aldayel, M. K-Nearest Neighbor Classification for Glass Identification Problem. In Proceedings of the 2012 International Conference on Computer Systems and Industrial Informatics, Sharjah, United Arab Emirates, 8–20 December 2012; pp. 1–5. [Google Scholar] [CrossRef]
  193. Gallego, A.-J.; Calvo-Zaragoza, J.; Rico-Juan, J.R. Insights into Efficient K-Nearest Neighbor Classification with Convolutional Neural Codes. IEEE Access 2020, 8, 99312–99326. [Google Scholar] [CrossRef]
  194. Tran, H.Q.; Ha, C. High Precision Weighted Optimum K-Nearest Neighbors Algorithm for Indoor Visible Light Positioning Applications. IEEE Access 2020, 8, 114597–114607. [Google Scholar] [CrossRef]
  195. Atabay, H.A.; Sheikhzadeh, M.J.; Torshizi, M. A Clustering Algorithm Based on Integration of K-Means and PSO. In Proceedings of the 2016 1st Conference on Swarm Intelligence and Evolutionary Computation (CSIEC), Bam, Iran, 9–11 March 2016; pp. 59–63. [Google Scholar] [CrossRef]
  196. Zhu, J.; Wang, H. An Improved K-Means Clustering Algorithm. In Proceedings of the 2010 2nd IEEE International Conference on Information Management and Engineering, Chengdu, China, 16–18 April 2010; pp. 190–192. [Google Scholar] [CrossRef]
  197. Yuan, C.; Yang, H. Research on K-Value Selection Method of K-Means Clustering Algorithm. J 2019, 2, 226–235. [Google Scholar] [CrossRef] [Green Version]
  198. Li, L.; Liu, S.; Peng, Y.; Sun, Z. Overview of Principal Component Analysis Algorithm. Opt. Int. J. Light Electron Opt. 2016, 9, 3935–3944. [Google Scholar] [CrossRef]
  199. Karamizadeh, S.; Abdullah, S.M.; Manaf, A.A.; Zamani, M.; Hooman, A. An Overview of Principal Component Analysis. J. Signal Inf. Process. 2013, 04, 173–175. [Google Scholar] [CrossRef] [Green Version]
  200. Nguyen-Sy, T.; Wakim, J.; To, Q.-D.; Vu, M.-N.; Nguyen, T.-D.; Nguyen, T.-T. Predicting the Compressive Strength of Concrete from Its Compositions and Age Using the Extreme Gradient Boosting Method. Constr. Build. Mater. 2020, 260, 119757. [Google Scholar] [CrossRef]
  201. Friedman, J.H. Greedy Function Approximation: A Gradient Boosting Machine. Ann. Stat. 2001, 29, 1189–1232. [Google Scholar] [CrossRef]
  202. Zhang, Y.; Haghani, A. A Gradient Boosting Method to Improve Travel Time Prediction. Transp. Res. Part C Emerg. Technol. 2015, 58, 308–324. [Google Scholar] [CrossRef]
  203. Kamilaris, A.; Prenafeta-Boldú, F.X. A Review of the Use of Convolutional Neural Networks in Agriculture. J. Agric. Sci. 2018, 156, 312–322. [Google Scholar] [CrossRef] [Green Version]
  204. Jogin, M.; Mohana; Madhulika, M.S.; Divya, G.D.; Meghana, R.K.; Apoorva, S. Feature Extraction Using Convolution Neural Networks (CNN) and Deep Learning. Available online: https://ieeexplore.ieee.org/document/9012507 (accessed on 1 June 2023).
  205. Yao, X.; Wang, X.; Wang, S.-H.; Zhang, Y.-D. A Comprehensive Survey on Convolutional Neural Network in Medical Image Analysis. Multimed. Tools Appl. 2020, 81, 41361–41405. [Google Scholar] [CrossRef]
Figure 1. Research framework.
Figure 1. Research framework.
Buildings 13 01853 g001
Figure 2. PRISMA literature collection procedure.
Figure 2. PRISMA literature collection procedure.
Buildings 13 01853 g002
Figure 3. The number of annual publications.
Figure 3. The number of annual publications.
Buildings 13 01853 g003
Figure 4. The value of MeanTCperYear.
Figure 4. The value of MeanTCperYear.
Buildings 13 01853 g004
Figure 5. Country cooperation map.
Figure 5. Country cooperation map.
Buildings 13 01853 g005
Figure 6. Network of co-authors.
Figure 6. Network of co-authors.
Buildings 13 01853 g006
Figure 7. Historiography of authors.
Figure 7. Historiography of authors.
Buildings 13 01853 g007
Figure 8. Topic trends.
Figure 8. Topic trends.
Buildings 13 01853 g008
Figure 9. Structure of feed-forward artificial neural network.
Figure 9. Structure of feed-forward artificial neural network.
Buildings 13 01853 g009
Figure 10. Hoisting risk assessment model based on DT and ANN.
Figure 10. Hoisting risk assessment model based on DT and ANN.
Buildings 13 01853 g010
Table 1. Top 10 main sources.
Table 1. Top 10 main sources.
SourcesArticles
Applied Ergonomics35
Safety Science22
Sensors9
International Journal of Occupational Safety and Ergonomics7
Journal of Biomechanics5
Journal of Construction Engineering and Management5
Mathematical Problems in Engineering4
Safety and Health at Work4
Automation in Construction3
IEEE Transactions on Human-Machine Systems3
Table 2. Top 10 institutions and authors of publications.
Table 2. Top 10 institutions and authors of publications.
InstitutionNumberAuthorNumber
Vanderbilt University11Arjmand, N.5
Hong Kong Polytechnic University6Liu, Z.5
Southwest Petroleum University6Aneziris, ON.4
Shanghai Jiao Tong University5Li, L.4
Sharif University of Technology5Lu, ML.4
University of Belgrade5Papazoglou, IA.4
Beijing University of Technology4Shirazi-Adl, A.4
Purdue University4Bloswick, DS.3
University of Alberta4Drinkaus, P.3
Universiti Sains Malaysia4Gallagher, S.3
Table 3. The summary of hoisting risk factors.
Table 3. The summary of hoisting risk factors.
ClassificationNo.Risk FactorsReference
HumanH1Crane drivers and signalers need to be qualified to perform specific trades.[16,21,83,84,85,86,87,88,89]
H2The safety awareness of crane erection and dismantling workers, drivers, and ground workers were not strong.
H3Inadequate safety supervision of crane operations by the contractor.
H4Safety checks on cranes by maintenance staff and drivers needed to be more thorough.
H5Workers continued to work when the crane’s position did not match the scope of work.
H6The physical condition of the crane driver and ground workers.
H7The psychological stress of crane drivers and ground workers is brought on by the construction schedule.
H8Lack of skills practice for crane drivers and ground workers.
H9Poor communication between crane drivers and ground workers.
H10Workers are moving or staying within the hoisting area.
H11Simultaneous multi-tasking of crane drivers and ground workers.
H12Low level of site coordination management.
H13Workers operating against work regulations.
H14Workers ignore the impact of their surroundings on the work.
H15Lack of coordination between work types on site.
H16Inadequate emergency response capability of operators.
ManagementMA1Inadequate technical safety standards for hoisting construction.[25,83,90,91,92,93,94,95]
MA2Inadequate management methods for special operators.
MA3Lack of registration management and inspection of cranes.
MA4Inadequate safety program for the assembly, operation, and separation of cranes.
MA5Unreasonable construction schedule.
MA6Lack of safety education and training.
MA7Authorization of tower cranes for additional services.
MA8Inadequate site supervision staffing.
MA9The proportion of personnel participating in safety exits.
MA10Unreasonable or no specific lifting plan for hoisting operations.
MA11No safety inspection on entry of materials and machinery.
MA12No regular safety checks and maintenance.
MA13Inadequate disclosure of safety techniques.
MA14Insufficient financial investment in safety measures.
MA15Unreasonable location of lifting points.
MA16Inadequate safety monitoring techniques for time-varying structures.
MA17Inadequate safety accident prevention and emergency response measures.
MA18Inadequate protective measures around work at height.
MA19Inadequate safety storage measures for flammable and explosive materials.
MA20Security measures fee as a percentage of investment.
EquipmentEQ1Safety defects in imported tower cranes, spreaders, slings, baskets, and hoists.[55,76,83,85,96,97,98,99,100,101]
EQ2No safety protection measures, e.g., scaffolding, slings, and locks.
EQ3The tower crane hook visualization system is not in use.
EQ4Safety load indicators and graphic displays of crane operation were not used.
EQ5Safety monitoring system for collision avoidance on tower cranes not used.
EQ6Height of the tower crane.
EQ7Lifting of prefabricated elements without the use of special spreaders and slings.
EQ8The strength of lifting connections needed to be revised.
EQ9Actual load factor.
EQ10Sling angle/°.
EQ11The wear rate of lifting equipment.
EQ12Lifting speed.
EQ13Lifting acceleration.
EQ14Overloading of cranes.
EQ15Long-term operation of equipment leading to the deterioration of parts.
EQ16The failure rate of lifting machinery.
EQ17Inadequate stability of temporary support systems.
EQ18Type of crane machinery.
EQ19The life cycle of cranes.
EQ20Cranes’ movement devices.
MaterialsMA1Quality changes in precast components due to groundwater on construction sites.[83,84,102,103,104,105,106]
MA2Design and production quality of precast elements.
MA3Strength of precast elements.
MA4Component weight.
MA5Types of components.
MA6Component materials.
MA7Dimensions of prefabricated elements.
MA8Substandard materials and fittings are used for the installation of the elements.
MA9Unreasonable attachments.
EnvironmentEN1Lack of warning signs for isolated areas for tower crane installation, dismantling, and lifting.[17,22,25,83,96,107,108,109,110]
EN2Poor ground conditions at the construction site.
EN3Poor visibility of the construction site.
EN4Cross-operation of multiple tower cranes.
EN5Wind speed.
EN6Adverse weather conditions.
EN7Inadequate attention to the treatment of surface water.
EN8Inadequate stacking and protection of prefabricated elements.
EN9Unreasonable transport routes on site.
EN10Limited space for cranes.
EN11Inadequate protection of openings and edges.
EN12Work platforms for operators are not operable.
EN13The safe atmosphere on site.
EN14Dangerous sources, such as live high-voltage power lines and underground gas pipes around the construction site.
EN15Relative rate of corrosion.
Table 4. The summary of assessment methods for 23 critical articles.
Table 4. The summary of assessment methods for 23 critical articles.
SourceMethodologyFrameworkContributionLimitations
[55]Analysis of hierarchy process (AHP); time-varying functionSafety, applicability, and durabilityThis evaluation method was the overall safety evaluation of hydraulic structures providing a reference basis.Subjectivity and bias; the relationship between factors not considered.
[84]Similarity aggregation method (SAM); Bayesian networks (BN)Human factors analysis and classification system (HFACS)The project’s overall safety risk probability level is obtained through the forward reasoning of BN. The key risk factors of the project are identified through reverse logic.Subjectivity and bias; incomplete risk factors.
[16]Two additive Choquet integral (TACI); decision-making trial and evaluation laboratory (DEMATEL)Wuli–Shili–Renli (WSR) systemA two-stage model for evaluating risk probabilities considering multiple correlations and dynamic stochasticity is constructed from the perspective of the evolutionary mechanism of multiple correlations.Subjectivity and bias.
[24]Fault tree analysis (FTA); BP neural network improved by genetic algorithm; Elman neural networkHuman–environmentInforming the application of neural networks in security assessment.Need more systematic, self-correcting indicators; need more statistical data.
[22]Decision experimentation and evaluation laboratory (DEMATEL) and interpretative structural modelling (ISM); Bayesian Networks (BN)Human–equipment–components–management–environmentReal-time information interaction and risk correlation.Limited training sample sets; lack of intelligent decision-making systems to support lifting safety risk control. Not available for risk prediction.
[4]Radial kernel function (RBF); support vector machine (SVM)Work breakdown structure; resource breakdown structureReal-time prediction of lifting risks and examination of the spatial and temporal evolution of risks.The data can only validate the framework’s viability, and the spatiotemporal evolution patterns only apply to the validation project. Automatic controls are inadequate; risks still rely on manual processing.
[100]Apriori algorithmHuman–equipment–components–management–environment; time; spaceCoupling mechanisms between risk factors.Inadequate collection of validation data samples; lack of an intelligent evaluation system for the rules mined.
[110]Fault tree analysis (FTA); failure mode and effects analysis (FMEA).Installation processMeasures of risk factor importance.Subjectivity and bias.
[113]Fault tree analysis (FTA); Bayesian networks (BN)Domino theoryProactive warning.Subjectivity and bias; incomplete risk factors
[21]Fault tree analysis (FTA)Systems thinkingMeasures of risk factor importance.subjectivity and bias; incomplete risk factors.
[115]Mixed central point triangle whitening weight function; analysis of network processes (ANP)Human–technology–components–management–environmentMeasures of risk factor importance.Subjectivity and bias; high calculation volume.
[116]Structure entropy weight methodMan–material–machine–method–environment (4M1E)Strong operability and wide application; effectively resolve conflicting problems of uncertainty; synthesizing evidence information to reduce information uncertainty.Strong dependence on data; incomprehensible principles; of computation; ambiguity in processing; information; difficulty dealing with high; conflicting evidence.
[25]Structural equation modelling (SEM)Human factors analysis and classification system (HFACS)Refinement of the traditional human factors analysis and classification system (HFACS) into the HFACS-assembled building hoisting (PH) risk model.Subjectivity and bias; incomplete risk factors.
[17]Bayesian networks (BN)Systems-theoretic accident model and process (STAMP)Models are straightforward and can be understood visually.Determining the topology of its dependencies is complex and ambiguous.
[109]Finite element method (FEM)Human-machineA data flow for real-time dynamic analysis of tower cranes based on the Internet of Things is proposed, which summarized the time-series effects of load excitation, including vertical lifting, inclined lifting, sudden braking, and sudden unloading.Stability analysis only.
[117]Cloud model (Expectation–maximization algorithm, EM); Bayesian networks (BN)Human–object–management–environmentChange the reliance of traditional BN models on large amounts of training sample data or subjective assignment of values, eliminating the influence of real-time observation data during the construction process and randomness of the target safety risk values.Due to the limited sample data, the CPT between nodes obtained using the cloud model-based EM parameter learning algorithm differs somewhat from the actual situation.
[112]Analytic hierarchy process (AHP); entropy weight method; grey-fuzzy integrated evaluation methodManagement–design–procurement–construction–economics–policy–natureBuilding an improved weighting algorithm (AHP-EWM).Subjectivity and bias; lack of data support.
[20]A comparative evaluation of case studies and experimental economicshazard and operability (HAZOP)Reveals significant unsafe practices in six phases of lifting operations.Only qualitative analysis.
[101]Factor analysisAcciMapThe hierarchy of tower crane safety systems, the influencing factors, interactions, critical factors at each level, and the main dimensions are revealed.The findings apply to tower cranes only.
[118]Frequency analysisHazard typeMost of the accidents occurred during the evening.The findings apply to tower cranes only.
[83]Structural equation modelling (SEM)Components–operators–management–environmental–technologyAn analysis using Pareto’s Law and the diamond model, which states that 20% of the key factors affecting safety risk led to 80% of accidents.The indicator system is inadequate and general.
[102]Meta-network analysisRisk eventsThe method allows for the visual identification of key risk factors and is simple to use.Risk events are incomplete; future work should use MNA in other scenarios and add more entities and relationships to the meta-network.
[15]Fault tree analysis (FTA)Fault typeFilling the gap in safety assessment for asymmetric tandem lifting (ATL).The findings apply to mobile cranes only.
Table 5. Application of machine learning algorithms.
Table 5. Application of machine learning algorithms.
AlgorithmStrengthsLimitationsReference
Linear regressionSimple and interpretable.
It can be used for both regression and classification tasks.
Assumes linear relationship between features and target.
Sensitive to outliers.
Limited capacity for capturing complex patterns.
[179,180,181]
Logistic regressionSimple and interpretable.
Suitable for binary classification tasks.
Assumes a linear relationship between features and log-odds.
Limited capacity for capturing complex patterns.
Not suitable for multi-class classification tasks without modification.
[151,182,183]
Decision treesCan capture non-linear relationships.
Interpretable and can be visualized.
Can handle both categorical and numerical data.
Prone to overfitting.
Can be sensitive to small changes in data.
Lack of robustness to outliers.
[184,185,186]
Random forestsCan handle large datasets.
Can capture non-linear relationships.
Robust to outliers and noise.
Can be computationally expensive.
Prone to overfitting if not tuned properly.
Lack of interpretability compared to individual decision trees.
[187,188]
Support vector machinesEffective for high-dimensional data.
Robust to outliers.
Can handle both linear and non-linear relationships.
Can be computationally expensive.
Requires careful tuning of hyperparameters.
Limited interpretability.
[189,190,191]
K nearest neighborsSimple and easy to implement.
Can be used for both classification and regression tasks.
Robust to outliers.
Sensitive to data scaling and dimensionality.
Can be slow with large datasets.
Prone to overfitting with small datasets.
[192,193,194]
K means clusteringSimple and easy to implement.
Can handle large datasets.
Can identify patterns in unlabeled data.
Requires pre-specification of the number of clusters.
Sensitive to initialization.
May converge to local optima.
[195,196,197]
Principal component analysis (PCA)Effective for dimensionality reduction.
It can be used for feature extraction.
Can handle large datasets.
Assumes linear relationships between features.
It may lose the interpretability of original features.
Requires computation of eigenvalues and eigenvectors.
[198,199]
Gradient boosting methods (e.g., XGBoost, LightGBM)High accuracy and predictive power.
Can handle complex patterns and interactions.
Robust to outliers.
It can be computationally expensive.
Prone to overfitting if not tuned properly.
Lack of interpretability compared to individual decision trees.
[200,201,202]
Convolutional neural networks (CNNs)Excellent for image and video data.
Can automatically learn hierarchical representations.
State-of-the-art performance in many computer vision tasks.
Require large amounts of data and computing power.
Prone to overfitting with small datasets.
Interpretability can be challenging.
[203,204,205]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Junjia, Y.; Alias, A.H.; Haron, N.A.; Abu Bakar, N. A Bibliometrics-Based Systematic Review of Safety Risk Assessment for IBS Hoisting Construction. Buildings 2023, 13, 1853. https://doi.org/10.3390/buildings13071853

AMA Style

Junjia Y, Alias AH, Haron NA, Abu Bakar N. A Bibliometrics-Based Systematic Review of Safety Risk Assessment for IBS Hoisting Construction. Buildings. 2023; 13(7):1853. https://doi.org/10.3390/buildings13071853

Chicago/Turabian Style

Junjia, Yin, Aidi Hizami Alias, Nuzul Azam Haron, and Nabilah Abu Bakar. 2023. "A Bibliometrics-Based Systematic Review of Safety Risk Assessment for IBS Hoisting Construction" Buildings 13, no. 7: 1853. https://doi.org/10.3390/buildings13071853

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop