Article

A Multi-Criteria Assessment of Water Supply in Ugandan Refugee Settlements

1
Department of Environmental Engineering, Technical University of Denmark, Bygningstorvet, Building 115, 2800 Kongens Lyngby, Denmark
2
Department of Management Engineering, Technical University of Denmark, Bygningstorvet, Building 372, 2800 Kongens Lyngby, Denmark
*
Author to whom correspondence should be addressed.
Water 2018, 10(10), 1493; https://doi.org/10.3390/w10101493
Submission received: 21 September 2018 / Revised: 12 October 2018 / Accepted: 15 October 2018 / Published: 22 October 2018
(This article belongs to the Section Water Resources Management, Policy and Governance)

Abstract

:
Water supply challenges in emergency situations have increased in recent years and there is a need for analyses targeting economic and environmental sustainability. Our study investigated the end-user water demand, the capital and operational costs, the carbon footprint, the freshwater availability and the risks surrounding water quality for several groundwater supply alternatives in Ugandan refugee settlements. We compared hand pumps, motorised pumps (solar, diesel and hybrid) and water trucking. The end-users’ survey highlighted the significant variability of water access. The economic evaluation showed that the breakeven year for solar and diesel pumps was greatly affected by the length of the water distribution systems (e.g., pipes, storage tanks), the chosen timeframe and the daily working hours of the diesel engine. When excluding capital investment, most alternatives were economically viable at the existing water fee (0.8 USD/m3), and solar driven pumps were down to 0.09 USD/m3. Finally, the combustion of diesel caused the highest CO2-eq emissions per m3. Water trucking is the worst option in both the economic and environmental analysis at 7–8 USD/m3 and >1 kg CO2-eq/m3. The methodology and the results of this paper will support decision-makers to build and finance sustainable water provision solutions in refugee settlements.

1. Introduction

June 2017 ended with 65.6 million forcibly displaced people and 17 million refugees (excluding Palestinians), with 55% of this cohort originating from just three countries: Syria, Afghanistan and South Sudan [1]. The challenges are huge, since the average duration of refugee situations is between 10 and 17 years, depending on the calculation method [2,3]. Water supply is essential for the survival of human beings, with between 7.5 and 15 L per person per day required for drinking, cooking and personal hygiene [4]. Two different standards guide the planning of access to water in refugee camps: the SPHERE standards for emergencies [4] and the United Nations High Commissioner for Refugees (UNHCR) standards for post-emergency situations [5]. SPHERE recommends 15 L per person per day, a maximum of 250 persons per tap, 500 per hand pump and 500 m between households and water collection points. Meanwhile, UNHCR recommends 20 L per person per day, a maximum of 80–100 persons per tap, 200–300 persons per hand pump and a maximum of 200 m to a waterpoint. Furthermore, the areas where displaced people seek shelter have often limited or no existing water infrastructure [6], and so authorities and non-governmental organisations (NGOs) find themselves struggling to provide rapid emergency responses, and settlements are likely to remain for years ahead [7]. A rapid and incremental development of refugee settlements requires tools that can evaluate decisions on multiple timescales.
Life-cycle costing (LCC) and the carbon footprint are common tools used to quantify economic and environmental impacts. LCC is often used to calculate full cost recovery of water utilities in Europe and it is considered an extremely important analysis to ensure the financial sustainability of water supply (article 9 of the EU Water Framework Directive). UNHCR published a method for LCC in post-emergency situations and applied it to two refugee camps, namely Bambasi in Ethiopia and Kounoungou in Chad [8,9]. They found very strong differences in the service levels and cost per m3 of water in the two locations. For example, the investment cost per capita in Bambasi was more than three times larger than in Kounoungou.
Several studies have compared solar and diesel-powered groundwater-pumping systems in developing countries, but not for refugee camps. Diesel systems appear to be more harmful from an environmental point of view [10] and more expensive than solar if considering a timeframe of 20 years for systems below 19,000 m3/year [11,12] or after 25 years [13,14,15]. The same conclusion has been reached after 10 [16] or 5 years of operation [17]. It is worth mentioning that the majority of these studies gathered cost estimates or values from different countries [14,15,16,18]. Two relevant studies in similar geographical areas (South Sudan and Uganda) found that a diesel-powered system was more expensive than a hybrid system (diesel + solar) after 3 years of operation [19] and a solar-powered system after only 0.9 years [18]. However, only [8] highlighted the differences between short-term and long-term results.
There is a lack of consistency in the way sustainability is addressed when comparing water supply systems. The three pillars of evaluation (i.e., economic, environmental and social) and several types of multi-criteria analysis have been used, but the topic is still under development. Each study includes different parameters for comparison and different ways of aggregating them. For example, 7 environmental impacts, a cost-benefit analysis and 5 social impacts were included by [20]; 5 sub-indicators (e.g., financial management, consumer satisfaction) each quantified with 8–15 questions were included by [21]; and 6 dimensions (social, economic, environmental, institutional/legal, skills/knowhow, technical) and 3 perspectives (user, provider and investor) were addressed by [22]. In addition, it differs whether sustainability was considered in the planning phase or based on actual observations of already implemented solutions. Stakeholder involvement has been used both for questionnaires and for ranking water system parameters [20,21,23], but it is not commonly used in emergency situations.
To address some of the shortcomings of earlier studies, we conducted detailed LCC and carbon footprint analyses, using real-life data, assuming different timeframes and highlighting which assumptions contribute most to the results. Our sustainability analysis included both traditional (LCC and carbon footprint) and additional tools (risk of groundwater scarcity, end-users’ questionnaire and water quality), and we combined all the results in a qualitative manner for a general conclusion.

1.1. Background in Uganda

Uganda has a long tradition of hosting refugees, and its policy is described in Uganda’s 2006 Refugee Act and the 2010 Refugee Regulations whereby refugees are not hosted in gated refugee camps but in open settlements. They have access to education and basic services, as well as the right to work and move. To minimise potential conflicts, 70% of available resources are dedicated to the host communities and 30% to the refugees, excluding food distribution [24]. Unlike other refugee situations, the Ugandan government seeks to use emergency funds to build long-lasting infrastructure that can be used by locals in years to come. These principles are supported by national guidelines on building water supply systems in the West Nile region (Supplementary Material A.1).
This paper focuses on the South Sudanese refugee settlements in northern Uganda. South Sudan was formed after a referendum held in January 2011. The South Sudanese civil war started in December 2013 and has resulted in more than 2 million refugees of which over 1 million were hosted by Uganda by the end of 2017 [25]. A list of emergency response stakeholders in Uganda can be found in [26] and in Supplementary Material A.2.
Our study used data collected mainly from three refugee settlements in the north-western region of Uganda called the West Nile region (Supplementary Material A.3): Bidibidi, located in the Yumbe district, and the Rhino and Imvepi settlements, both in the Arua district. In these settlements, water is supplied by hand pumps, motorised systems and water trucking (Table 1). Trucks convey water from natural artesian springs, high-yield diesel-powered boreholes and surface water treatment plants (Supplementary Material A.4). Water trucking is the most common way of supplying safe water during an emergency, as it is highly flexible and rapidly available, but also very expensive, challenged by muddy conditions during the wet season and has, in general, a negative impact on road conditions [27]. For these reasons, many NGOs are undertaking efforts to phase out water trucking in Uganda [28].
For the two districts of Arua and Yumbe, outside the refugee settlments, the majority of water comes from deep boreholes and natural springs, while piped distribution is quite rare [30]. The fact that in both districts around 10% of water sources are non-functional due to low yield, technical breakdown, and low water quality highlights the importance of considering long-term sustainable water sources.

1.2. Study Aim

Our aim was to provide a framework for the evaluation of options for water supply in new refugee settlements. The framework was demonstrated for the refugee settlements in the West Nile region of Uganda. We evaluated alternative options for water provision currently considered by NGOs in the refugee settlements studied. The methodology and the results of our study should help decision-makers understand sustainability in emergency contexts and highlight the best value for money. To ensure a broad evaluation of the sustainability of water provision, we developed a method that would investigate the following:
  • End-user demand and their expectations of a water supply system;
  • Economic costs of all technical components of different alternatives for water supply, including hand pumps, motorised pumps (diesel, solar and hybrid) and water trucking;
  • Carbon footprint of the alternatives for water supply;
  • Freshwater availability and vulnerability to water stress;
  • Critical system point review in terms of safe water quality.

2. Materials and Methods

Our comparative study of different water supply systems is built on several different evaluations: an end-user survey, life-cycle costing (LCC), carbon footprint, freshwater assessment and hazard analysis and critical control points (HACCPs) (Table 2).

2.1. Alternative Water Supply Systems and Data Collection

Data were collected during two field trips in 2017 stretching over two weeks in May and one month between November and December. On these occasions, several stakeholders were interviewed and surveyed: the Danish Refugee Council (DRC) water, sanitation and hygiene (WASH) experts, other NGOs working with water supply, such as Red Cross Uganda, OXFAM and Water Mission, systems operators (at the borehole, responsible for chlorination etc.), the private suppliers of the water systems, water committees and end-users.
The quantitative comparisons are based on a functional unit of 1 m3 drinkable water delivered to end-users. In the LCC and the carbon footprint assessment, we compared 26 alternatives for water provision, covering manual hand pumps, motorised systems (solar, diesel and hybrid) and water trucking (Table 3). Each alternative represented a possible water supply system including the borehole drilling, the installation and operation of the pump and the distribution system (water tanks, pipes and taps or water trucking). We modelled several motorised boreholes with different pumping yields (i.e., 2, 5, 10, 25, 50 m3/h), in order to reach conclusions that were independent of the individual technical characteristics (e.g., the length of the pipes, the topography of the area, the population density). Four power systems were modelled: solar (pumping for 7 h), short-running diesel (pumping for 7 h with the same water demand as solar), long-running diesel (pumping for 10/12 h with a higher water demand than solar), and hybrid (pumping 7h with solar and the remaining with diesel, having the same water demand as the long-running diesel). Alternatives are described in Table 3 and Supplementary Material A.5. The pumped water was always treated with chlorination, except for the case of hand pumps. The solar-based systems were actual designs made by DRC using the SPHERE standards.
Water trucking was modelled in two ways: (1) assuming that the water source was a diesel-powered generator pumping water from a 25 m3/h borehole for 12 h a day (25_Dl); and (2) assuming a no-cost water source (best-case scenario as in the case of the artesian spring). On average, each water truck was assumed to distribute 25,000 L of water and to travel 14 km per trip (based on data collected during the field trip).
By contrast, for the end-users survey and HACCP, the comparison was made between hand pumps (manual pump), motorised systems (solar or diesel), and water trucking. The analysis of the water stress mainly analysed the groundwater availability.
Each water system was defined by a set of system components (Supplementary Material A.7): “Borehole” (e.g., excavation, screen casting, cement grouting), “Site” (e.g., security fencing, gate, guard’s house, generator plinth), “Pump” (e.g., submersible pump, solar panels, metallic structure, inverter and generator) and “Distribution” (e.g., excavation and pipe laying, taps, steel storage tanks).

2.2. End-Users Survey

A questionnaire survey made in collaboration with DRC investigated the context of water use among South Sudanese refugees in Uganda. In May 2017, 400 households in Zone 1 of the Bidibidi settlement were surveyed as a representative sample of the total population of 51,000 people in that zone. The survey (Supplementary Material A.8) included the following topics: demographic data and identification of each household’s water source, quantification of water demand and water use, means for water collection, water use patterns, perceived quality of water, time spent at the pump, and distance and time spent travelling between the household and the water source. Results were compiled into a spreadsheet for data processing and analysis, including the statistical significance of the results for different water sources.

2.3. Life-Cycle Costing (LCC)

LCC should answer the questions: (i) Are solar systems financially feasible for investors and the UN in emergencies? (ii) How many years does it take for solar-powered systems to be cost-effective, when compared to other water supply systems? (iii) Is an exit strategy possible for NGOs?
The methodology for life-cycle costing was inspired by the methodological report on the cost of water services in refugee settlements published by UNHCR [8]. In general, LCC should cover all of the life phases of a product (design and financing, construction and commissioning, operation and maintenance (O&M) and disposal) and all associated expenditure (capital investment, minor and major operation, maintenance and management-related expenditure). As in [8], this study did not include the expenditures covering management, because it was not possible to isolate them from the general budgets of NGOs. Similarly, the disposal phase was not included, due to its uncertainty.
We calculated the net present value (NPV) for 10 different timeframes ranging from 1 to 10 years of operation, to compare systems from both short- and long-term perspectives:
N P V ( i , N ) [ USD ] = C A P E X + t = 1 N O P E X t ( 1 + i ) ( t 1 )
where CAPEX (USD) is capital expenditure, OPEX (USD) is operational expenditure, i is the discount rate and t is the timeframe.
We decided to limit our calculations to 10 years because donors (e.g., UNHCR, United Nations Children’s Fund (UNICEF)) manage funding from a very short-term perspective, i.e., a few years rather than many. We also analysed the first year costs (in terms of both CAPEX and OPEX) because it represents what is often covered by external sources.
We calculated the NPV per m3 of water delivered and this unit cost reflects the price setting for the final consumer in order to achieve full cost recovery in the timeframe t. Full cost recovery means that in each timeframe (t) the sum of the expenditure (CAPEX and OPEX) is equal to the sum of revenues. Detailed calculations can be found in Supplementary Material A.9. The unit cost was compared to the existing water fees in the host communities (Supplementary Material A.10). An exit strategy is possible for NGOs if the unit cost of water is lower than the average water fee, meaning that the refugees could afford these systems once the situation normalises. The year in which an alternative water option becomes cheaper than another alternative was defined as the breakeven year.
NPV, is affected by the chosen discount rate (i). However, the concept of discounting money spent in the future is challenging in our case, because NGOs usually have easier access to funding in the early stages of an emergency compared to later stages. For this reason, three discount rates were tested in the study: 0% to model the case in which future money is affected by the risk of not getting it (baseline), 12% as the average of the last 10 years’ real interest rates found for Uganda [31], and 6% as a value between the two.
All capital expenditure (CAPEX) and the design of the solar-powered systems were based on real systems designed by DRC for refugee settlements in the area, while the hybrid and the diesel-powered systems were modelled as potential substitutions for solar-based pumping (Supplementary Material A.5). For example, we modelled the diesel-powered system having a pumping yield of 10 m3/h using the same data as the 10 m3/h solar-powered system, but changing the distribution length in case the annual water production was higher than for the solar limited by daylight. O&M activities (Supplementary Material A.6) included yearly operation (chlorine and diesel consumption, salary for guards and pump attendants, cleaning of the steel tanks), yearly maintenance (oil change, change of the filters, generic costs, contingencies) and major maintenance (replacement of the submersible pump, of the inverter, of the switch and of the generator).
We tested the robustness of the results in scenarios with varying parameters between a minimum and a maximum value for the lifetimes of the inverter, the submersible pump and the generator, the diesel consumption, and the cost of diesel and solar panels. Because DRC already installs 1.5 times the panel area needed in order to enhance pumping we assumed the yearly loss of solar panel efficiency negligible (0.8% per year in average [32]).

2.4. Carbon Footprint

We conducted an environmental analysis to quantify the impact on climate change of the different water supply systems. Emissions were converted into CO2-equivalents using characterisation factors published by the Intergovernmental Panel on Climate Change (IPCC) [33]. The inventory included all relevant activities involved in construction (i.e., drilling, pump, fencing, street lighting, generator, solar panels, tanks, structures for solar panels and steel tanks, excavation, water distribution systems) and operation and maintenance (i.e., chlorine, diesel, oil, replacing system components). The processes were based on the database ecoinvent [34]. As in the LCC, disposal was not included, due to its high uncertainty. The unit kg CO2-eq per m3 of water delivered was calculated by summing all the emissions up to the year x and then dividing for all the m3 of water delivered from the first until the year x. The carbon footprint was performed coherently with LCC (Supplementary Material A.11).

2.5. Freshwater Assessment and the Hazard Analysis and Critical Control Point (HACCP) Approach

The sustainability of water supply systems is dependent on long-term water availability, which, for the Yumbe region, was reviewed based on the current AWaRe method and recent hydrogeological surveys of groundwater availability [35,36].
Finally, we performed hazard analysis and critical control point (HACCP) (Supplementary Material A.12) approach to analyse the main risks surrounding water quality and to identify the critical control points of hand pumps, motorised systems with distribution piping and water trucking.

3. Results

3.1. End-Users’ Survey

The survey displayed the context of water use and investigated the challenges in accessing water. The survey results reflected the perceptions of the participants, and it was not attempted to validate all results through actual observations and measurements. Supplementary Material A.13 contains detailed results of the end-users survey.
The outcomes confirmed that mainly women (68%) and children (26%) were responsible for collecting water and that peak water demand was in the morning (80% for use and 70% for collection). The average water use was nearly 18 L per person per day, but almost 50% of the interviewees declared to have less than 15 L available per day (Figure 1); 40% lived more than 500 m away from a water source, and 55% had to wait for more than 60 min while at the water source. Refugees would like to have more water for growing crops and breeding animals and to make construction materials.
Only half of the interviewees thought that the water was of good quality: taste of chlorine was the major issue for 20% of the refugees using tapstands, whereas 30% were dissatisfied with the colour of the water and the 45% had an issue with the presence of salt. In addition, some refugees stated a preference for hand pumps for drinking water, due to the absence of chlorine.
Three major reasons for the insufficient access to water covered 75% of the answers (Figure 2): not enough jerry cans to either store or carry water (lack of containers), too long queuing times and not enough water available at the source.

3.2. Life-Cycle Costing

This section first describes capital and first-year expenditure relevant for the emergency response actors and operational costs relevant for the long-term support of the water systems.

3.2.1. Capital and First-Year Expenditure

Organisations installing water supply systems had CAPEXs between 7,000 USD for building a hand pump providing 7.5 m3 of water per day (HP), to above 800,000 USD for a hybrid system providing 600 m3 of water per day (50_H) (Figure 3). The results show how assuming a linear proportion between costs and one parameter (e.g., amount of water pumped) can be misleading. In fact, several parameters affected the results: the yield and the depth of the different boreholes, daily pump operation time and the length of the distribution system (for motorised boreholes). The length of the piping and the capacity of storage tanks depends on the topography of the area and on the population density—two parameters highly variable in the visited settlements. For example, the distribution length varied from 2000 m to more than 7000 m for the two solar systems with a pumping yield of 50 m3/h.
Even within the same capacity category, costs encountered during the first year of operation varied considerably (Figure 3). For example, building and operating a water system for one year with a yield of 50 m3/h for 7 h can cost from 420,000 USD (3.31 USD/m3) in 50_Ds2 to 604,000 USD (4.72 USD/m3 in 50_S. In general, “Borehole” and “Site” costs were not marked contributions to the first-year expenses (excluding the hand pump). On the other hand, “Pump” contributed markedly to overall cost in solar-powered systems (between 25% and 45%) and similar or less in hybrid (between 25% and 36%) and diesel-powered systems (between 14% and 19%). As expected, “Distribution” was the single largest contributor in all alternatives (37% to 68%), owing especially to the high costs of establishing the transmission and distribution pipes with steel storage tanks. Notably, water trucking exceeded the first-year expenses for all considered alternatives with around 6.7 USD/m3 spent on just the transport of water from a source to end-users.

3.2.2. Costs Over Time

The unit cost indicated how much each m3 of water should cost to obtain full cost recovery for a given system lifespan. Table 4 shows the unit costs per m3 in the third, fifth and tenth years of operation. Unit costs were found as total costs divided by total amount of water provided for the considered timeframe.
Calculating the cost of water depends markedly on the expected lifetime of the systems: after 3 years of operation, the unit cost of the motorised systems was between 1.1 and 5.5 USD/m3, while after 10 years it was between 0.51 and 3.1 USD/m3 of water. NPVs for varying timeframes expose the potential loss if a system fails or is abandoned before time. The unit cost increased by 31% to 47% by shortening the lifetime from 3 to 2 years of operation. This is a relevant consideration, since 27% of the non-functional boreholes in the host community of the Yumbe district has been abandoned due to low yield [30], probably because of improper location or drilling depth.
Hand pumps appeared to provide the cheapest unit of water (Table 4), comparable only to the 50 m3/h systems. On the contrary, water trucking was always very expensive and only meaningful during the first few months of the emergency, since its costs were already higher than providing water from the 25 and 50 m3/h boreholes during the first year of operation. To provide 15 L per person per day to 20,000 persons for 10 years, NGOs would have to spend around 833,000 USD on a 25 m3/h hybrid system with distribution pipes and more than 8 million USD when transporting water with trucks. A fixed water installation is economically preferable for any situation with a timeframe beyond a year.
When including CAPEX, only the 50 m3/h alternatives achieved a unit cost lower than the local water fee of 0.83 USD/m3 after 5 or 8 years, dependent on configuration, and the 25 m3/h solar and hybrid options needed more than 9 years of operation to reach a similar result. Even the hand pump needed to be in operation for more than 5 years to be able to reach such costs. All other alternatives were more expensive when considering up to 10 years of operation and full cost recovery of investment would need longer timeframes.
Unit cost allow finding the breakeven years among different power solutions (Figure 4). The breakeven year depended on systems compared: the solar systems had to run 3–5 years to be cheaper than the short-running diesel, while the hybrid needed 4–6 years to overtake the long-running diesel. In general, it was cheaper to run the diesel generator more than 7 h per day, and the hybrid systems were preferable over the solar system and the short-running diesel.
As seen in Figure 5 and Supplementary Material A.16, economies of scale affected all observed systems, in that as the capacity of the system increases, the cost of water decreases. The only exception was represented by the 2 m3/h system, since it had very short distribution piping (only 300 m) compared to the 5 m3/h (4102 m) or the 10 m3/h (6140 m).
In the literature, studies often only included the power pumping system [10,12,14,15,16,18], without any additional costs (e.g., preparation of the borehole and of the site, electric components, distribution pipes) covering a very high percentage of the overall cost. Also, the different possible pumping hours and the costs for solar and diesel (and the consequential longer distribution) were not calculated per amount of water provided but rather only per pump after setting a specific water head.

3.2.3. Operational Expenditure (OPEX)

The analysis of OPEX costs is relevant where CAPEXs are covered by donations and operations are transferred to local water communities or authorities after a few years. For all pumping yields systems, the purely solar (running for 7 h per day) option had the cheapest operational costs, followed by hybrid systems, long-running diesel-powered systems and lastly short-running diesel-powered systems (Figure 6). OPEXs for solar systems varied between 0.81–0.91 USD/m3 for the 2 m3/h system and between 0.09–0.15 USD/m3 for the 50 m3/h systems dependent on timeframe (Supplementary Material A.17).
It was clear that the majority of the systems’ OPEX would be less than the current tariffs of 0.83 USD/m3 (excluding the 2 m3/h diesel-powered system) (Supplementary Material A.18). However, none of them could survive with a tariff of 0.12 USD/m3, as currently paid by the 4000 Congolese refugees living in the neighbouring Lobule settlement (internal communication with DRC). In any case, refugees could pay part of the expenses without reaching full cost recovery, in order to create a sense of ownership of the systems.
The OPEXs were further analysed by dividing them into four classes: salary, fuel, minor maintenance and major maintenance (Figure 7 and Supplementary Material A.20). In general, salaries for guards and attendants at the pumping stations covered a majority of the OPEXs in the solar-powered systems. For diesel-powered systems, fuel consumption was the most important expense, followed by salaries and maintenance.

3.2.4. Scenario Analysis

The scenario analysis quantified the impact of these choices on the unit cost per m3 of water delivered and on the breakeven years Supplementary Material A.21). In general, the reliability of the diesel generator, the cost of fuel and the CAPEX for solar panels had the main impact on breakeven years among the alternatives. If the cost of diesel was 1.1 USD per litre instead than 0.83 USD, the 50 m3/h solar and the hybrid systems worked out cheaper than the long-running diesel in the fifth and the fourth years of operation, respectively, instead of the eighth or sixth years. If the cost of solar panels decreased by 20%, the breakeven years would be six and five. In general, the larger the system, the more sensitive the breakeven years for the characteristics of the generator and the cost of solar panels. These results confirm that the future costs of diesel-powered systems are uncertain and will depend on factors such as maintenance activity and cost of fuel. Lastly, discounting future cash flows by 6 or 12% does not change any conclusions, albeit all breakeven years would be delayed by 1–2 years (Supplementary Material A.14–A.29).

3.3. Carbon Footprint

The total cumulative kg of CO2-eq were calculated for each alternative (Figure 8) and per m3 of water delivered to the final user for ten different timeframes (Figure 9, Supplementary Material A.22 and A.23).
For all systems and in the first year, the majority of environmental impacts were caused by the production of steel for water storage (tanks and structure), photovoltaic panels, and by operation activities (diesel combustion). In general, direct emissions of diesel combustion caused the major impacts on climate change. When comparing different energy sources, the solar-powered system performed better for most timeframes, followed closely by the hybrid system. The only exception was in the 5 and 10 m3/h systems, where solar solutions needed to run for almost 2 years to outperform the diesel. Regarding the diesel-powered system, running the generator longer (10 or 12 h) was always better than using it for only 7 h.
When comparing different pumping yields, the hand pump was the most environmentally friendly solution (0.07 kg CO2-eq/m3 after 10 years of operation), as limited amounts of materials and energy were used. Among the motorised supply systems, the best systems were the 50 m3/h solar (0.16–0.17 kg CO2-eq/m3 after 10 years), whereas the worst were diesel systems with 2 m3/h yield (2.5–2.6 kg CO2-eq/m3 after 10 years). The impact owing to the transport of water with trucks (1.12 kg CO2-eq/m3) was in the same order of magnitude as those caused by the generator used for the water pumping. When comparing truck transport of water with the other alternatives, water trucking was in general better than the diesel generator and worse than the solar and hybrid options after 3 years of operation. If the trucking distance exceeded 40 km including return, its carbon footprint became worse than all alternatives after 3 years of operation.
In general, the larger the system, the better the performance relative to climate change, but this outcome depended strongly on the power required (either as the number of solar panels or as the size of the diesel generator).

3.4. Freshwater Availability

The Bidibidi settlement is located in the Yumbe district of Uganda, in an area categorised as a tropical savanna with an average yearly precipitation of 1100 mm/year. The dominant water body in the area is the White Nile, offering a fairly stable water discharge of around 1000 m3/s [37] that reaches its minimum during July and August. Based on data from the AWaRe project, the Yumbe district has approximately 80 to 90 times less water available per area compared to the world average [38]. The major limitation of the AWaRe project is that the size of the grid (55 km × 55 km in Uganda) is too large to account for local water conditions.
The main concern is the local and seasonal depletion of groundwater aquifers (at the scale of individual boreholes). Hydrogeological surveys have called for a better monitoring of groundwater levels and increased use of groundwater-potential maps in the planning and operation of water supply boreholes [36]. With the current low water demand in the range of 15 to 30 L/person/day, it was concluded that water availability can be ensured through the better coordination of groundwater exploration in the area, increased monitoring and the strategic placement of new boreholes [36]. However, with continued population increase and an assumed improvement in local farming and access to water, increased water consumption may be constrained by water stress at the regional scale, as indicated by the AWaRe indicator. Furthermore, when comparing settlements with the results of older studies [39], it appears that the northern part of Bidibidi is in an area classified with high water coverage, while Imvepi is located in an area with low water coverage, and both of them are located in areas poorly suited for growing crops (Supplementary Material A.24). Previous studies agree that groundwater availability is sufficient for the projected household demand, but 90% of the Bidibidi settlement is in a “low groundwater potential” area, meaning that local depletion could happen frequently if boreholes are not drilled after considering groundwater data [36]. Uncertainties related to groundwater availability and the outlook for a surface-based water supply support the implementation of boreholes that will ensure cost recovery in a timespan of years rather than decades.
The Ugandan government is considering implementing a surface water treatment plant as a long-term strategy for the region, but no information on the implementation plan could be found during the field trip. The major obstacle to surface water provision is the massive financial investment that such a plant and the distribution network would require. The size of the investment would require a completely different analysis and was considered beyond the scope of our study. Furthermore, although not considered in our assessment, rainwater harvesting should be (and is) considered as an additional source of water for households.

3.5. HACCP

The most relevant critical control points found in the construction of the systems were the quality of the borehole casing (particularly relevant for hand pumps) and the quality of distribution pipes installation. Both activities are important to prevent contaminated surface water entering the borehole or the distribution system. The most problematic points concerning spreading disease for both motorised systems and water trucking are water storage tanks and tap stands, even though chlorination was performed in the majority of the boreholes visited. Data covering water-quality monitoring should be collected and shared among the different stakeholders, and systematic cleaning and disinfection of the tanks and trucks should be conducted [36]. Additional data on the hazard analysis can be found in Supplementary Material A.25.

3.6. Summary of the Analyses

In summary, the five approaches in our assessment support a final evaluation of the proposed systems for water supply in Ugandan refugee settlements (Table 5).
Looking at both the economic analysis and the carbon footprint, hand pumps seem to be the best solution, due to the very low capital investment and material required. However, hand pumps need constant physical labour that limits the water availability at each pump. This means that hand pumps require many additional boreholes in the same area, in order to respect SPHERE (500 people per pump) or UNHCR (200 people per pump) standards. Considering that 90% of Bidibidi is considered a “low groundwater potential” area [36], it is preferable to design fewer high-yield boreholes, assess sustainable capacity and constantly monitor the groundwater level, rather than drilling many non-monitored, low-yield and, therefore, potentially unsuccessful hand pumps.
Our comparison does not reveal a generic “best technology” or the most profitable system; nonetheless, for our specific case, it appears that diesel is cheaper for between 1 and 5 years of operation, depending on the system, and solar in the medium to long term between 2 and 6 years of operation. Based on our method and on the provided spreadsheet (Supplementary Material B), it is possible to run a simplified LCC to find the likely breakeven years among different alternatives. The same spreadsheet can be used in all contexts where it is relevant to compare solar, diesel and hybrid ground water supply systems. Modelling limitations are the lack of the disposal phase and the assumed constant efficiency of solar panels.
The results of our study emphasise the importance of addressing the lifetime of the technological solutions under evaluation. The uncertainty related to the long-term sustainability of water withdrawal and the length of the stay of refugees in the settlement has a strong influence on the expected unit cost. Our results showed that a shift away from a three- to a five-year lifespan will decrease the unit cost by 21% to 38%, depending on the motorised system in use. In cases where financing is available in the short term, for example if initial investment costs are covered as donations from humanitarian agencies, the solar and hybrid systems have an advantage, since they provide a large yield at a very low operational cost in the years after installation.
Some reflection should address the lack of data on water consumption. All the analyses assumed a constant water demand, but we had no detailed data on this issue, and we speculate that water demand will grow when the water supply efficiency and reliability increases. Furthermore, the observed and metered amounts of water can be very different (as in [9]), due to losses in the distribution system or poor maintenance. For these reasons, monitoring and data-sharing among different stakeholders should be incentivised to avoid the cost of the systems being much higher than expected (e.g., if a borehole runs dry). Furthermore, stakeholders should constantly measure and share static and dynamic groundwater levels, and data on water consumption patterns and water demand should be collected through end-user surveys or smart distribution electronic devices.

4. Conclusions

This paper provides a framework for the evaluation of water supply systems in refugee settlements to address the need for efficient and effective water management to a record number of refugees and forcibly displaced people in the last few years [40].
It was found that:
  • There is significant variability in water access in refugee camps and a lack of data on water consumption. Water quantity appears to be an important parameter to achieve sustainable living conditions.
  • The cost of the studied systems are affected greatly by the water distribution systems (e.g., pipe installation, taps and steel storage tanks) and timeframe considered. Distribution is responsible for between 42% and 68% of the total costs encountered in the first year of operation. After 3 years of operation, the unit cost of motorised systems is expected to be between 1.1 and 6.6 USD/m3; after 10 years of operation the unit cost is between 0.51 and 3.4 USD/m3 of water.
  • When considering O&M costs alone, the solar-driven system running for 7 h per day and the hand pumps are the cheapest option followed by hybrid solar-diesel systems. Excluding investments, most options would survive and earn money with an income equal to the 0.83 USD/m3 currently paid by Ugandan citizens in the area.
  • In terms of carbon footprint, the solar option is the cleanest technology (0.16 to 4.1 kg CO2-eq/m3) followed by hybrid (0.52 to 3.6 kg CO2-eq/m3), long-running diesel (1.0 to 4.4 kg CO2-eq/m3), and short-running diesel generator (1.0 to 5.3 kg CO2-eq/m3). The majority of emissions are caused by diesel combustion.
  • Hand pumps are generally the cheapest and cleanest option per m3, but their low yield and the need to drill and monitor several boreholes increase the risk of overexploiting local groundwater and finding dry boreholes. In the case of high-yield systems, it is more probable that NGOs will use groundwater-potential maps and constantly monitor this groundwater, as recommended by themselves and governmental authorities.
  • Water trucking has a higher cost (7–8 USD/m3) and higher carbon footprint (>1 kg CO2-eq/m3) per unit of water compared to both hand pumps and motorised pumps with distribution systems for any timeframe beyond one year.
  • We recommend decision-makers to conduct case-specific life-cycle costing with the provided tool. Such analysis would highlight the trade-offs between different options.
  • In future studies it would be beneficial to collect water consumption data and consumption behaviour across seasons.

Supplementary Materials

The following Supplementary Materials are available online at https://www.mdpi.com/2073-4441/10/10/1493/s1. Three files are provided. SM A describes in more detail some background information, the methodology used, the data inventory and the results. SM B provides a simple Excel sheet that can be used to run a quick LCC and compare solar, diesel and hybrid powered systems. SM C reports the results of the LCC and of the carbon footprint in all the water supply systems modelled.

Author Contributions

Conceptualization, S.A.B., I.T., B.H., A.B. and M.R.; Data curation, S.A.B., I.T., B.H. and M.R.; Formal analysis, S.A.B.; Funding acquisition, M.R.; Investigation, S.A.B. and B.H.; Methodology, S.A.B., I.T., B.H. and M.R.; Project administration, S.A.B., A.B. and M.R.; Supervision, A.B. and M.R.; Validation, A.B. and M.R.; Visualization, S.A.B. and I.T.; Writing—original draft, S.A.B., I.T., B.H., A.B. and M.R.; Writing—review and editing, S.A.B., I.T., B.H., A.B. and M.R.

Funding

This study was one of the outputs of a one-year collaboration project between the Technical University of Denmark (DTU) and the Danish Refugee Council (DRC). The collaboration was funded by the pump manufacturer Grundfos, who had no influence on the chosen method, data analysis and interpretation.

Acknowledgments

The authors would like to thank all the DRC staff and especially John Paul Mwaniki, Anders Tharsgaard and Justyna Bekier. Furthermore, we would like to thank Yutaka Yoshinaka for the collaboration, Marie Louise Møllebæk Pollmann-Larsen from DTU SkyLab for the coordination of the project, Veronica Martínez for her support in the economic analysis, and Hans-Jørgen Albrechtsen for his involvement in the HACCP.

Conflicts of Interest

The authors declare no conflict of interest.

Abbreviations

UNHCRUnited Nations High Commissioner for Refugees
NGONon-governmental organisation
DRCDanish Refugee Council
WASHwater, sanitation and hygiene
LCClife-cycle costing
HACCPhazard analysis and critical control point
NPVnet present value
CAPEXcapital expenditure
OPEXoperational expenditure
SMSupplementary Materials

References

  1. UNHCR Figures at a Glance, June 2017. Available online: http://www.unhcr.org/figures-at-a-glance.html (accessed on 5 January 2018).
  2. Executive Committee of the High Commissioner’s Programme. Protracted Refugee Situations; Technical Report EC/54/SC/CRP.14; UNHCR: Geneva, Switzerland, 2004; Available online: www.unhcr.org/40c982172.pdf (accessed on 18 October 2018).
  3. Devictor, X.; Do, Q.-T. How Many Years do Refugees Stay in Exile? 2016. Available online: http://blogs.worldbank.org/dev4peace/how-many-years-do-refugees-stay-exile (accessed on 18 October 2018).
  4. The Sphere Project. Minimum Standards in Water Supply, Sanitation and Hygiene Promotion; The World Bank: Washington, DC, USA, 2011. [Google Scholar]
  5. UNHCR Emergency Handbook. Emergency Water Standard. Available online: https://emergency.unhcr.org/entry/93422/emergency-water-standard (accessed on 21 February 2018).
  6. Wendee, N. The WASH approach: Fighting waterborne diseases in emergency situations. Environ. Health Perspect. 2015, 123, A6–A15. [Google Scholar]
  7. Moore, B. Refugee Settlements and Sustainable Planning. 2017. Available online: https://www.fmreview.org/sites/fmr/files/FMRdownloads/en/shelter/moore.pdf (accessed on 18 October 2018).
  8. Pezon, C. Costing Water Services in a Refugee Context—Methodological Report; IRC: The Hague, The Netherlands, 2014. [Google Scholar]
  9. Pezon, C.; Bostoen, K.; Carrasco, M.; Jacimovic, R. Costing Water Services in Refugee Camps; IRC: The Hague, The Netherlands, 2015. [Google Scholar]
  10. Armanuos, A.M.; Negm, A.; Tahan, A.H.M.H. El Life Cycle Assessment of Diesel Fuel and Solar Pumps in Operation Stage for Rice Cultivation in Tanta, Nile Delta, Egypt. Procedia Technol. 2016, 22, 478–485. [Google Scholar] [CrossRef]
  11. Odeh, I.; Yohanis, Y.G.; Norton, B. Economic viability of photovoltaic water pumping systems. Sol. Energy 2006, 80, 850–860. [Google Scholar] [CrossRef]
  12. Solar Electric Light Fund (SELF). A Cost and Reliability Comparison Between Solar and Diesel Powered Pumps; SELF: Washington, DC, USA, 2008. [Google Scholar]
  13. Kazem, H.A.; Al-Waeli, A.H.A.; Chaichan, M.T.; Al-Mamari, A.S.; Al-Kabi, A.H. Design, measurement and evaluation of photovoltaic pumping system for rural areas in Oman. Environ. Dev. Sustain. 2017, 19, 1041–1053. [Google Scholar] [CrossRef]
  14. Kazem, H.A.; Al-Waeli, A.H.A.; Al-Kabi, A.H.K.; Al-Mamari, A. Technoeconomical assessment of optimum design for photovoltaic water pumping system for rural area in Oman. Int. J. Photoenergy 2015, 2015, 1–8. [Google Scholar] [CrossRef]
  15. Rehman, S.; Sahin, A.Z. Performance Comparison of Diesel and Solar Photovoltaic Power Systems for Water Pumping in Saudi Arabia. Int. J. Green Energy 2014, 12, 702–713. [Google Scholar] [CrossRef]
  16. Meah, K.; Ula, S.; Barrett, S. Solar photovoltaic water pumping-opportunities and challenges. Renew. Sustain. Energy Rev. 2008, 12, 1162–1175. [Google Scholar] [CrossRef]
  17. LORENTZ. Solar Drinking Water Supply—Am Nabak, Chad; LORENTZ: Ulzburg, Germany, 2014. [Google Scholar]
  18. Solar Water Initiative. Visit Report—Solar and Water Initiative. Refugee Settlements in Northern Uganda: 10 th January to 6 th February 2017; International Organization for Migration: Geneva, Switzerland, 2017. [Google Scholar]
  19. OXFAM (Yumbe, Uganda). Cost Analysis Generator vs. Hybrid. Internal communication, 2017. [Google Scholar]
  20. Godskesen, B.; Hauschild, M.; Albrechtsen, H.J.; Rygaard, M. ASTA—A method for multi-criteria evaluation of water supply technologies to Assess the most SusTainable Alternative for Copenhagen. Sci. Total Environ. 2018, 618, 399–408. [Google Scholar] [CrossRef] [PubMed]
  21. Mimrose, D.M.C.S.; Gunawardena, E.R.N.; Nayakakorala, H.B. Assessment of Sustainability of Community Water Supply Projects in Kandy District. Trop. Agric. Res. 2011, 23, 51–60. [Google Scholar] [CrossRef]
  22. Recommendations for the Sustainability and Scalability of Solar Powered Water Pumping for Domestic Supply in Adjumani and Kanungu Districts of Uganda. 2013. Available online: http://www.rural-water-supply.net/_ressources/documents/default/6-21-2-1383642915.pdf (accessed on 18 October 2018).
  23. Starkl, M.; Brunner, N.; López, E.; Martínez-Ruiz, J.L. A planning-oriented sustainability assessment framework for peri-urban water management in developing countries. Water Res. 2013, 47, 7175–7183. [Google Scholar] [CrossRef] [PubMed]
  24. UNHCR. ReHoPE—Refugee and Host Population Empowerment Strategic Framework: Uganda. 2017. Available online: https://data2.unhcr.org/en/documents/download/64166 (accessed on 18 October 2018).
  25. The Uganda Refugees Operational Portal Refugees and Nationals per District. Available online: https://ugandarefugees.org/ (accessed on 5 January 2018).
  26. UNHCR. Road Map for the Implementation of the Comprehensive Refugee Response Framework in Uganda. 2018–2020. 2018. Available online: https://data2.unhcr.org/en/documents/download/64290 (accessed on 18 October 2018).
  27. UNHCR; UNOPS. Terms of Reference for Feasibility Study, Preliminary and Detailed Design for Integrated Water Supply in Bidi Bidi Settlement and Neighboring Host Community—LOT 1; United Nations Office for Project Services (UNOPS): Copenhagen, Denmark, 2017. [Google Scholar]
  28. UNICEF. UNICEF Uganda Situation Report. 31 May 2017. Available online: https://www.unicef.org/appeals/files/UNICEF_Uganda_Situation_Report_31_May_2017.pdf (accessed on 18 October 2018).
  29. Ugandarefugees Statistical Summary—Refugees and Asylum Seekers in Uganda as of 31 October 2017. Available online: https://ugandarefugees.org/category/policy-and-management/refugee-statistics/?r=48 (accessed on 1 December 2017).
  30. Ministry of Water & Environment Water Supply ATLAS. Available online: http://wateruganda.com/ (accessed on 27 March 2018).
  31. The World Bank Real Interest Rate (%). Available online: https://data.worldbank.org/indicator/FR.INR.RINR?locations=UG&year_high_desc=false (accessed on 8 February 2018).
  32. Jordan, D.C.; Kurtz, S.R. Photovoltaic Degradation Rates—An Analytical Review. Prog. Photovolt. Res. Appl. 2013, 21. [Google Scholar] [CrossRef]
  33. Forster, P.; Ramaswamy, V.; Artaxo, P.; Berntsen, T.; Betts, R.; Fahey, D.W.; Haywood, J.; Lean, J.; Lowe, D.C.; Myhre, G.; et al. Van Changes in Atmospheric Constituents and in Radiative Forcing. In Climate Change 2007: The Physical Science Basis. Contribution of Working Group I to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change; Solomon, S., Qin, D., Manning, M., Chen, Z., Marquis, M., Averyt, K.B., Tignor, M., Miller, H.L., Eds.; Cambridge University Press: Cambridge, UK; New York, NY, USA, 2007; ISBN 9780521880. [Google Scholar]
  34. Ecoinvent Ecoinvent v3.3. Available online: https://v33.ecoquery.ecoinvent.org/Home/Index (accessed on 18 October 2018).
  35. Boulay, A.-M.; Bare, J.; Benini, L.; Berger, M.; Lathuillière, M.J.; Manzardo, A.; Margni, M.; Ca, A.-M.B. The WULCA consensus characterization model for water scarcity footprints: Assessing impacts of water consumption based on available water remaining (AWARE). Int. J. Life Cycle Assess. 2018, 23, 368–378. [Google Scholar] [CrossRef]
  36. Milnes, E. Mission Report—Hydrogeological Field Mission in West Nile (Uganda); UNHCR: Uganda, 2017. [Google Scholar]
  37. Nile Basin Initiative The Water Resources of the Nile Basin. State of the Nile River Basin 2012; Nile Basin Initiative Secretariat: Entebbe, Uganda, 2012; pp. 25–56. ISBN 978-9970-444-00-7. [Google Scholar]
  38. WULCA Watershed Level Values AWARE Factors v.1.2. Available online: http://www.wulca-waterlca.org/aware.html (accessed on 14 September 2018).
  39. Mong, C.; Nelson, C.; Oni, M. GIS for Good—Optimal Site Selection for Refugee Camps in Uganda: A GIS Based Methodology. 2014. Available online: http://gisforgood5.weebly.com/uploads/3/0/6/3/30636149/gisfinalreport1.pdf (accessed on 18 October 2018).
  40. UNHCR UNHCR Statistics. The World in Numbers. Available online: http://popstats.unhcr.org/en/overview (accessed on 8 October 2018).
Figure 1. Box plot of the current and desired amounts of water available per person per day from the survey conducted (Supplementary Material A.13).
Figure 1. Box plot of the current and desired amounts of water available per person per day from the survey conducted (Supplementary Material A.13).
Water 10 01493 g001
Figure 2. Answers to the question “Why don’t you have enough water?” from the conducted survey (Supplementary Material A.13). People could choose more than one option.
Figure 2. Answers to the question “Why don’t you have enough water?” from the conducted survey (Supplementary Material A.13). People could choose more than one option.
Water 10 01493 g002
Figure 3. Total costs (capital expenditure (CAPEX) + operational expenditure (OPEX)) encountered within the first year of operation. HP: hand pump; S: solar; Ds: short-running diesel; H: hybrid; Dl: long-running diesel. Details in Supplementary Material A.14.
Figure 3. Total costs (capital expenditure (CAPEX) + operational expenditure (OPEX)) encountered within the first year of operation. HP: hand pump; S: solar; Ds: short-running diesel; H: hybrid; Dl: long-running diesel. Details in Supplementary Material A.14.
Water 10 01493 g003
Figure 4. Unit costs (USD/m3) of the 25 m3/h alternatives between 2 and 10 years of operation (left). On the right are the breakeven years for solar and short-running diesel (7 h), hybrid and long-running diesel (10/12 h) and solar and long-running diesel. Discount rate = 0%.
Figure 4. Unit costs (USD/m3) of the 25 m3/h alternatives between 2 and 10 years of operation (left). On the right are the breakeven years for solar and short-running diesel (7 h), hybrid and long-running diesel (10/12 h) and solar and long-running diesel. Discount rate = 0%.
Water 10 01493 g004
Figure 5. Overview of unit costs (USD/m3) for the assessed alternatives: solar-powered system (running for 7 h), hand pump and water trucking. Details in Supplementary Material A.16. For a list of the alternatives, see Table 3. Discount rate = 0%.
Figure 5. Overview of unit costs (USD/m3) for the assessed alternatives: solar-powered system (running for 7 h), hand pump and water trucking. Details in Supplementary Material A.16. For a list of the alternatives, see Table 3. Discount rate = 0%.
Water 10 01493 g005
Figure 6. Overview of OPEX (USD/m3) for the 2 m3/h (left) and 10 m3/h (right) alternatives. The dotted lines indicate two local water fees found in the West Nile region. The OPEX increases over time because of reinvestments. Details in Supplementary Material A.18. Discount rate = 0%.
Figure 6. Overview of OPEX (USD/m3) for the 2 m3/h (left) and 10 m3/h (right) alternatives. The dotted lines indicate two local water fees found in the West Nile region. The OPEX increases over time because of reinvestments. Details in Supplementary Material A.18. Discount rate = 0%.
Water 10 01493 g006
Figure 7. Contribution analysis of the OPEX costs of eight alternatives over the first 5 years of operation Supplementary Material A.20). For a list of the alternatives, see Table 3.
Figure 7. Contribution analysis of the OPEX costs of eight alternatives over the first 5 years of operation Supplementary Material A.20). For a list of the alternatives, see Table 3.
Water 10 01493 g007
Figure 8. Carbon footprint (kg CO2-eq) for all the assessed alternatives (Supplementary Material A.22).
Figure 8. Carbon footprint (kg CO2-eq) for all the assessed alternatives (Supplementary Material A.22).
Water 10 01493 g008
Figure 9. Unitary carbon footprint (kg CO2-eq/m3) for the 25 m3/h alternative and water trucking. Details in Supplementary Material A.23.
Figure 9. Unitary carbon footprint (kg CO2-eq/m3) for the 25 m3/h alternative and water trucking. Details in Supplementary Material A.23.
Water 10 01493 g009
Table 1. Number of refugees and access to water in Bidibidi, Rhino and Imvepi settlements in the north-western region of Uganda * [29].
Table 1. Number of refugees and access to water in Bidibidi, Rhino and Imvepi settlements in the north-western region of Uganda * [29].
SettlementDistrictRefugees *Water Supply (End of 2017)
(L/Person/Day)Hand PumpsMotorised SystemsWater Trucks
BidibidiYumbe285,96917.630%43%27%
RhinoArua116,45315.523%26%51%
ImvepiAura126,63611.620%3%77%
Table 2. Summary of the different tools used for the comparative assessment. LCC: life-cycle costing; HACCP: hazard analysis and critical control points; NPV: net present value; CAPEX: capital expenditure. * N/A: non-applicable.
Table 2. Summary of the different tools used for the comparative assessment. LCC: life-cycle costing; HACCP: hazard analysis and critical control points; NPV: net present value; CAPEX: capital expenditure. * N/A: non-applicable.
End-Users’ SurveyLCCCarbon FootprintFreshwater AvailabilityHACCP
Items investigated/
compared
400 households26 alternatives for water supply26 alternatives for water supplyGroundwater availability Surface waterHand pump Motorised pumps Water trucking
OutputsQuestionnaire dataNPV/m3 (incl. CAPEX)
NPV/m3 (excl. CAPEX)
CO2-eq/m3Hydrogeological analysisCritical Points
Table 3. Technical characteristics of the assessed alternatives. Details in Supplementary Material A.5. Truck (1) indicates that the water source is the same as in the 25_Dl; Truck (2) models water trucking assuming a no-cost water source (e.g., artesian spring). * Includes transmission and distribution pipes. ** Limit set by the SPHERE standards.
Table 3. Technical characteristics of the assessed alternatives. Details in Supplementary Material A.5. Truck (1) indicates that the water source is the same as in the 25_Dl; Truck (2) models water trucking assuming a no-cost water source (e.g., artesian spring). * Includes transmission and distribution pipes. ** Limit set by the SPHERE standards.
AlternativePumping YieldPeople ServedDaily Time and Power for PumpingPipes *Storage
(m3/h)(m)(m3)
HP0.8500 **12 h, ManualN/A
2_S29337 h, Solar30010
2_Ds29337 h, Diesel30010
2_Dl2133310 h, Diesel36410
5_S523337 h, Solar410240
5_Ds523337 h, Diesel410240
5_H53333Hybrid: 7 h Solar + 3 h Diesel586040
5_Dl5333310 h, Diesel586040
10_S1046677 h, Solar614060
10_Ds1046677 h, Diesel614060
10_H108000Hybrid: 7 h Solar + 5 h Diesel10,52560
10_Dl10800012 h, Diesel10,52560
25_S2511,6677 h, Solar5383120
25_Ds2511,6677 h, Diesel5383120
25_H2520,000Hybrid: 7 h Solar + 5 h Diesel9229150
25_Dl2520,00012 h, Diesel9229150
50_S5023,3337 h, Solar7128150
50_Ds5023,3337 h, Diesel7128150
50_H5040,000Hybrid: 7 h Solar + 5 h Diesel12,219250
50_Dl5040,00012 h, Diesel12,219250
50_S25023,3337 h, Solar2024150
50_Ds25023,3337 h, Diesel2024150
50_H25040,000Hybrid: 7 h Solar + 5 h Diesel3470250
50_Dl25040,00012 h, Diesel3470250
Truck (1)2520,00012 h, Diesel92290
Truck (2)--Artesian spring00
Table 4. Overview of the cheapest and most expensive (USD/m3) alternatives in the third, fifth and tenth years of operation. D: Diesel; HP: Hand pump; H: Hybrid. Discount rate = 0%. Details in Supplementary Material A.15.
Table 4. Overview of the cheapest and most expensive (USD/m3) alternatives in the third, fifth and tenth years of operation. D: Diesel; HP: Hand pump; H: Hybrid. Discount rate = 0%. Details in Supplementary Material A.15.
YearCheapestMost Expensive
(USD/m3)Alternative(USD/m3)Alternative
3rd1.12
1.22
D, 50 m3/h for 12 h/day
HP and H, 50 m3/h for 12 h/day
7.6–6.7
5.5
Water trucking
D, 2 m3/h for 8 h/day
5th0.82
0.86
D and H, 50 m3/h for 12 h/day
HP
7.5–6.7
4.0
Water trucking
D, 2 m3/h for 8 h/day
10th0.51
0.53
H, 50 m3/h for 12 h/day
Solar, 50 m3/h for 8 h/day
7.4–6.7
3.1
Water trucking
D, 2 m3/h for 8 h/day
Table 5. Summary of results from the sustainability assessment. The colour code shows a qualitative ranking of the criteria, where green is the best and red is the worst.
Table 5. Summary of results from the sustainability assessment. The colour code shows a qualitative ranking of the criteria, where green is the best and red is the worst.
LCCCarbon FootprintFreshwater AvailabilityHACCP
UnitCAPEX + OPEX USD/m3OPEX USD/m3kg CO2-eq/m3N/AN/A (Critical Points)
Hand pump Several boreholesBorehole casing
Solar-poweredDepends on the system and timeframe Deep boreholeTanks and tap stands
Hybrid-poweredDue to diesel and maintenanceDue to diesel combustion
Diesel-poweredDue to diesel and maintenanceDue to diesel combustion
Water truckingAlways most expensive after 1 year of operationDue to diesel combustionDue to diesel combustionArtesian spring, deep boreholes or surface waterTrucks, tanks and tap stands

Share and Cite

MDPI and ACS Style

Andreasi Bassi, S.; Tange, I.; Holm, B.; Boldrin, A.; Rygaard, M. A Multi-Criteria Assessment of Water Supply in Ugandan Refugee Settlements. Water 2018, 10, 1493. https://doi.org/10.3390/w10101493

AMA Style

Andreasi Bassi S, Tange I, Holm B, Boldrin A, Rygaard M. A Multi-Criteria Assessment of Water Supply in Ugandan Refugee Settlements. Water. 2018; 10(10):1493. https://doi.org/10.3390/w10101493

Chicago/Turabian Style

Andreasi Bassi, Susanna, Iskandar Tange, Benjamin Holm, Alessio Boldrin, and Martin Rygaard. 2018. "A Multi-Criteria Assessment of Water Supply in Ugandan Refugee Settlements" Water 10, no. 10: 1493. https://doi.org/10.3390/w10101493

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop