Next Article in Journal
Spatio-Temporal Changes and Influencing Factors of Meteorological Dry-Wet in Northern China during 1960–2019
Next Article in Special Issue
An Experimental Study on the Determination of Shale KIC by Semi-Disk Three-Point Bending
Previous Article in Journal
Rainfall Projections from Coupled Model Intercomparison Project Phase 6 in the Volta River Basin: Implications on Achieving Sustainable Development
Previous Article in Special Issue
Study on the Optimal Volume Fracturing Design for Horizontal Wells in Tight Oil Reservoirs
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Optimization of the Well Start-Up Procedure and Operating Parameters for ESP Gas Well Dewatering

1
No.1 Gas Production Plant, PetroChina Xinjiang Oilfield Company, Karamay 834000, China
2
Key Laboratory of Petroleum Engineering Education Ministry, China University of Petroleum (Beijing), Beijing 102249, China
*
Author to whom correspondence should be addressed.
Sustainability 2023, 15(2), 1498; https://doi.org/10.3390/su15021498
Submission received: 15 November 2022 / Revised: 5 December 2022 / Accepted: 9 January 2023 / Published: 12 January 2023
(This article belongs to the Special Issue Numerical Analysis of Rock Mechanics and Crack Propagation)

Abstract

:
The Electrical Submersible Pump (ESP) systems were deployed in two gas wells for the dewatering of the gas reservoir. However, problems, such as the failure to start up the ESP, and changes in reservoir parameters occurred during the production. For the first problem, the well start-up operation records indicate that the ESP’s gas locking happened. To avoid this, an optimization method of the well start-up procedure for the ESP well with a check valve was correspondingly proposed, which can solve the problem without any workovers. Secondly, based on the working characteristics of the ESP and the nodal analysis method, a set of optimization methods for the operating parameters of ESPs were introduced to achieve the inflow and outflow balance. For one well, the original ESP system was planned to be installed after hydraulic fracturing. Traditionally, the ESP operating parameters were designed based on the production rate. However, in this case, the production rate and the ESP operating frequency were designed simultaneously to maximize the pump efficiency.

1. Introduction

As one of the most important clean energies, natural gas is playing an important role in the world energy market [1]. To promote the optimization of the energy structure, it is advisable to increase the exploitation of natural gas [2].
The Kelameili gas field, a reserve of 1.03 × 1011 m3, is located in the Junggar Basin, Northwest China [3]. After over 20 years of production, the D18 gas reservoir of the Kelameili gas field has entered the late stage of exploitation. Gas wells are facing serious challenges of liquid loading problems. The overall daily gas production of the D18 gas reservoir is 54 × 104 m3/d, and the daily water production is 120 m3/d. The application of the dewatering method is key to avoiding water accumulating in the bottom hole and keeping the gas well flowing [4,5,6]. In this situation, two sets of Electrical Submersible Pump (ESP) systems were hereby deployed for gas reservoir dewatering.
The advantages of ESP include the capability of lifting an extremely wide flow range; small-size surface equipment; that it is simple to operate; that it is easy to install downhole sensors [7] and easy to perform corrosion and scale treatment; its capability of being installed in deep wells; and its highly flexible production parameters if working with a variable speed drive (VSD). The disadvantage of the ESP includes the need for high voltage electric power; that it is expensive to change the equipment and match the declining well capability; that the cable may be deteriorated under dramatic pressure changes; and that the gas and solid production is troublesome [8,9,10,11,12,13]. ESP has been widely used in gas well dewatering in recent years [14,15,16]. However, the main material produced by the ESP in the dewatering gas well has changed from the liquid form to a gas-water mixture. Additionally, the gas reservoir conditions tend to be more complicated, shortening the ESP’s operating life in the gas well [4].
During the production in the D18 gas reservoir, two main problems are the failure to start up the ESP, and changes in reservoir parameters.
For the first problem, the existing well start-up procedures and operation records were analyzed, and the results indicate the reason that a section of the gas column is sealed in the centrifugal pump below the check valve, thus leading to the ESP’s gas locking. The pump cannot provide sufficient head to open the check valve. To solve this problem, conventional solutions are pulling out the system, running a new system without a check valve, adjusting the position of the check valve upward, or just using an automatic reversing valve [15,17,18]. All of these conventional methods require costly workover operations. However, in this case, a novel method was proposed, which could bleed the gas column trapped in the pump by alternately bleeding off the pressure in tubing and TCA (Tubing-Casing-Annulus). This novel method can solve the problem without any workovers, and save the costs, manpower, and time for the operators.
For the second problem, the nodal analysis method was introduced to solve the problem. After months of production, one ESP system was pulled out and hydraulic fracturing was carried out for this well to enhance the production capacity. The original ESP system was planned to be installed for this well. Because the production capacity changed significantly, the operating parameters should be optimized. Traditionally, the ESP operating parameters were designed based on the water production rate. However, in this case, the liquid production rate and the ESP operating frequency were designed simultaneously using the given ESP performance data to maximize the pump efficiency.

2. Materials and Methods-Situation of Gas Reservoir, Wells, and ESP Systems

D18, located between 3200–3800 m, is a condensate gas reservoir containing bottom and side water. The geological structure of the gas reservoir and the relationship between gas and water are rather complex, and the fractures are well-developed in the reservoir. With the exploitation of the gas reservoir, the formation pressure continues to drop, with the edge and bottom water invading significantly, thereby leading to a gradual increase in the water production of the gas wells.
As the water rate increases in a gas well, the gas rate will be too low to take all water production to the surface, so that a point will be reached where water begins to accumulate in the bottom hole. This will eventually stop the production of the gas well [5].
Considering the high water production in the gas reservoir, the operators decided to use the ESP system for dewatering the gas reservoir. Two ESP systems were installed on two wells, i.e., D4 and D8, which were located in the water-flooded zones of the D18 reservoir. The location of these two wells is shown in Figure 1, and the well performance data summary is shown in Table 1.
The ESP systems used in D4 and D8 are the same, and the basic and performance data of the ESP system are shown in Table 2, while the performance curves of this ESP system are shown in Figure 2. According to the API recommendation, a check valve was installed with two tubing strings above the pump discharge [19].

3. Results and Discussion

3.1. Case 1: Optimization of The Well Start-Up Procedure

3.1.1. Challenge Overview-Fail to Start the ESP

The gas well shut-ins lead to pressure build-up in the wellbore [20]. Before starting up the pump, the high-pressure gas in the well has to be bled off at the wellhead, and the pressure bleed-off operation follows the procedure below. Firstly, the pressure in TCA was bled for 1 h. To protect the ESP downhole cable from decompression [21,22], the pressure bleed-off speed needs to be controlled at 3–4 MPa/h. Secondly, the well was shut in for 20 min. These two steps were repeated until the casing pressure dropped to the target value. During the above processes, the tubing was kept shut off to prevent the gas from entering the pump. After that, the tubing choke was opened to bleed the tubing pressure. Changes in the wellhead tubing pressure and casing pressure during the whole procedure are shown in Figure 3.
Afterwards, the pump could be started. However, no liquid production could often be observed at the surface when the ESP was started. In this case, the well could not be normally put into production. To start the ESP system smoothly and put the gas well into production, it is necessarily important to analyze the reasons for this phenomenon.

3.1.2. Analysis of the Reasons

In the case of the ESP start-up failure, the motor current was recorded to be 21.5–22.5 A (the nameplate current of the motor is 38.2 A, and the no-load amps is 18.7 A). As the motor current changes linearly with motor loading [23,24], this current indicates a low load of the ESP motor. As mentioned above, a check valve was installed above the pump, and the failure is attributed to the fact that gas entered the pump from the intake during the pressure bleed-off process. Besides, the gas column was sealed in the centrifugal pump below the check valve, thus resulting in gas locking. The pump failed to provide enough head to open the check valve and discharge the gas trapped in the pump, as shown in Figure 4. Subsequently, to smoothly start up the well as soon as possible, a well flushing operation was carried out to squeeze out the gas column.

3.1.3. Optimization Methods

According to the above analysis, avoiding the gas column trapped in the pump is the key to ensuring the smooth start-up of the well. As mentioned before, conventional methods require costly workover operations. Typically, a workover needs at least six workers, takes one week, and costs about 56,000 USD. To this end, the well start-up procedure was hereby optimized in this study, which was proven effective in the case of avoiding workover operations.
Given that the tubing pressure remains high during the pressure bleed-off process, the pressure above the check valve is always high. In this case, the check valve cannot be opened, and the gas column below it cannot move upwards to the surface, which eventually leads to the gas locking. In order to avoid this gas column in the pump, the hereby-proposed optimization method is to properly control the pressure bleed-off sequence of the tubing and casing, so that the check valve can be opened and the gas column can be bled out from the pump.

3.1.4. Estimation of Tubing Pressure Bleed-Off Speed

(a)
Pressure below the check valve
The bottom of the check valve is connected to the intake of the ESP, so the pressure can be directly calculated from the intake pressure (Pi) read by the downhole sensor.
P v l = P i P  
where, Pvl denotes the pressure below the check valve, MPa; Pi, the pump intake pressure read by the downhole sensor, MPa; and ∆P, the differential pressure between the sensor and check valve, MPa.
With the water density in the well and the vertical depth difference between the sensor and the check valve, the pressure difference ΔP is calculated to be about 0.03 MPa for this case.
(b)
Pressure above the check valve
In the case of the check valve being closed, the inside of the tubing is a simple combination of the water column and the gas column. Therefore, the pressure above the check valve can be calculated once the depth of fluid level is given.
When the high-pressure gas in the tubing is bled-off, the gas flow should be connected to a flow meter to calculate the tubing pressure drop speed and gas flow rate within a short period of time. Then, the gas volume in the oil pipe can be calculated using the following equation:
V g = P t q g r p
where Vg refers to the gas volume in the tubing, m3; Pt, wellhead tubing pressure, MPa; qg, the gas flow rate when bleeding pressure through the tubing head, m3/s; and rp, the drop speed of the wellhead tubing pressure, MPa/s.
Then, the depth of fluid level in the tubing can be calculated by the following equation:
d f = 4 V g D t 2
where d f is the depth of fluid level in the tubing, m; and D t , the inner diameter of the tubing, mm.
After that, the pressure above the check valve can be calculated using the following equation:
P v u = P t + ρ w g d v d f
where ρw denotes the water density, kg/m3; g , the gravitational acceleration, N/kg; and dv, the vertical depth of the check valve, m.
(c)
Tubing pressure bleed-off rate
The pressure bleed-off speed of the oil pipe can be calculated as follows according to the pressure difference between the top and bottom of the check valve:
R p t = P v u P v l / t
where Rpt refers to the tubing pressure bleed-off speed, MPa/min; and ∆t, the interval time between two pressure bleed-off for the casing, which shall be 20 min based on the existing procedures.

3.1.5. Optimized Well Start-Up Procedure

Following the existing pressure bleed-off procedure, it is planned to alternately bleed the pressure in the tubing and the casing to open the check valve. Once the check valve opens, the gas sealed in the pump will be squeezed into the tubing and bled through the wellhead tubing choke.
The optimized well start-up procedure can be expressed as follows:
  • Record the parameters such as the wellhead tubing pressure, casing pressure, and intake pressure.
  • Perform the TCA bleed-off process for 1 h at a design rate (3–4 MPa/h).
  • Carry out the tubing bleed-off process, and the bleeding rate should be Rpt. Pay attention to the reading of Pi: significant fluctuation of Pi indicates that the check valve has been opened. Then, shut down the tubing choke.
  • Repeat Steps 1–3 until the casing pressure was bled to the target value.
  • To prevent the gas from entering the pump again, start up the ESP as soon as possible.
Figure 5 depicts the flow chart of the optimized well start-up procedure, while Figure 6 and Figure 7 show the downhole gas-water distribution and wellhead pressure changes during the whole procedure, respectively.

3.2. Case 2: Optimization of ESP Operating Parameters

3.2.1. Challenge Overview—Changes in Well Conditions

After the ESP start-up, the bottom hole flowing pressure of Well D4 was about 18.4 MPa, and the water production was about 25 m3/d in the early stage, but decreased gradually to less than 10 m3/d, failing to meet the overall dewatering requirements of the gas reservoir. Thus, the ESP system was pulled out, and hydraulic fracturing was performed on the well. After that, a production test was carried out on the well using a gas lifting system. An average daily water production of 145 m3/d was obtained, as shown in Figure 8. The average bottom hole flowing pressure was 19.55 MPa, and the production index was 11.9 sm3/(d·MPa). The operators plan to install the original ESP system to the well. However, considering the large change in the water production capacity, the operating parameters need to be further optimized.

3.2.2. Nodal Analysis Method for ESP

Based on the nodal analysis method [25,26], the ESP system was selected as the analysis node, and the pump discharge pressure (Vertical Lift Performance, VLP curve) and the pump intake pressure (Inflow Performance Relationship, IPR curve) under various flowrates were calculated, respectively. The difference between the two curves is the head to be provided by the ESP (as shown in Figure 9). pi is the pump intake pressure; pd, the pump discharge pressure; and Δp, the difference between pd and pi, which is the head to be provided by the ESP.
The head curve of the ESP under a given frequency can be obtained by the following affinity laws of the ESP [21]:
Q = Q r n n r  
H = H r n n r 2
where n   and   n r are ESP operating frequency and nameplate frequency, Hz; Q   and   Q r , the flowrates under n ,   n r , m3/d; and H   and   H r , heads generated by the ESP under n , n r , m.
The relationship between the heads and the flowrates of the ESP at the nameplate frequency can be fitted into the following polynomial form [27]:
H r = i = 0 5 c i Q r i
where ci is a constant related to the pump; Qr, the flowrate under nameplate frequency, m3/d; and Hr, the head generated by the ESP under nameplate frequency, m.
The relationship between the head and flow rate of the ESP at any frequency can be obtained by combining Equations (6)–(8), and the theoretical operating frequency of the ESP can be calculated according to the given production parameters.

3.2.3. Optimization of Operating Parameters to Maximize the Pump Efficiency

The water production capacity of Well D4 after fracturing was greatly improved, and the average daily water production during the test pumping period (145 m3/d) was much higher than the Recommend Operation Range (ROR) of the original ESP system. To guarantee the smooth operation of the original ESP system in the well, it is necessary to redesign the production parameters [28].
According to well operators, it is the primary goal to improve the pump efficiency while redesigning operating parameters. Based on the working characteristics of ESP, the pump efficiency is only related to the flow rate through the pump when fluid properties are unchanged. The traditional design method calculates the operating parameters such as the pump efficiency according to the given design flow rate. However, when the optimization goal is pump efficiency, the flow rate needs to be designed according to the pump efficiency data. To maximize the pump efficiency, the working point should fall on the best efficiency point (BEP) of the pump. The BEPs under various frequencies can be calculated with the affinity laws of ESP.
In this case, based on the nodal analysis method, the procedure to optimize the operating parameters can be summarized as:
  • Set the pump as the analysis node, calculate the discharge pressure (VLP curve) and intake pressure (IPR curve) under various flow rates, and calculate the difference between the discharge pressure and intake pressure under various flow rates (VLP-IPR curve).
  • Spot the BEP of the ESP under the nameplate frequency and calculate the BEP under different frequencies.
  • Combine the VLP-IPR curve with the BEP curve, and the intersection of the two curves will become the desired working point where the pump efficiency is maximized.
In this case, the wellhead tubing pressure was set to 7 MPa, and the VLP-IPR curve and the BEP curve are shown in Figure 10. The intersection of the two curves corresponds to a flow rate of 56 m3/d, and the frequency of the ESP is 40 Hz. Therefore, if the original ESP system is installed into Well D4 after fracturing, the wellhead tubing choke should be adjusted to maintain the tubing pressure at 7 MPa. Besides, the ESP should be set to work at 40 Hz to achieve the inflow and outflow balance. The water production should be 56 m3/d, and the pump efficiency is 52% for this point. The pump efficiency was enhanced significantly compared to the previous value of 19.0–39.8%.
After a period of production, the water production capacity of the well may gradually decline. Then, the wellhead tubing pressure can be reduced slightly, and the new IPR and VLP should be correspondingly calculated. Combined with the BEP curve, the maximum pump efficiency operating point can be solved using this very method.

4. Conclusions

  • For the ESP system with a check valve, ESP start-up failures often occur in gassy wells. Based on the working record during the well start-up process, the failure was considered the result of some gas entering the pump through the pump intake and being sealed in the pump by the check valve. This gas column caused the gas locking of the centrifugal pump.
  • A new well start-up procedure for ESP dewatering gas wells with a check valve was also proposed. The new procedure could bleed the gas column trapped in the centrifugal pump through the check valve by alternately bleeding off the pressure in tubing and TCA. By virtue of this procedure, the ESP start-up failure can be avoided without the need for workover operations, thereby saving time, manpower, and cost for the operators.
  • The nodal analysis method was introduced to optimize the operating parameters of an ESP system. Combined with the affinity laws of the ESP system, either the working status can be calculated based on a given frequency, or the optimized working frequency can be calculated in accordance with a working case.
  • Based on the nodal analysis method, an optimization method for production rate and ESP working frequency was introduced. Unlike traditional methods, the optimization objective of this method is to maximize the pump efficiency. Additionally, this method can optimize the flow rate based on the pump efficiency data of a given ESP system, and the working frequency of the ESP can be calculated as well.
  • The ESP operating parameters optimizing method was applied to a well. The hydraulic fracturing operation was performed on the well to enhance the production capacity and the original ESP system should also be installed into the well. The flow rate and the ESP operating frequency were successfully calculated using this new method. Besides, the calculation results indicate that the best pump efficiency can be reached, and it will be 12.2–33% higher than before

Author Contributions

Conceptualization, X.W. and X.F.; methodology, J.L., G.H. and H.L.; software, G.H. and J.Y.; validation, X.W. and X.F.; formal analysis, J.Y. and G.H.; investigation, J.H. and H.L.; resources, Z.L.; data curation, J.L., J.H., H.L. and Z.L.; writing—original draft preparation, J.Y.; writing—review and editing, G.H.; visualization, J.Y.; supervision, X.W. and G.H.; project administration, X.F.; funding acquisition, G.H. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Science Foundation of China University of Petroleum, Beijing, grant number No.2462021XKBH011.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Chai, J.; Liang, T.; Zhou, X.; Ye, Y.; Xing, L.; Lai, K.K. Natural Gas Consumption of Emerging Economies in the Industrialization Process. Sustainability 2016, 8, 1089. [Google Scholar] [CrossRef] [Green Version]
  2. Xiong, W.; Yan, L.; Wang, T.; Gao, Y. Substitution Effect of Natural Gas and the Energy Consumption Structure Transition in China. Sustainability 2020, 12, 7853. [Google Scholar] [CrossRef]
  3. Lu, J.; Luo, Z.; Zou, H.; Li, Y.; Hu, Z.; Zhou, Z.; Zhu, J.; Han, M.; Zhao, L.; Lin, Z. Geochemical characteristics, origin, and mechanism of differential accumulation of natural gas in the carboniferous kelameili gas field in Junggar basin, China. J. Pet. Sci. Eng. 2021, 203, 108658. [Google Scholar] [CrossRef]
  4. Peng, Y.; Liao, T.; Kang, Y.; Zhu, Q.; Li, C. Unlock the Liquid Loaded Gas Wells with ESP Technology: The Successful ESP Dewatering Application in China Sichuan Gas Field. In Proceedings of the International Petroleum Technology Conference, Bangkok, Thailand, 14–16 November 2016. [Google Scholar] [CrossRef]
  5. Lea, J.F.; Lynn, R. Gas Well Deliquification; Gulf Professional Publishing: Houston, TX, USA, 2019; pp. 7–23. [Google Scholar]
  6. Veeken, C.; Dawood, A.K. Selecting artificial lift or deliquification measures for deep gas wells in the sultanate of Oman. In Proceedings of the SPE Kuwait Oil & Gas Show and Conference, Mishref, Kuwait, 13-–16 October 2019. [Google Scholar] [CrossRef]
  7. Yang, P.; Chen, J.; Wu, L.; Li, S. Fault Identification of Electric Submersible Pumps Based on Unsupervised and Multi-Source Transfer Learning Integration. Sustainability 2022, 14, 9870. [Google Scholar] [CrossRef]
  8. Heinze, L.R.; Herald, W.; Winkler; James, F.L. Decision Tree for selection of Artificial Lift method. In Proceedings of the SPE Production Operations Symposium, Oklahoma City, Oklahoma, 2–4 April 1995. [Google Scholar] [CrossRef]
  9. Bassett, L. Guidelines to successful dewatering of CBM wells. In Proceedings of the SPE Eastern Regional Meeting, Canton, OH, USA, 11–13 October 2006. [Google Scholar] [CrossRef]
  10. Khamehchi, E.; Mahdi, K.; Hassan, A. A case study to optimum selection of deliquification method for gas condensate well design: South Pars gas field. Ain Shams Eng. J. 2016, 7, 847–853. [Google Scholar] [CrossRef] [Green Version]
  11. Crnogorac, M.; Tanasijević, M.; Danilović, D. Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic. Energies 2020, 13, 1758. [Google Scholar] [CrossRef]
  12. Peter, O.O.; James, F.L. Artificial Lift Selection Strategy for the Life of a Gas Well with Some Liquid Production. In Proceedings of the SPE Annual Technical Conference and Exhibition, Denver, CO, USA, 21–24 September 2008. [Google Scholar] [CrossRef]
  13. Ma, H.; Han, G.; Peng, L.; Zhu, L.; Shu, J. Rock Thin Sections Identification Based on Improved Squeeze-and-Excitation Networks Model. Comput. Geosci. 2021, 152, 104780. [Google Scholar] [CrossRef]
  14. Bassett, L. Successful Strategies for Dewatering Wells Using ESP’s. In Proceedings of the SPE Eastern Regional Meeting, Charleston, WV, USA, 23–25 September 2009. [Google Scholar] [CrossRef]
  15. Peng, Y.; Ye, C.; Sun, F.; Wang, X.; Zhu, P.; Zhu, Q.; Wang, W. Drainage gas recovery technology for high-sulfur gas wells by a canned ESP system. Nat. Gas Ind. B 2018, 5, 452–458. [Google Scholar] [CrossRef]
  16. Veeken, C.; Ahmed, A.R.; Ahmed, A.H. Gas Well Deliquification Strategy in Sultanate Of Oman. In Proceedings of the SPE Conference at Oman Petroleum & Energy Show, Muscat, Oman, 21–23 March 2022. [Google Scholar] [CrossRef]
  17. Agus, Y.; Natasya, P. New Way of Method to Deal with ESP Problem. In Proceedings of the SPE Annual Caspian Technical Conference and Exhibition, Astana, Kazakhstan, 12–14 November 2014. [Google Scholar] [CrossRef]
  18. Hou, X.; Sun, Q.; Zhao, Q.; Zhu, L. Adjust the Position of the Check Valve to Reduce the Gas Lock Phenomenon of the Electrical Submersible Pump. China Pet. Chem. Stand. Qual. 2018, 93–94. [Google Scholar] [CrossRef]
  19. API. RP 11S4, Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations, 3rd ed.; American Petroleum Institute: Washington, DC, USA, 2002. [Google Scholar]
  20. Knudsen, B.R.; Foss, B. Shut-in based production optimization of shale-gas systems. Comput. Chem. Eng. 2013, 58, 54–67. [Google Scholar] [CrossRef] [Green Version]
  21. Alquwizani, S.A.; Shepler, R.A.; Zoraia, G.H.; Mohammed, N.K. Managing Tubing-Casing-Annulus in ESP Completions for Enhanced Wellbore Integrity and Improved ESP Runlife. In Proceedings of the SPE Middle East Artificial Lift Conference and Exhibition, Manama, Bahrain, 26–27 November 2014. [Google Scholar] [CrossRef]
  22. Xiao, J.J.; Roth, B.; Lastra, R.; Aramco, S.; Sarawaq, Y.; John, M. Cable Concept Evaluation for ESP Rigless Deployment. In Proceedings of the SPE Middle East Artificial Lift Conference and Exhibition, Manama, Kingdom of Bahrain, 30 November–1 December 2016. [Google Scholar] [CrossRef]
  23. Takacs, G. Electrical Submersible Pumps Manual, 2nd ed.; Gulf professional publishing: Cambridge, MA, USA, 2018; pp. 11–53. [Google Scholar]
  24. Williams, A.J. Use of New Design Tool Improves ESP Design Across the Life of Well in Unconventional Applications. In Proceedings of the SPE Gulf Coast Section Electric Submersible Pumps Symposium, The Woodlands, TX, USA, 13–17 May 2019. [Google Scholar] [CrossRef]
  25. Bruijnen, P.M. Nodal analysis by use of ESP intake and discharge pressure gauges. SPE Prod. Oper. 2016, 31, 76–84. [Google Scholar] [CrossRef]
  26. Iranzi, J.; Son, H.; Lee, Y.; Wang, J. A Nodal Analysis Based Monitoring of an Electric Submersible Pump Operation in Multiphase Flow. Appl. Sci. 2022, 12, 2825. [Google Scholar] [CrossRef]
  27. Powers, M.L. Special considerations for electric submersible pump applications in underpressured reservoirs. SPE Prod. Eng. 1992, 7, 301–306. [Google Scholar] [CrossRef]
  28. Mukati, K.; Wilson, O.; Morales, M.; Arias, B.; Clinton, T. Optimization of Well Start-Up Using Integrated Well and Electrical Submersible Pump Modeling. In Proceedings of the Offshore Technology Conference, Houston, TX, USA, 6–9 May 2019. [Google Scholar] [CrossRef]
Figure 1. D18 gas reservoir and location of Wells D4 and D8.
Figure 1. D18 gas reservoir and location of Wells D4 and D8.
Sustainability 15 01498 g001
Figure 2. The performance curve of QYDB116-30/3200.
Figure 2. The performance curve of QYDB116-30/3200.
Sustainability 15 01498 g002
Figure 3. The wellhead tubing and casing pressures during the pressure bleed-off procedure.
Figure 3. The wellhead tubing and casing pressures during the pressure bleed-off procedure.
Sustainability 15 01498 g003
Figure 4. Schematic diagram of the gas locking during the pump start-up process of Well D8.
Figure 4. Schematic diagram of the gas locking during the pump start-up process of Well D8.
Sustainability 15 01498 g004
Figure 5. Flow chart of the optimized well start-up procedure.
Figure 5. Flow chart of the optimized well start-up procedure.
Sustainability 15 01498 g005
Figure 6. Schematic diagram of gas–liquid distribution in the wellbore after optimization: (a) initial conditions; (b) pressure bleeding through casing choke; and (c) pressure bleeding through tubing choke.
Figure 6. Schematic diagram of gas–liquid distribution in the wellbore after optimization: (a) initial conditions; (b) pressure bleeding through casing choke; and (c) pressure bleeding through tubing choke.
Sustainability 15 01498 g006
Figure 7. Changes in wellhead pressures during the pressure bleed-off procedure before and after optimization: (a) before optimization; and (b) after optimization.
Figure 7. Changes in wellhead pressures during the pressure bleed-off procedure before and after optimization: (a) before optimization; and (b) after optimization.
Sustainability 15 01498 g007
Figure 8. Water production of Well D4 before and after hydraulic fracturing.
Figure 8. Water production of Well D4 before and after hydraulic fracturing.
Sustainability 15 01498 g008
Figure 9. VLP and IPR curves of D4.
Figure 9. VLP and IPR curves of D4.
Sustainability 15 01498 g009
Figure 10. Nodal analysis diagram of Well D4 after hydraulic fracturing.
Figure 10. Nodal analysis diagram of Well D4 after hydraulic fracturing.
Sustainability 15 01498 g010
Table 1. Well Performance Summary.
Table 1. Well Performance Summary.
ParametersWell D4Well D8
PVTWater Gravity (Kg/m3)10201014
Gas Specific Gravity0.6030.655
BHT (Deg C)107.6113.3
GLR (sm3/m3)82.185.9
Inflow CharacteristicsReservoir Pressure (MPa)31.131.5
PI (sm3/d/MPa)0.871.9
Well
structure
Tubing ID (mm)6262
Tubing OD (mm)7373
Casing ID (mm)121.36121.36
ESP Intake Depth (m TVD)31023098
Reservoir Depth (m TVD)3562–36443577–3621
Table 2. ESP System Performance Data Used for D4 and D8.
Table 2. ESP System Performance Data Used for D4 and D8.
ModelNameplate
Frequency
Nameplate
Voltage
Nameplate
Current
Nameplate
Rate
Nameplate
Head
QYDB116-30/3200C50 Hz1420 V38.2 A30 m3/d3200 m
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Wang, X.; Feng, X.; Liu, J.; Hong, J.; Yao, J.; Liu, H.; Liu, Z.; Han, G. Optimization of the Well Start-Up Procedure and Operating Parameters for ESP Gas Well Dewatering. Sustainability 2023, 15, 1498. https://doi.org/10.3390/su15021498

AMA Style

Wang X, Feng X, Liu J, Hong J, Yao J, Liu H, Liu Z, Han G. Optimization of the Well Start-Up Procedure and Operating Parameters for ESP Gas Well Dewatering. Sustainability. 2023; 15(2):1498. https://doi.org/10.3390/su15021498

Chicago/Turabian Style

Wang, Xiaolei, Xuezhang Feng, Jinbo Liu, Jiangling Hong, Jinsong Yao, Honglei Liu, Zelin Liu, and Guoqing Han. 2023. "Optimization of the Well Start-Up Procedure and Operating Parameters for ESP Gas Well Dewatering" Sustainability 15, no. 2: 1498. https://doi.org/10.3390/su15021498

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop