Next Article in Journal
Potential Impacts of Industrialization on Coastal Fresh Groundwater Resources in Bangladesh
Next Article in Special Issue
Economic Growth, CO2 Emissions Quota and Optimal Allocation under Uncertainty
Previous Article in Journal
Knowledge Level and Consumption Behavior of Native Plants, Meats, and Drinking Waters with High Fluoride Concentrations about the Relation to the Potential Health Risk of Fluoride in Lamphun Province Thailand: A Case Study
Previous Article in Special Issue
Design and Implementation of Machine Vision-Based Quality Inspection System in Mask Manufacturing Process
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Performance Evaluation of a Novel Pilot-Scale Wet Electrostatic Precipitator in a Bio-Drying-Assisted Solid Recovered Fuel (SRF) Generation Plant: Particulate Matter (PM) Collection Efficiency

1
Department of Biological and Environmental Science, Dongguk University, 32 Dongguk-ro, Ilsandong-gu, Goyang 10326, Korea
2
Jinenertech, 21 Gukhoe-daero 62-gil, Yeongdeungpo-gu, Seoul 07236, Korea
*
Author to whom correspondence should be addressed.
Sustainability 2022, 14(14), 8702; https://doi.org/10.3390/su14148702
Submission received: 9 June 2022 / Revised: 12 July 2022 / Accepted: 13 July 2022 / Published: 15 July 2022

Abstract

:
The production of solid recovered fuel (SRF) from sewage sludge has been credited with facilitating Korea’s waste management shift toward a resource circular economy. In this study, a novel pilot-scale wet electrostatic precipitator (WESP) was developed and installed in a bio-drying-assisted solid recovered fuel (SRF) generation plant for the first time. To investigate the performance of the novel WESP, various sizes of particulate matter, i.e., total particle matter (PM), particle matter smaller than 10 μm (PM10), and particle matter smaller than 0.1 μm (PM0.1), collection efficiencies were evaluated and demonstrated promising performances. Under optimal operating conditions (flow rate of 5 m3/min and an applied voltage of 30 kV), 99.76% PM and 91% PM10 collection efficiencies were achieved, and the PM concentration was 0.16 mg/m3, which met the exhaust emission standard. However, a dramatic increase in PM0.1 was observed and could be explained by the break-up theory, binary homogenous nucleation, and ion-induced nucleation. The experimental findings could serve as useful information to understand the WESP system.

1. Introduction

Rapid population growth and economic development have undoubtedly impacted energy consumption, waste generation, and environmental pollution, all of which are hampering the sustainable development of the world [1]. In addition, the growing threat of climate change has forced countries to harmonize economic development with environmental concerns. Sustainable development has been suggested as an optimal strategy to achieve coexistence rather than trade-off between economic development and environmental protection by the application of so-called smart and/or eco-friendly technologies [2,3,4,5,6]. Among them, renewable energy production and valuable resource recovery from various wastes have played pivotal roles in reducing fossil fuel demands [7].
To address this sustainability crisis, the Korean government announced the “Renewable Energy 3020 Plan” to increase the proportion of renewable energy generation from 2.2% in 2016 to 20% in 2030 [8]. To achieve these goals, a circular economy and resource security have become the priorities of Korea’s environmental policy [9]. The Framework Act on Resource Circulation (FARC) became effective on 1 January 2018 and aims to “control waste generation with efficient use of resources and promote the circular use and proper disposal of waste, thereby minimizing natural resources and energy exploitation, preserving the environment, and achieving a sustainable resource-circulating society. Through the FARC, South Korea aims to shift from a pure waste management approach toward a new paradigm, emphasizing a resource circulating society” [9].
The annual production of sewage sludge in South Korea was approximately 4.22 million tons in 2020 and is expected to increase to 5.4 million tons in 2025 [10]. With the increasing generation of sewage sludge, various environmental processes (incineration, composting, anaerobic digestion, etc.) have been applied to sewage disposal since the “London protocol’’ agreement, which prohibits the ocean dumping of sewage sludge [11]. Due to the FARC act, the production of solid recovered fuel (SRF) from sewage sludge has been recently widely recognized as a promising alternative process since generated SRF can be used as a co-firing fuel in power plants, reducing carbon emissions and fossil fuel usage [12,13].
To exploit SRF as a renewable fuel, first it needs to meet the net calorific standard (>3000 kcal/kg) in South Korea. Thus, the water content of sewage sludge should be reduced to below 10~15% [14,15,16]. The most common way to reduce the water content in sewage sludge is by using the direct heating method. However, the high operational costs of heating sources have been considered one of the biggest bottlenecks to this method. To overcome this, the bio-drying process, a promising method for reducing the water content in sewage sludge with minimum aerobic degradation, has been developed and successfully demonstrated [17]. The main mechanism of bio-drying is convective evaporation, which utilizes metabolic heat generated from the degradation of organic matter. Then, the removed water is transported by airflow to exhaust gas and finally collected as water condensate [18]. The effective moisture reduction by the bio-drying process was demonstrated in SRF generation and other systems by controlling air replacement and the flow rate [19].
Various sizes of suspended particles are known to be generated during SRF production, particularly in the drying process. To prevent environmental pollution, exhaust gas from the drying process must undergo a proper treatment process [20]. In the case of exhaust gas from the direct heating drying process, a bag filter has been widely used because of its simplicity and effectiveness. However, exhaust gas from the bio-drying process is fully saturated, so a conventional bag filter cannot achieve higher particle collection efficiency due to clogging issues. Thus, a wet electrostatic precipitator (WESP) was developed to treat the humid exhaust gas and sticky particles.
The WESP, utilizing water flow and an electrode, is known as a cost-effective technology for collecting various-sized particles from the humid exhaust gas and has been mostly applied to power plants and factories equipped with pyrolysis processes [21]. Unlike dry ESPs, back-corona discharge and particle re-entrainment can be avoided because the electrodes in WESPs are cleaned continuously by a water spray [22]. Previous studies showed that WESPs could effectively collect the particles in exhaust gas under various conditions, with 90–97% and up to 99% collection efficiencies in single-stage and two-stage processes, respectively [21,23,24].
A novel pilot-scale WESP successfully developed by Jinenertech (South Korea) was installed in a pilot-scale bio-drying-assisted SRF generation plant for the first time. To demonstrate the performance of the novel WESP, this study investigated the particle collection efficiency of the novel WESP. Two commonly used indices, total particle matter (PM) and particle matter smaller than 10 μm (PM10) were applied to evaluate the performance of the novel WESP. To determine the optimal operating conditions, PM and PM10 collection efficiencies were measured at various conditions at voltages of 15–30 kV and flow rates of 1, 3, and 5 m3/min. In addition, particle size analysis was conducted to investigate changes in particle number distribution based on particle sizes in the exhaust gas after WESP treatment.

2. Materials and Methods

2.1. Wet Electrostatic Precipitator

The novel pilot-scale WESP was developed for saturated gas pre-treatment to meet the exhaust emission standard and patented in South Korea with registration number 10–2347105. As shown in Figure 1, the WESP was designed for exhaust gas to first undergo a dual cyclone to remove the coarse and high-density particles, and then the exhaust gas was moved to electrostatic chambers. The WESP consisted of nine discharge and precipitation electrodes and each set of electrodes was placed in each of the nine chambers. When negative voltage was applied to the discharge electrodes, electric corona discharge ionized the particles in the exhaust gas, and they were moved toward the precipitation electrode due to electrostatic forces, as shown in Figure 1C, and finally washed down by a water sprayer at the top of each chamber. An additional water sprayer was installed at the bottom of the chamber, facing upward and downward, to increase particle collection efficiency. The water at the bottom of the chamber was recycled to the water sprayers and discharged regularly to maintain high particle collection efficiency. The applied voltage of the WESP ranged from 0 to 30 kV and current was measured at each voltage at a flow rate of 1, 3, and 5 m3/min to determine the voltage–current relationship.

2.2. A Pilot-Scale Bio-Drying-Assisted SRF Generation Plant with the WESP

The novel WESP was installed at a pilot-scale bio-drying-assisted SRF generation plant using sewage sludge with a capacity of 5 tons/day with 10–14 days of retention time, located in C county, South Korea. As illustrated in Figure 2, the plant consisted of bio-drying, heat-drying, palletization, and wet scrubbers. For the experiments, sewage sludge was collected from a wastewater treatment plant located in B city, South Korea. The chemical characteristics of the sewage are given in Table 1. The sludge was mixed with a bulking agent and an amendment to facilitate subsequent processing. Then, the sludge passed consecutively through a two-stage drying process. The water content was decreased to 35% and 13–15% after bio-drying and heat-drying, respectively. The dried sludge was then transferred to the palletization process, where the sludge’s final moisture content was reduced to 10% (Figure 2). The exhaust gas containing various-sized particles from the bio-drying and heat-drying processes was first transferred to the WESP and then to wet scrubbers to meet the exhaust emission standard.

2.3. PM Collection Efficiency Test

A silica thimble filter (R88, Advantec, Tokyo, Japan) with an inner diameter of 22 mm, an outer diameter of 25 mm, and a height of 90 mm was used to collect the total PM. The thimble filter could withstand temperatures of up to 1000 °C and had a collection efficiency of more than 99.9% (0.3 μm DOP%). The test was carried out according to the standard method set by the Ministry of Environment of South Korea [25]. Before the experiment, the thimble filter was dried for 2 h at 105 °C in a heat dryer, and then its weight was measured. After that, a thimble filter was connected to the HJD260V 740 mmHg vacuum pump (Hanjin Air, South Korea) by a filter holder. Samples were taken from both the inlet and outlet of the WESP (Figure 3). Four hundred liters of exhaust gas were collected by the vacuum pump, and then the filter was dried for 2 h at 105 °C to determine the weight. The total PM collection efficiency test was carried out at voltages of 15–30 kV and flow rates of 1, 3, and 5 m3/min. The total PM collection efficiency was calculated using Equation (1):
PM   collection   efficiency   ( % )   =   [ { W 1 W 2 V }     { ( W 3 W 4 V } ] / { ( W 1 W 2 V }     100 W 1   =   weight   of   the   inlet   ceramic   cup   after   collection   ( g ) W 2   =   weight   of   the   inlet   ceramic   cup   before   collection   ( g ) W 3   =   weight   of   the   outlet   ceramic   cup   after   collection   ( g ) W 4   =   weight   of   the   outlet   ceramic   cup   before   collection   ( g ) V   =   total   collected   gas   ( L )

2.4. PM10 Collection Efficiency Test

According to the standard method set by the Ministry of Environment of Korea for air pollution tests [26], PM10 was collected in a glass jar (240 mL) filled with distilled water for microparticle size analysis (PSA). The 400 L of gas collected from the WESP (Figure 3) was then directly injected into the glass jar from an upward direction. A ceramic cup was dried in a heat dryer for 12 h at 105 °C and its weight was measured. The sample was filtered through filter paper (Whatman, Buckinghamshire, United Kingdom) to selectively separate PM10. The filtered water was collected immediately in a ceramic cup and dried for 12 h before measuring to ensure that all water had evaporated. The PM10 collection efficiency test was carried out at voltages of 15–30 kV and flow rates of 1, 3, and 5 m3/min. The PM10 collection efficiency was calculated according to Equation (2):
PM 10   collection   efficiency   ( % )   =   [ { W 1 W 2 V }     { ( W 3 W 4 V } ] / { ( W 1 W 2 V }     100 W 1   =   weight   of   the   inlet   ceramic   cup   after   collection   ( g ) W 2   =   weight   of   the   inlet   ceramic   cup   before   collection   ( g ) W 3   =   weight   of   the   outlet   ceramic   cup   after   collection   ( g ) W 4   =   weight   of   the   outlet   ceramic   cup   before   collection   ( g ) V   =   total   collected   gas   ( L )
In addition, particle size analysis was performed on the non-filtered samples using a Helos Particle Size Analyzer (Beckman, CA, USA) to monitor the changes in particle distribution after the WESP process at 30 kV with a flow rate of 5 m3/min. The analyzed data were then converted to depict the particle number distribution at three different particle size ranges (<0.1 μm, 0.1–2.5 μm, and >2.5 μm) with a focus on monitoring particle matter smaller than 2.5 μm (PM2.5).

3. Result and Discussion

3.1. Voltage–Current Relationship in the Novel Pilot-Scale WESP

The relationship between the current and applied voltage of the discharge electrode is shown in Figure 4 and the highest current (8.4 mA) was observed at an applied voltage of 30 kV and 1 m3/min flow rate. No current was measured under an applied voltage of 10 kV, suggesting that current could only be generated when an electric field of sufficient strength was emitted. As the applied voltage increased from 15 kV to 25 kV, the current remained around 2 mA at various flow rates, whereas a significant increase in current was observed at 30 kV at all flow rates. Similar findings were reported by Yang et al. [27] and Karwat et al. [28], who observed that a rod discharge electrode generated low current until applied voltages of 25 kV, while the current-producing capacity sharply increased between 25 and 30 kV.
The electrode current in a WESP is known to depend upon its contours, the voltage supply, and the current efficiency of the voltage supplier [28]. In addition, the shape of the discharge electrode can directly affect the current, so different currents can be generated under the same applied voltage. Thus, the choice and shape of the discharge electrode play important roles in PM collection efficiency and operating cost. Karwat et al. [28] revealed that a spike-type electrode showed the highest current among vane-edged and wire-, square-, and ribbon-shaped electrodes. According to Yang et al. [27], the pin-shaped electrode showed the highest current among pin-, sawtooth-, and rod-shaped electrodes. However, similar particle collection efficiencies were achieved regardless of the electrode shape when the applied current was higher than 2.0 mA. Even though our novel WESP had a rod-shaped discharge electrode, higher collection efficiencies at various flow rates could be expected since currents higher than 2 mA were observed at more than 15 kV of applied voltage.

3.2. PM Collection Efficiency

A thimble filter was used to evaluate the PM collection efficiency. As seen in Figure 5, a significant visual difference was observed after the application of the novel WESP. The PM collection efficiency ranged from 97.3 to 99.67% at a flow rate of 1–5 m3/min and applied voltages of 15–30 kV, as shown in Figure 6. The highest PM collection efficiency (99.67%) was achieved at a flow rate of 5 m3/min and an applied voltage of 30 kV. The achievement of a higher PM collection efficiency at a higher flow rate, except at an applied voltage of 25 kV, was unexpected. Given that the PM collection efficiency can be commonly explained by the current function, the current in the WESP was 8.4 mA, 7.8 mA, and 7.5 mA at flow rates of 1 m3/min, 3 m3/min, and 5 m3/min, respectively, under an applied voltage of 30 kV. In addition, an increase in flow rate led to a decrease in residence time and might cause a substantial decrease in the collision probability between PM and ions. Similar results were reported by Steiner et al. [29] showing better collection efficiency of particle sizes between 300 nm and 350 nm at 1.2 m/s than at 1.0 m/s. The results indicated that the PM collection efficiency was not a simple function of the relationship between the applied voltage and the current, but that other factors need to be considered for optimizing a WESP. As stated by Oliveira and Guerra [30], “the existence of several operational and geometric parameters makes electrostatic precipitation a highly complex process, so it is difficult to compare the results of different studies in this field.” The PM concentrations in the WESP outlet ranged from 8.17 to 0.16 mg/m3 at various operating conditions, as shown in Figure 7, and the lowest PM concentration was achieved at a flow rate of 5 m3/min and an applied voltage of 30 kV. These results demonstrated the promising performance of the novel WESP, which met the exhaust emission standard (<15 mg/Sm3) in South Korea. Similarly, Yang et al. [27] reported the reduction in PM concentration to 1.18 mg/m3 using a WESP, and further significant reductions up to 0.43 mg/m3 were achieved by the combination of a WESP and a pre-charger in a full-scale coal-fired power plant. To guarantee PM concentrations of less than 1.0 mg/m3 in a full-scale plant, our novel WESP should consider the installation of a pre-charger in the case of a performance drop after scaling-up.
To control the odor of exhaust gas, wet scrubbers were installed and operated in our pilot-scale bio-drying-assisted SRF generation plant. Diluted sulfuric acid (H2SO4) and sodium hypochlorite (NaClO) were mainly used to neutralize and oxidize the basic exhaust gas, respectively. After the installation of the novel WESP, the average chemical consumption was roughly halved (data not shown), suggesting that the novel WESP not only enabled PM collection, but also reduced odorous gas via water spraying, thereby achieving cost-effective operation.

3.3. PM10 Collection Efficiency

The overall PM10 collection efficiency showed different trends compared with PM collection efficiency, as seen in Figure 8. Similar to the PM collection efficiency, however, the highest PM10 collection efficiency of approx. 91% was achieved at a flow rate of 5 m3/min and an applied voltage of 30 kV. Reportedly, smaller-sized PM was more toxic and could be transferred farther and deposited to the lower lung lobes, possibly causing respiratory issues [31]. To monitor changes in PM size distribution after the novel WESP application, a particle size analysis was conducted. Given that most PM concentrations in the WESP outlet were in the PM size range smaller than 2.5 μm (PM2.5) [32], the particle number distribution was presented based on three ranges (<0.1 μm, 0.1–2.5 μm, and >2.5 μm), as shown in Figure 9. The particle number distribution analysis showed the effectiveness of the novel WESP for various PM ranges. However, the amount of PM with particle sizes smaller than <0.1 μm (PM0.1) was dramatically increased after the application of the novel WESP. This phenomenon could presumably be explained by the break-up theory suggested by Kim and Dunn [33], dealing with the generation of progeny droplets by an external electric field. They found that numerous smaller droplets were generated from a 2.24 mm-diameter parent drop under an applied electric field (~10 kV/cm). Similarly, in this study, PM0.1 could be generated via the breaking-up of PM2.5 during a 30 kV application. It could also be explained by the generation of nanoparticles through binary homogenous nucleation and ion-induced nucleation in corona discharge [34]. In this theory, components of the exhaust gas such as SOx and NOx affect the generation of nano-sized particles during electrode discharge. A high proportion of SOx and NOx was observed in exhaust gas from the co-combustion of forest biomass and sewage sludge [35] and the majority seemed to originate from sewage sludge. Thus, SOx and NOx generated during bio-drying and heat-drying in this study possibly affected the generation of PM0.1. Even though our novel WESP showed 99.67% PM collection efficiency and met the exhaust emission standard at optimal operating conditions, further research is needed to increase the collection efficiency of PM0.1 for better future applications. Economic analysis should also be conducted considering increased electric usage for the novel WESP and reduced chemical usage in wet scrubbers.

4. Conclusions

The novel pilot-scale WESP developed in this study was installed in a pilot-scale bio-drying-assisted SRF generation plant for the first time. To investigate the performance of the novel WESP, PM and PM10 collection efficiencies were evaluated and demonstrated promising performances. Under optimal operating conditions (flow rate of 5 m3/min and an applied voltage of 30 kV), 99.76% PM and 91% PM10 collection efficiencies were achieved, and the PM concentration was 0.16 mg/m3, which met the exhaust emission standard in South Korea. However, a dramatic increase in PM0.1 was observed, which could be explained by the break-up theory, binary homogenous nucleation, and ion-induced nucleation. To enhance the novel WESP, further research needs to focus on increasing PM0.1 collection efficiency and economic analysis of the novel WESP applications.

Author Contributions

Investigation, H.J., Y.P. and U.H.; Resources, K.K., D.H.C. and G.J.P.; Writing—original draft, M.-S.K. and A.T.; Writing—review & editing, S.-K.C. All authors have read and agreed to the published version of the manuscript.

Funding

This research was supported by the Ministry of Trade, Industry, and Energy’s “Plan-ministerial Linked Technology Commercialization Research Project”, and we appreciate the contribution (task number: P0018244).

Conflicts of Interest

The authors declare that they have no conflict of interest.

References

  1. Ozcan, B.; Tzeremes, P.G.; Tzeremes, N.G. Energy consumption, economic growth and environmental degradation in OECD countries. Econ. Model. 2020, 84, 203–213. [Google Scholar] [CrossRef]
  2. Shrivastava, P.; Stafford Smith, M.; O’Brien, K.; Zsolnai, L. Transforming Sustainability Science to Generate Positive Social and Environmental Change Globally. One Earth 2020, 2, 329–340. [Google Scholar] [CrossRef] [PubMed]
  3. Erdiwansyah, M.; Husin, A.; Nasaruddin, M.Z.; Muhibbuddin, A. A critical review of the integration of renewable energy sources with various technologies. Prot. Control Mod. Power Syst. 2021, 6, 3. [Google Scholar] [CrossRef]
  4. Park, S.W.; Seo, Y.C.; Lee, S.Y.; Yang, W.S.; Oh, J.H.; Gu, J.H. Development of 8 ton/day gasification process to generate electricity using a gas engine for solid refuse fuel. Waste Manag. 2020, 113, 186–196. [Google Scholar] [CrossRef]
  5. Razmjoo, A.; Gakenia Kaigutha, L.; Vaziri Rad, M.A.; Marzband, M.; Davarpanah, A.; Denai, M. A Technical analysis investigating energy sustainability utilizing reliable renewable energy sources to reduce CO2 emissions in a high potential area. Renew. Energy 2021, 164, 46–57. [Google Scholar] [CrossRef]
  6. Wang, Y.; Yuan, Z.; Tang, Y. Enhancing food security and environmental sustainability: A critical review of food loss and waste management. Resour. Environ. Sustain. 2021, 4, 100023. [Google Scholar] [CrossRef]
  7. Debrah, J.K.; Vidal, D.G.; Dinis, M.A.P. Raising awareness on solid waste management through formal education for sustainability: A developing countries evidence review. Recycling 2021, 6, 6. [Google Scholar] [CrossRef]
  8. Martin-Rios, C.; Hofmann, A.; Mackenzie, N. Sustainability-oriented innovations in food waste management technology. Sustainability 2021, 13, 210. [Google Scholar] [CrossRef]
  9. Lee, K.; Cha, J. Towards improved circular economy and resource security in South Korea. Sustainability 2021, 13, 17. [Google Scholar] [CrossRef]
  10. Sewage Information System. Available online: www.hasudoinfo.or.kr (accessed on 2 March 2022).
  11. Hong, J.H.; Kim, J.; Son, W.; Shin, H.; Kim, N.; Lee, W.K.; Kim, J. Long-term energy strategy scenarios for South Korea: Transition to a sustainable energy system. Energy Policy 2019, 127, 425–437. [Google Scholar] [CrossRef]
  12. Lee, J.G. Yearbook of International Environmental Law; Oxford University Press: Oxford, UK, 2018; Volume 29, pp. 345–355. [Google Scholar] [CrossRef]
  13. Ramos, A.; Monteiro, E.; Silva, V.; Rouboa, A. Co-gasification and recent developments on waste-to-energy conversion: A review. Renew. Sustain. Energy Rev. 2018, 81, 380–398. [Google Scholar] [CrossRef]
  14. Chae, J.S.; Kim, S.W.; Lee, J.H.; Joo, J.C.; Ohm, T.I. Combustion characteristics of solid refuse fuel derived from mixture of food and plastic wastes. J. Mater. Cycles Waste Manag. 2020, 22, 1047–1055. [Google Scholar] [CrossRef]
  15. Pawlak-Kruczek, H.; Wnukowski, M.; Krochmalny, K.; Kowal, M.; Baranowski, M.; Zgóra, J.; Czerep, M.; Ostrycharczyk, M.; Niedzwiecki, L. The staged thermal conversion of sewage sludge in the presence of oxygen. J. Energy Resour. Technol. Trans. ASME 2019, 141, 1–8. [Google Scholar] [CrossRef]
  16. Połomka, J.; Jędrczak, A. RDF from Compost-Like-Output’s Produced in the MBT installation in the case of Marszów, Poland. Energies 2020, 13, 4353. [Google Scholar] [CrossRef]
  17. Sarc, R.L. Manufacturing of Solid Recovered Fuels (SRF) for Energy Recovery Processes. Waste Manag. 2016, 6, 401–416. [Google Scholar]
  18. Park, J.R.; Lee, D.H. Effect of Aeration Strategy on Moisture Removal in Bio-Drying Process with Auto-Controlled Aeration System. Dry. Technol. 2021, 1–15. [Google Scholar] [CrossRef]
  19. Ham, G.Y.; Lee, D.H.; Matsuto, T.; Tojo, Y.; Park, J.R. Simultaneous Effects of Airflow and Temperature Increase on Water Removal in Bio-Drying. J. Mater. Cycles Waste Manag. 2020, 224, 1056–1066. [Google Scholar] [CrossRef]
  20. He, P.; Zhao, L.; Zheng, W.; Wu, D.; Shao, L. Energy Balance of a Biodrying Process for Organic Wastes of High Moisture Content: A Review. Dry. Technol. 2013, 31, 132–145. [Google Scholar] [CrossRef]
  21. Cao, R.; Tan, H.; Xiong, Y.; Mikulčić, H.; Vujanović, M.; Wang, X.; Duić, N. Improving the removal of particles and trace elements from coal-fired power plants by combining a wet phase transition agglomerator with wet electrostatic precipitator. J. Clean. Prod. 2017, 161, 1459–1465. [Google Scholar] [CrossRef]
  22. Bologa, A.; Paur, H.R.; Seifert, H.; Wäscher, T.; Woletz, K. Novel wet electrostatic precipitator for collection of fine aerosol. J. Electrostat. 2009, 67, 150–153. [Google Scholar] [CrossRef]
  23. Lin, G.Y.; Tsai, C.J.; Chen, S.C.; Chen, T.M.; Li, S.N. An efficient single-stage wet electrostatic precipitator for fine and nanosized particle control. Aerosol Sci. Technol. 2010, 44, 38–45. [Google Scholar] [CrossRef]
  24. Igarashi, M.; Hayafune, Y.; Sugamiya, R.; Nakagawa, Y.; Makishima, K. Pyrolysis of municipal solid waste in Japan. J. Energy Resour. Technol. Trans. ASME 1984, 106, 377–382. [Google Scholar] [CrossRef]
  25. Ministry of Environment. South Korea, Clean Air Conservation Act. Article 7, Ministry of Environment Notice 2011-132, Official Air Pollution Test Method; South Korea Ministry of Environment: Seoul, Korea, 2011.
  26. Ministry of Environment, KEITI. Report on Domestic IP Environment Trends. Fine Dust in Exhaus Gas Measurement; Ministry of Environment, KEITI: Seoul, Korea, 2021. [Google Scholar]
  27. Yang, Z.; Zheng, C.; Liu, S.; Guo, Y.; Liang, C.; Wang, Y.; Hu, D.; Gao, X. A combined wet electrostatic precipitator for efficiently eliminating fine particle penetration. Fuel Process. Technol. 2018, 180, 122–129. [Google Scholar] [CrossRef]
  28. Karwat, B.; Machnik, R.; Niedźwiedzki, J.; Nogaj, M. Selecting operating parameters of an electrostatic precipitator decreasing emission of solid fuels fly ashes. Eksploat. Niezawodn. 2018, 20, 495–501. [Google Scholar] [CrossRef]
  29. Steiner, D.; Höflinger, W.; Lisberger, M. Influence of Gas Distribution, Field Velocity and Power Supply Technique for Small Scale Industrial Esp’s. Int. J. Plasma Environ. Sci. Technol. 2011, 5, 124–129. [Google Scholar]
  30. de Oliveira, A.E.; Guerra, V.G. Effect of low gas velocity on the nanoparticle collection performance of an electrostatic precipitator. Sep. Sci. Technol. 2019, 54, 1211–1220. [Google Scholar] [CrossRef]
  31. Wang, X.; Xu, Z.; Su, H.; Ho, H.C.; Song, Y.; Zheng, H.; Hossain, M.Z.; Khan, M.A.; Bogale, D.; Zhang, H.; et al. Ambient Particulate Matter (PM1, PM2.5, PM10) and Childhood Pneumonia: The Smaller Particle, the Greater Short-Term Impact? Sci. Total Environ. 2021, 772, 145509. [Google Scholar] [CrossRef]
  32. Wang, K.; Yang, L.; Li, J.; Sheng, Z.; He, Q.; Wu, K. Characteristics of condensable particulate matter before and after wet flue gas desulfurization and wet electrostatic precipitator from ultra-low emission coal-fired power plants in China. Fuel 2020, 278, 118206. [Google Scholar] [CrossRef]
  33. Kim, O.V.; Dunn, P.F. Controlled production of droplets by in-flight electrospraying. Langmuir 2010, 26, 15807–15813. [Google Scholar] [CrossRef]
  34. Zukeran, A.; Sawano, H.; Yasumoto, K. Collection characteristic of nanoparticles emitted from a diesel engine with residual fuel oil and light fuel oil in an electrostatic precipitator. Energies 2019, 12, 3321. [Google Scholar] [CrossRef] [Green Version]
  35. Calvo, A.I.; Tarelho, L.A.C.; Teixeira, E.R.; Alves, C.; Nunes, T.; Duarte, M.; Coz, E.; Custodio, D.; Castro, A.; Artiñano, B.; et al. Particulate emissions from the co-combustion of forest biomass and sewage sludge in a bubbling fluidised bed reactor. Fuel Process. Technol. 2013, 114, 58–68. [Google Scholar] [CrossRef]
Figure 1. Details of the novel pilot-scale WESP: (A) blueprint (B) picture of the front view, and (C) working principle of the discharge and precipitation electrode.
Figure 1. Details of the novel pilot-scale WESP: (A) blueprint (B) picture of the front view, and (C) working principle of the discharge and precipitation electrode.
Sustainability 14 08702 g001aSustainability 14 08702 g001b
Figure 2. Process flow of a bio-drying-assisted SRF generation plant.
Figure 2. Process flow of a bio-drying-assisted SRF generation plant.
Sustainability 14 08702 g002
Figure 3. Sampling port of the WESP: (A) sampling locations for the inlet and outlet and (B) sampling port.
Figure 3. Sampling port of the WESP: (A) sampling locations for the inlet and outlet and (B) sampling port.
Sustainability 14 08702 g003
Figure 4. Voltage–current relationships at different flow rates.
Figure 4. Voltage–current relationships at different flow rates.
Sustainability 14 08702 g004
Figure 5. Picture of a thimble filter tested with the novel WESP (A) at the inlet and (B) at the outlet.
Figure 5. Picture of a thimble filter tested with the novel WESP (A) at the inlet and (B) at the outlet.
Sustainability 14 08702 g005
Figure 6. PM collection efficiency at various operating conditions.
Figure 6. PM collection efficiency at various operating conditions.
Sustainability 14 08702 g006
Figure 7. PM concentration in WESP outlet at various operating conditions.
Figure 7. PM concentration in WESP outlet at various operating conditions.
Sustainability 14 08702 g007
Figure 8. PM10 collection efficiency at various operating conditions.
Figure 8. PM10 collection efficiency at various operating conditions.
Sustainability 14 08702 g008
Figure 9. Particle number distribution based on size in the inlet and outlet at a flow rate of 5 m3/min and an applied voltage of 30 kV.
Figure 9. Particle number distribution based on size in the inlet and outlet at a flow rate of 5 m3/min and an applied voltage of 30 kV.
Sustainability 14 08702 g009
Table 1. Characteristics of sewage waste.
Table 1. Characteristics of sewage waste.
ParametersValue
Water content (%)81.8
Combustible volatile matter (%)14.4
Ash content (%)3.8
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Kim, M.-S.; Jo, H.; Park, Y.; Han, U.; Thapa, A.; Kim, K.; Choi, D.H.; Park, G.J.; Cho, S.-K. Performance Evaluation of a Novel Pilot-Scale Wet Electrostatic Precipitator in a Bio-Drying-Assisted Solid Recovered Fuel (SRF) Generation Plant: Particulate Matter (PM) Collection Efficiency. Sustainability 2022, 14, 8702. https://doi.org/10.3390/su14148702

AMA Style

Kim M-S, Jo H, Park Y, Han U, Thapa A, Kim K, Choi DH, Park GJ, Cho S-K. Performance Evaluation of a Novel Pilot-Scale Wet Electrostatic Precipitator in a Bio-Drying-Assisted Solid Recovered Fuel (SRF) Generation Plant: Particulate Matter (PM) Collection Efficiency. Sustainability. 2022; 14(14):8702. https://doi.org/10.3390/su14148702

Chicago/Turabian Style

Kim, Min-Sang, Hongmok Jo, Yeongmi Park, Uijeong Han, Ajay Thapa, Kyunghyun Kim, Du Hyeong Choi, Gwang Jo Park, and Si-Kyung Cho. 2022. "Performance Evaluation of a Novel Pilot-Scale Wet Electrostatic Precipitator in a Bio-Drying-Assisted Solid Recovered Fuel (SRF) Generation Plant: Particulate Matter (PM) Collection Efficiency" Sustainability 14, no. 14: 8702. https://doi.org/10.3390/su14148702

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop