Next Article in Journal
The Approach of SMEs to Using the Customer Databases and CRM: Empirical Study in the Slovak Republic
Next Article in Special Issue
Application of Reliability Analysis for Risk Ranking in a Levee Reconstruction Project
Previous Article in Journal
Multiple Facets of Migration Research: Key Questions, Topics, and Avenues yet to Be Explored
Previous Article in Special Issue
A Critical Design Structure Method for Project Schedule Development under Rework Risks
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk

1
Faculty of Civil Engineering, Cracow University of Technology, 31-155 Krakow, Poland
2
Faculty of Civil and Environmental Engineering, Poznan University of Technology, 60-965 Poznan, Poland
*
Author to whom correspondence should be addressed.
Sustainability 2020, 12(1), 226; https://doi.org/10.3390/su12010226
Submission received: 4 December 2019 / Revised: 22 December 2019 / Accepted: 23 December 2019 / Published: 26 December 2019
(This article belongs to the Special Issue Sustainability and Risks in Construction Management)

Abstract

:
The paper discusses issues related to life cycle costs in construction. Life cycle cost is a key element in the assessment of environmental sustainability in construction and it provides a tool for the economic evaluation of alternative sustainability options exhibiting different capital, operating costs or resource usage. The authors reviewed selected models of estimating life cycle costs in construction, drew attention to the complex mathematical models developed so far, namely those which take into account only financial risks and those which involve the possibility of the influence of other risk factors and described the main assumptions accompanying the original model for estimating the whole life costs of buildings, including: reasons for choosing theory of possibility, division and parametrization of input data. The aim of this paper is to confirm the validity of the model structure assumptions adopted by the authors by comparing the originally selected fuzzy approach to calculating life cycle costs taking into account the risk with the probabilistic approach, as well as indicating the domain in which the probabilistic approach will complement the fuzzy approach chosen by the authors. The paper presents a comparison analysis of two approaches used in the authors’ model, a fuzzy and a probabilistic approach, recommended by the ISO standard 15686-5:2008. The authors used the Oracle Crystall Ball software in their simulations.

1. Introduction

Economic life cycle costs analysis (LCCA) is an increasingly common subject of consideration of scientists. As a result of the research conducted so far, several original methods or models for estimating life cycle costs in construction have been developed, both for LCCA for buildings and constructed assets [1,2,3,4,5], and for building materials and components [6,7,8,9]. Moreover, the methods used in the economic calculation to compare the financial outlays were subject to certain modifications, which enabled their adaptation to the needs of LCCA implementation [6,10,11,12,13,14]. It is also noted that the issue of LCCA is raised in contemporary publications dealing with the development of Building Information Modelling (BIM) technology for building operation, which would include planning renovation, refurbishment and inspection procedures and maintenance activities, using 7D BIM tools based on product life cycle management (PLM) [15].
In general, the LCCA can be performed using the so-called simple or complex method. The application of the simple method is appropriate only in the case of simple comparisons which serve to select the optimal variant of the construction project execution, but only in cases where the period of its exploitation is not too long. The main disadvantage of the simple method is the fact that in the calculations the phenomenon of money value changes over time and changes in energy prices are omitted. The second approach to estimating life cycle costs in construction is a complex one. The complex approach (as opposed to the simple approach) allows financial risks to be taken into account by analysing the change in the value of money over time. The application of advanced mathematical techniques and tools (such as fuzzy logic, genetic algorithms and probabilistic methods) enables the analysis of the impact of other risk factors which can also be identified in the life cycle of the building [16].
It is worth noting that the estimation of life cycle costs is a calculation, therefore the calculated value of LCC should include the impact of the risk involved. This basic issue is addressed by ISO standard 15686-5:2008 buildings and constructed assets; service life planning; part 5: life-cycle costing [11]. There are a lot of studies concerning the impact of risk factors on the building life cycle costs, but as the standard states in Section 8, none of the models defines or expresses the impact of risk in the form of a separately quantified cost addition for the risk (8.1. section of [11]).
Taking into account the above, the authors attempted to develop a complex model for estimating the whole life costs of buildings, which enables the quantification of cost addition for risk, and which allows the investor to compare buildings in terms of a number of economic criteria, namely: life cycle costs (LCC—when the investor cannot record incomes), whole life costs (WLC—when, in addition to incurring costs in the phases of the building life cycle, the investor will also be able to record incomes), life cycle equivalent annual costs (LCEAC—when the durations of the exploitation phase differ) and cost addition for risk (ΔRLCC—expressed as a difference in currency units between the amount of the life cycle cost of a building which takes into account the impact of risk, and the value of the life cycle cost of a building that does not respect this influence). The authors based the assumptions of the model on the fuzzy approach, and the subsequent stages of the model development are treated by their numerous publications [17,18,19,20], including the publications on verification studies investigating the correctness of the model’s operation [21,22].
The aim of this paper, however, is an attempt to confirm the validity of the model structure assumptions adopted by the authors by comparing the originally selected fuzzy approach to calculating life cycle costs taking into account the risk with the probabilistic approach, as well as indicating the domain in which the probabilistic approach will complement the fuzzy approach chosen by the authors. What is more, the probabilistic approach is recommended by the ISO standard (Section 8.3 of [11]) due to the need to conduct LCCA in conditions of uncertainty or risk taking into account statistical methods, such as the Monte Carlo analysis at the level of probability reaching 10%, 50%, and 90%.
In their simulations, the authors used the following software: Oracle Crystall Ball that is the leading spreadsheet-based application for predictive modeling, forecasting, simulation, and optimization in situations where critical risk factors can be affected.

2. Selected Models for Estimating Life Cycle Costs Involving Risk Impact—A Literature Review

In the literature on the subject one can distinguish complex models which involve only the influence of financial risk and those which, apart from financial risk, take into account the influence of other risk factors in the life cycle of building materials and components or buildings and constructed assets.
Table 1 presents a selection of complex mathematical models prepared for estimation of life cycle costs in the construction industry, whose authors took into account the financial risk in the form of money value change over time.
The complex methods described in Table 1 are based mainly on economic models that take into account the phenomenon of money value change over time, and thus correspond to the analysis of the potential impact of the occurrence of financial risk on the amount of future costs, as related to the present day.
An example of complex methods is the one implemented by the Finnish team, Hasan, Vuolle and Siren, for single-family detached houses [12]. The authors considered a building designed in terms of structure and installation to be the basis for the analysis, which they call a reference case. For the reference case, design alternatives are then prepared, which are related to a small scope of modifications of construction solutions concerning the type and system of window joinery used, thermal insulation of horizontal and vertical partitions, or electrical installations, as well as the scope of design modifications in terms of HVAC installation systems (HVAC: acronym of heating, ventilation, air conditioning) which are responsible for controlling the heating, ventilation and air conditioning of the building. As a result of this approach, it is not necessary for the analysis to include any cost data on all the construction components of the building or the installation systems designed for every alternative solution, since a considerable number of them are the same as for the reference case. Therefore, for any alternative solution, the value of life cycle costs are not calculated from scratch but on the basis of the data related to the extent of modifications made only, which will result in differences in the magnitude of the corresponding cost components.
The most common example of a complex method is the one analysing the effectiveness of a construction project based on discounted cash flows of net present value in the life cycle (LCNPV). This method applied, for example, by [12,14] makes it possible to assess the construction project on the basis of the life cycle cost criterion and, at the same time, to compare and select (from among alternative variants of the project) such a variant which meets both the economic and environmental criteria. The LCNPV value is calculated by the following equation:
L C N P V = i = 0 n C F i ( 1 + r ) i
where CFi is cash flow in i-th year, n is life cycle duration in years, i is subsequent year, r is discount rate.
The number of mathematical models developed for the estimation of life cycle costs in construction, in which authors considered the possibility of the impact of risk factors other than financial ones, is no longer so large. The following presents examples of models and researchers that developed or adapted them.
Fuller and Boyles [23] use probabilistic techniques that help analyze risks that may also accompany heat pump-based installation systems (for instance, the risk of equipment failure or the risk of achieving lower energy gains than originally assumed). The cost elements that have been taken into account in the studies are the initial costs of purchasing the installation, the annual electricity consumption costs and the annual operating costs (including maintenance) of the equipment. The analysis also takes into account the amount of energy gains and the residual value from the resale of some of the components of the installation system. The authors use the Monte Carlo analysis as a simple technique for taking samples of probability distributions for uncertain input values so that results close enough to the correct probability distribution can be obtained. Based on the information about the likelihood of the risk factor, a decision is made to include additional costs in the life cycle cost of a building or to reduce the energy gains relating to the revenues over its life cycle.
Menassa [24] outlines the ways to determine life cycle costs for construction projects involving the upgrading of existing buildings in the context of sustainable development. The author considers risk factors that he attributes to technological nature (design errors, incompatibility of characteristics of building materials with design assumptions, variable productivity of construction workers), business (unpredictability of market changes, volatility in tax systems) and political (changes in environmental regulations, limiting the possibility of using raw materials or building materials on local markets). In the author’s opinion, the risk factors listed may occur in the construction projects in question and may also have a negative impact on the size of life cycle costs of buildings. In his research, the author combines a probabilistic approach to risk analysis in the context of economic assessment of the effectiveness of construction projects. The author uses economic indicators in his work, such as minimum attractive rate of return (MARR) and net present value (NPV).
Ammar, Zayed and Mosehli [25] assess design alternatives for structural elements of buildings with varying operating times. As a comparative criterion, the authors propose equivalent annual cost for building (EAC) as an index. The analysis takes into account initial costs, annual maintenance costs and the costs of building decommissioning. In addition, each cost type considers the impact of risks on their value, though the authors do not mention the particular names of the risk factors. The category or nature of the risk is also not specified. In their work, the authors apply the theory of fuzzy sets, the DSW (Dong, Shah and Wong) algorithm, which simplifies the basic arithmetic operations on fuzzy numbers and the vertex method, which allows to eliminate errors that may occur during arithmetic operations on fuzzy numbers after their previous decomposition. In their publication, the authors also check the correctness of the model operation on the example of water supply networks and sewage infrastructure modernization projects [26].

3. Original Model for Estimating the Whole Life Costs of Buildings

3.1. Reasons for Choosing Theory of Possibility to Build the Model

Many researchers [27,28,29,30,31,32,33,34,35,36,37] and ISO standard [11] state that in some publications the terms risk and uncertainty are treated identically or interchangeably, which is a mistake. According to Knight [28] and ISO standard [11], risk is related to the so-called measurable uncertainty. The measurable nature of uncertainty results from the fact that risk is quantifiable and can be directly translated into the size of parameters necessary, for example, to perform an economic efficiency calculation for a planned construction project.
Two ways of describing measurable uncertainty are commonly used, namely the probability theory and probability distributions, as well as the theory of fuzzy sets and the so-called possibility distributions. As a number of studies reveal, such as [38,39,40,41,42]:
  • the developed concepts of risk quantification which concern (in general) investment projects, assume a probabilistic character of a description of uncertainty of parameters necessary, for instance, to perform an economic efficiency calculation or risk assessment, but in some cases this assumption is not correct,
  • in practice, it happens that the expert assessing the risk does not have at his or her disposal a sufficient number of data enabling statistical research to be performed, from which a probabilistic probability distribution would result, and thus he or she subjectively determines the size of parameters necessary, for example, to perform an economic efficiency calculation,
  • rapid changes in market conditions are also frequent and may be contradictory to the forecasts used in the parameterization of variables which are often based on historical data,
  • it is also possible to indicate cases in which the nature of uncertainty of parameters that are necessary, for instance, to perform an economic efficiency calculation, cannot be linked to a probability account because it is related to a unique, often one-off, event,
  • it is more natural for humans to describe the uncertainty of parameters necessary, for example, to perform an economic efficiency calculation or risk assessment, by means of linguistic variables (phenomena verbally described), which may correspond to expert estimates categorized as most favourable, average and the worst variants of the parameter in question.
In view of this argument, the structure of the model for estimating the whole life costs of buildings, is going to be based on the theory of possibility, and thus on fuzzy logic.

3.2. Main Assumptions of the Model

As indicated in the authors’ publications [20,22], in the model for estimating the whole life costs of buildings allowing quantification of the cost allowance for risk, the fuzzy set theory is combined with a method used to analyze the economic efficiency of construction projects based on discounted cash flows (dCF). This is the net present worth method (NPW), which in the model for estimating the whole life costs of buildings is applicable in a fuzzy version (the fuzzy NPW method). The model calculation path is based on:
  • the analysis of discounted cash flows (dCF) at a specified value discount rate (r),
  • net present worth (NPW) index, which means the difference between discounted cash flows (dCF) and initial investment expenditure (investment),
  • the concept of a fuzzy number,
  • theorem on the decomposition of a fuzzy set into α-cuts,
  • Zadeh’s principle of fuzzy extension.
A set of calculation formulas which enable the calculation of economic indexes, LCC, WLC, LCEAC and ΔRLCC, was presented and discussed in detail in the following publications [17,18,19,20]. Only the most important equations by which the values of the indexes are calculated are listed below, namely LCC (according to Equation (2)) and WLC, which is the difference between the values of LCC (Equation (2)) and incomes in the building life cycle, ILC (Equation (3)):
L C C i ¯ = C i n , i ¯ + P W F A C , i ¯ j = 1 n A C , i C o p A , i j ¯ + k = 1 n N A C , i C o p N A , i k ¯ P W F N A C , i k ¯ + P W F W D , i ¯ C w d , i ¯
where LCCi is the life cycle cost of the i-th building, Cin,i is the amount of initial costs, CopA,ij is the amount of the j-th annual operating cost, CopNA,ik is the amount of the k-th periodical operating cost, Cwd,i is the amount of the withdrawal costs, nAC,i, nNAC,i is number (multiple) of annual and periodical operating costs, respectively, PWFAC,i is value of the discount factor for annual operating costs, PWFNAC,ik is value of the discount factor for the k-th periodical operating cost, PWFWD,i is the value of the discount factor for the revenue generated in the withdrawal phase, where an overbar in the formula means that the value is a fuzzy number.
I L C i ¯ = P W F A I , i ¯ l = 1 n A I , i I o p A , i l ¯ + m = 1 n N A I , i I o p N A , i m ¯ P W F N A I , i m ¯ + P W F W D I , i ¯ I w d , i ¯
where ILCi is the amount of incomes in the life cycle of the i-th building, IopA,il is the amount of l-th annual income, IopNAi,m is the amount of the m-th periodical income, Iwd,i is the amount of income reached in the withdrawal phase, nAI,i, nNAI,i is number (multiple) of operational incomes of annual and periodic nature, respectively, PWFAI,i is value of the discount rate for annual incomes, PWFNAI,im is value of the discount rate for the periodical m-th income, PWFWD,i is the value of the discount factor for the income earned in the retirement phase; where an overbar in the formula means that the value is a fuzzy number.
The value of the LCEAC index is the product of the LCC value multiplied by the annual discount factor (AF—annuity factor) which is calculated on the basis of Equation (4):
A F i ¯ = r ¯ ( 1 + r ¯ ) T i ¯ ( 1 + r ¯ ) T i ¯ 1
where r is discount rate, Ti is life cycle of the i-th building (equal to the operating period of the building); where an overbar in the formula means that the value is a fuzzy number.
The index of cost addition for risk (ΔRLCC) is calculated as the difference between the life cycle costs of a building which involves the impact of risk (LCC) and the life cycle costs of a building which does not take this impact into account (LCCREF). Both values listed here (LCC, LCCREF) is calculated by means of Equation (2).

3.3. Division and Parameterization of Input Data to the Model

Input data for the model estimating the whole life costs of buildings are subdivided into the following parameters:
  • TG (temporal-global)—temporal (of a global nature), that is the life cycle of the Ti building, where Ti equals the estimated service life of a building (ESLB),
  • TL (temporal-local)—temporal (of a local nature), that is times tik, tim, after which k-th periodic operating costs or m-th periodic income are calculated, respectively,
  • FG (financial-global)—financial (of a global nature), in the form of a discount rate (r) which is necessary to calculate the net present value of a particular amount of money on the basis of its value specified at a future date,
  • FC (financial-costs)—financial (understood as costs that may occur during the life cycle of a building) including costs of an annual nature: annual operating costs CopA,ij, and periodical: successively, initial costs Cin,i, periodical operating costs CopNA,ik and withdrawal costs Cwd,i,
  • FI (financial-incomes)—financial (understood as costs that may occur during the life cycle of a building), that is incomes of an annual nature: annual IopA,il, and periodical: successively, periodical incomes obtained during the operating phase of the building IopNA,im and incomes reached during the withdrawal phase Iwd,i.
Convex and normal fuzzy numbers are used for the parameterization of the above mentioned data. Figure 1 presents the basic set of membership functions of fuzzy numbers (functions with line segment graph) for the input data without risk (Figure 1a), for discount rate (Figure 1b) and for temporal parameters TG and TL, and for financial FC and FI where the impact of risk on the amount of the parameter concerned will be taken into account (Figure 1c,d).
The remaining sets of fuzzy number membership functions, including functions with square segmented graphs (alternative set I), harmonic functions (alternative set II) and complex symmetrical and asymmetrical functions of Gauss (alternative set III) are presented in Figure 2, Figure 3 and Figure 4, respectively.
The possibilities of using alternative sets of fuzzy number membership functions are described by [22].

4. Life Cycle Cost Analysis—Comparison of Results Obtained by the Fuzzy and Probabilistic Approach

4.1. LCCA with Use of Fuzzy Approach and the Model for Estimating the Whole Life Costs of Buildings

The computational example refers to a multi-family residential building for which an economic life cycle costs analysis (LCCA) was performed on the basis of the life cycle costs (LCC) criterion. The following assumptions were made in the example:
  • the considered financial risk factor is related to the possibility of a change in the discount rate (r) between 6% and 10% (with a forecast average value of 8%, using triangular membership function, as in Figure 1b),
  • the adopted type of building maintenance consists in preventive maintenance in accordance with the ISO standard [11], with an average allocation of financial resources for current maintenance and periodic repairs of the building at the stage of its operation,
  • it is assumed that the life cycle of the building would end with its demolition and the resale of the building plot on which it was built (building life cycle termination of the “from cradle to grave” type, in accordance with the ISO standard [11]).
Table 2 presents the values of input parameters (time and financial ones) adopted for the LCCA analysis.
Figure 5 presents a graph of the results obtained for the economic criterion of life cycle costs (LCC) for the basic membership functions (functions with line segment graphs).
The LCCA analysis shows that for the criterion of life cycle costs (LCC) in accordance with the fuzzy approach:
  • defuzzification value (calculated with use of the center of gravity method) equals 2,034,978 EUR,
  • mean value is 2,032,093 EUR,
  • median is equal to 2,024,742 EUR,
  • minimum value equals 1,951,631 EUR,
  • maximum value is 2,138,384 EUR.

4.2. LCCA with Use of Probabilistic Approach and Oracle Crystall Ball Software

In accordance with the assumptions adopted for the example discussed in Section 4.1 and taking into account the values of input parameters (temporal and financial) adopted for LCCA in this chapter (Table 2), the authors simulated calculations of the life cycle costs (LCC) criterion based on a probabilistic approach.
Figure 6 presents the triangular distribution of the discount rate parameter (r) which was used for the calculation according to the same assumptions as in the fuzzy approach, and which was modelled using Oracle Crystall Ball software.
Figure 7 presents the results obtained in Oracle Crystall Ball software for the economic criterion of life cycle costs (LCC) in a probabilistic perspective. Figure 7 reveals certainty level values and the LCC result range for the cross-section corresponding to the 0.5 cross-section, according to the fuzzy approach. The result was a certainty level of 74.9583% and in the results range from EUR 1,985,363 to EUR 2,077,267.
The LCCA analysis shows that for the criterion of life cycle costs (LCC), in accordance with probabilistic approach:
  • mean value is 2,029,618 EUR,
  • median is equal to 2,026,179 EUR,
  • minimum value equals 1,952,316 EUR,
  • maximum value is 2,142,021 EUR.

4.3. LCCA—Comparison of Results Obtained using the Fuzzy and Probabilistic Approach

Table 3 illustrates a summary of the LCCA results described in Section 4.1 and Section 4.2, which were subjected to a comparative analysis. The columns indicating differences (in EUR and in percent) present the differences in relation to the result obtained according to the fuzzy approach.
As it results from the comparative analysis, the differences obtained for the LCCA results according to the probabilistic approach are very small in relation to the results calculated on the basis of the fuzzy approach. In the case of median and minimum values, the differences (in absolute value) equal less than 0.1% (|+0.071|% and |+0.035|%, respectively). The differences for mean and maximum values are slightly greater and amount to |−0.122|% and |+0.170|%, respectively.

4.4. Monte Carlo Analysis with use of Oracle Crystall Ball Software

Figure 8, Figure 9 and Figure 10 depict the successive ranges of results for the given certainty level of 10%, 50% and 90% respectively, that is in accordance with the recommendation of ISO (Section 8.3 of [11]) to perform LCCA in the situation of uncertainty or risk impact, taking into account statistical methods, such as the Monte Carlo analysis.
Table 4 in turn, presents a summary of the Monte Carlo analysis results for the standard certainty levels (10%, 50% and 90%,) indicating differences to the mean value and the median for both boundaries (left and right) on the charts depicted in Figure 8, Figure 9 and Figure 10.
As Table 4 shows, a higher certainty level increases the difference between the LCCA score, the mean value and median according to the probabilistic approach. In the analyzed example, the values of differences to mean value and median were −2.823% and −2.828% for left boundaries and +3.435% and +3.441% for right boundaries, respectively.

5. Conclusions

The ways in which built structures are procured and erected, used and operated, maintained, repaired and refurbished, and finally demolished, constitute the complete cycle of sustainable construction activities. LCC is a key element in the assessment of environmental sustainability in construction. It provides a tool for the economic evaluation of alternative sustainability options exhibiting different capital, operating costs or resource usage. Based on the comparison studies described above, concerning fuzzy and probabilistic approaches to estimate the life cycle costs of buildings under risk-impact conditions, it can be concluded that the results obtained using the probabilistic approach are consistent with the results obtained using the fuzzy approach, that is the basic approach in the model for the estimation of the whole life costs of buildings. Differences between the results presented in Table 3 for mean, median, minimum and maximum values are equal −0.122%, +0.071%, +0.035% and +0.170%, respectively, with respect to the results obtained by the fuzzy approach. These differences are so small and insignificant that the thesis that the probabilistic approach confirms the validity of the assumptions adopted by the authors of the model for estimating the whole life costs of buildings can be considered as true.
Moreover, the probabilistic approach complements the model for estimating the whole life costs of buildings with regard to the certainty level as a percentage of likelihood. Figure 7 indicates a sample certainty level value and the LCC result range for the cross-section corresponding to the 0.5 cross-section, according to the fuzzy approach. What was obtained was certainty level at the level of 74.9583% and in the results range, which is from EUR 1,985,363 to EUR 2,077,267 according to the fuzzy approach.
In addition, it should be emphasized that the probabilistic approach enables the application of analyses recommended by the ISO standard [11] due to the need to conduct an LCCA in the case of uncertainty or risk impact, in the recommendation for the use of statistical techniques, such as Monte Carlo analysis, at a likelihood level of 10%, 50% and 90%. The results of the Monte Carlo analysis for the example described in this paper are summarized in Table 4.
According to the authors, the hybrid application of both approaches to life cycle costs analysis in construction using the author’s own model for estimating the whole life costs of buildings, as presented in this paper, can solve the existing problem of performing LCCA in a non-complex way. In the example it is assumed that the life cycle of the building would end with its demolition and the resale of the building plot on which it was built (building life cycle termination of the “from cradle to grave” type). The study is addressed to all stakeholders, but in particular it may be helpful for the owners of buildings, who want to shape the policy of building management in a rational and economic way.

Author Contributions

The individual contribution and responsibilities of the authors were as follows: E.P. and K.Z. made a review of the literature concerning introduction part and selected models for estimating life cycle costs involving risk impact. E.P., D.W. and K.Z. described all assumptions of the original model for estimating the whole life costs of buildings. W.M. and D.W. prepared life cycle cost analysis and compared results obtained by the fuzzy and probabilistic approach. W.M. conducted Monte Carlo analysis with use of Oracle Crystall Ball software. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Hajnal, I. Optimisation of Public Building Projects in the Design Phase. Period. Polytech. Archit. 2006, 47, 99–103. [Google Scholar] [CrossRef] [Green Version]
  2. Ruparathna, R.; Hewage, K.; Sadiq, R. Economic evaluation of building energy retrofits: A fuzzy based approach. Energy Build. 2017, 139, 395–406. [Google Scholar] [CrossRef]
  3. Grzyl, B.; Apollo, M.; Miszewska-Urbańska, E.; Kristowski, A. Zarządzanie eksploatacją obiektu w ujęciu kosztów cyklu życia. Acta Sci. Pol. Archit. 2017, 16, 85–89. [Google Scholar] [CrossRef]
  4. Apollo, M.; Siemaszko, A.; Miszewska-Urbańska, E. The selected roof covering technologies in the aspect of their life cycle costs. Open Eng. 2018, 8, 478–483. [Google Scholar] [CrossRef]
  5. Stewart, E.B.; Sahin, O.; Pham, L.; Ekambaram, P.; Stewart, R.A.; Bertone, E.; Flores, J.F.C.T. Resilient Buildings: Informing Maintenance for Long-term Sustainability; Technical Report; Griffith University: Brisbane, Australia, 2018. [Google Scholar]
  6. Zayed, T.M.; Chang, L.M.; Fricker, J.D. Life-cycle cost analysis using deterministic and stochastic methods: Conflicting results. J. Perform. Constr. Facil. 2002, 16, 63–74. [Google Scholar] [CrossRef]
  7. Noor, M.; Aizuddin, N. Whole Life Cycle Costing and Quality Satisfaction: Public Housing Floor Material. Adv. Mater. Res. 2013, 717, 877–883. [Google Scholar] [CrossRef] [Green Version]
  8. Kowalski, D.; Grzyl, B.; Kristowski, A. The cost analysis of corrosion protection solutions for steel components in terms of the object life cycle cost. Civ. Environ. Eng. Rep. 2017, 26, 5–13. [Google Scholar] [CrossRef]
  9. Biolek, V.; Hanák, T. Material life cycle costing of buildings: A case study. In AIP Conference Proceedings, Proceedings of International Conference of Numerical Analysis and Applied Mathematics (ICNAAM), Thessaloniki, Greece, 25–30 September 2017; Simons, E.D., Ed.; AIP Publishing: Melville, NY, USA, 2018; Volume 1978, p. 240013. [Google Scholar]
  10. Aye, L.; Bamford, N.; Charters, B.; Robinson, J. Environmentally sustainable development: A life-cycle costing approach for a commercial office building in Melbourne, Australia. Constr. Manag. Econ. 2000, 18, 927–934. [Google Scholar] [CrossRef]
  11. ISO. ISO 15686-5.2:2008 Buildings and Constructed Assets—Service Life Planning: Part 5, Life-Cycle Costing; ISO: Genewa, Switzerland, 2008. [Google Scholar]
  12. Hasan, A.; Vuolle, M.; Siren, K. Minimisation of life cycle cost of a detached house using combined simulation and optimisation. Build. Environ. 2008, 43, 2022–2034. [Google Scholar] [CrossRef]
  13. Marszal, A.J.; Heiselberg, P. Life cycle cost analysis of a multi-storey residential net zero energy building in Denmark. Energy 2011, 36, 5600–5609. [Google Scholar] [CrossRef]
  14. Plebankiewicz, E. Kierunki działań zmierzających do obniżenia kosztów w cyklu życia budynków miejskich. In Budownictwo na Obszarach Zurbanizowanych: Nauka, Praktyka, Perspektywy; Halicka, A., Ed.; Politechnika Lubelska: Lublin, Poland, 2014. [Google Scholar]
  15. Ustinovichius, L.; Popov, V.; Cepurnaite, J.; Vilutienė, T.; Samofalov, M.; Miedziałowski, C. BIM-based process management model for building design and refurbishment. Arch. Civ. Mech. Eng. 2018, 18, 1136–1149. [Google Scholar] [CrossRef]
  16. Di Giuseppe, E.; Iannaccone, M.; Telloni, M.; D’Orazio, M.; Di Perna, C. Probabilistic life cycle costing of existing buildings retrofit interventions towards nZE target: Methodology and application example. Energy Build. 2017, 144, 416–432. [Google Scholar] [CrossRef]
  17. Plebankiewicz, E.; Wieczorek, D. Rozmyta ocena ryzyka w cyklu życia obiektów budowlanych. Mater. Bud. 2016, 6, 59–61. [Google Scholar] [CrossRef]
  18. Plebankiewicz, E.; Zima, K.; Wieczorek, D. Quantification of the risk addition in life cycle cost of a building object. Tech. Trans. 2017, 5, 35–45. [Google Scholar]
  19. Wieczorek, D. Fuzzy risk assessment in the life cycle of building object - selection of the right defuzzification method. In AIP Conference Proceedings, Proceedings of International Conference of Numerical Analysis and Applied Mathematics (ICNAAM), Thessaloniki, Greece, 25–30 September 2017; Simons, E.D., Ed.; AIP Publishing: Melville, NY, USA, 2018; Volume 1978, p. 240005. [Google Scholar]
  20. Wieczorek, D.; Plebankiewicz, E.; Zima, K. Model estimation of the whole life cost of a building with respect to risk factors. Technol. Econ. Dev. Econ. 2019, 25, 20–38. [Google Scholar] [CrossRef] [Green Version]
  21. Plebankiewicz, E.; Wieczorek, D. Multidimensional sensitivity study of the fuzzy risk assessment module in the life cycle of building objects. Open Eng. 2018, 8, 490–499. [Google Scholar] [CrossRef]
  22. Plebankiewicz, E.; Zima, K.; Wieczorek, D. Original Model for Estimating the Whole Life Costs of Buildings and its Verification. Arch. Civ. Eng. 2019, 65, 163–179. [Google Scholar] [CrossRef]
  23. Fuller, S.K.; Boyles, A.S. Life-Cycle Costing Workshop for Energy Conservation in Buildings: Student Manual; National Inst. of Standards and Technology (CAML): Gaithersburg, MD, USA, 2000.
  24. Menassa, C.C. Evaluating sustainable retrofits in existing buildings under uncertainty. Energy Build. 2011, 43, 3576–3583. [Google Scholar] [CrossRef]
  25. Ammar, M.A.; Zayed, T.M.; Mosehli, O. Fuzzy-based life-cycle cost model for decision making under subjectivity. J. Constr. Eng. Manag. 2012, 139, 556–563. [Google Scholar] [CrossRef]
  26. Ammar, M.A.; Moselhi, O.; Zayed, T.M. Decision support model for selection of rehabilitation methods of water mains. Struct. Infrastruct. Eng. 2012, 8, 847–855. [Google Scholar] [CrossRef]
  27. Połoński, M.; Pruszyński, K. Problematyka ryzyka w projektowaniu realizacji robót budowlanych (cz. 1). Przegląd Bud. 2006, 77, 46–49. [Google Scholar]
  28. Knight, F.H. Risk, Uncertainty and Profit; Courier Corporation: Mineola, NY, USA, 2012. [Google Scholar]
  29. Kaczorek, K.; Krzemiński, M.; Ibadov, N. The problem of choosing risk management methodology at the example of railway construction. In MATEC Web of Conferences Proceedings, Proceedings of XXVI R-S-P Seminar 2017 Theoretical Foundation of Civil Engineering, Warsaw, Poland, 21–25 August 2017; EDP Sciences: Les Ulis, France, 2017; Volume 117, p. 00073. [Google Scholar]
  30. Fregonara, E.; Pattono, S. A sustainability indicator for building projects in presence of risk/uncertainty over time: A research experience. Aestimum 2018, 73, 173–205. [Google Scholar]
  31. Mirkovic, M. The Impact of Failure Types in Construction Production Systems on Economic Risk Assessments in the Bidding Phase. Complexity 2018, 2018, 1–13. [Google Scholar] [CrossRef]
  32. Siemaszko, A.; Grzyl, B.; Kristowski, A. A Model for Risk Assessment and Management of Construction Projects in Urban Conditions. In Proceedings of the 2018 Baltic Geodetic Congress (BGC Geomatics), Olsztyn, Poland, 21–23 June 2018; pp. 7–11. [Google Scholar]
  33. Meszek, W.; Rejment, M.; Dziadosz, A. Disturbance Analysis and Their Impact on Delays in Construction Process. In IOP Conference Series: Materials Science and Engineering, Proceedings of 2019 World Multidisciplinary Civil Engineering-Architecture-Urban Planning Symposium, Prague, Czech Republic, 17–21 June 2019; IOP: London, UK, 2019; Volume 603, p. 052002. [Google Scholar]
  34. Rogalska, M.; Żelazna-Pawlicka, J. Analysis of the Distribution Influence of the Density of Cost-forming Factors on Results of the LCCA Calculations. Arch. Civ. Eng. 2019, 65, 101–112. [Google Scholar] [CrossRef] [Green Version]
  35. Konior, J. Significance Risks Evaluation of Commercial Construction Projects. Arch. Civ. Eng. 2019, 65, 19–33. [Google Scholar] [CrossRef]
  36. Dziadosz, A.; Rejment, M. Risk assessment in construction project using statistic approach. In AIP Conference Proceedings, Proceedings of International Conference of Numerical Analysis and Applied Mathematics (ICNAAM), Rhodes, Greece, 13–18 September 2018; Simos, T.E., Ed.; AIP Publishing: Melville, NY, USA, 2019; Volume 2116, p. 180012. [Google Scholar]
  37. Leśniak, A.; Janowiec, F. Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network. Sustainability 2019, 11, 5388. [Google Scholar] [CrossRef] [Green Version]
  38. Gupta, C.P. A note on the transformation of possibilistic information into probabilistic information for investment decisions. Fuzzy Sets Syst. 1993, 56, 175–182. [Google Scholar] [CrossRef]
  39. Mohamed, S.; McCowan, A.K. Modelling project investment decisions under uncertainty using possibility theory. Int. J. Proj. Manag. 2001, 19, 231–241. [Google Scholar] [CrossRef]
  40. Rębiasz, B. Efektywność i ryzyko projektów inwestycyjnych - rozkłady prawdopodobieństwa czy rozkłady możliwości. Bad. Oper. I Decyz. 2006, 3–4, 113–131. [Google Scholar]
  41. Dikmen, I.; Birgonul, M.T.; Han, S. Using fuzzy risk assessment to rate cost overrun risk in international construction projects. Int. J. Proj. Manag. 2007, 25, 494–505. [Google Scholar] [CrossRef]
  42. Przybycin, Z. Zarządzanie ryzykiem projektów inwestycyjnych. Zesz. Nauk. Wyższej Szkoły Bank. We Wrocławiu 2011, 20, 351–361. [Google Scholar]
Figure 1. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG (temporal-global), TL (temporal-local), FC (financial-costs) and FI (financial-incomes) where the impact of risk on the amount of the parameter concerned will be taken into account—basic set (own study).
Figure 1. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG (temporal-global), TL (temporal-local), FC (financial-costs) and FI (financial-incomes) where the impact of risk on the amount of the parameter concerned will be taken into account—basic set (own study).
Sustainability 12 00226 g001
Figure 2. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG, TC, FC and FI where the impact of risk on the amount of the parameter concerned will be taken into account—alternative set I (own study).
Figure 2. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG, TC, FC and FI where the impact of risk on the amount of the parameter concerned will be taken into account—alternative set I (own study).
Sustainability 12 00226 g002
Figure 3. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG, TC, FC and FI where the impact of risk on the amount of the parameter concerned will be taken into account—alternative set II (own study).
Figure 3. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG, TC, FC and FI where the impact of risk on the amount of the parameter concerned will be taken into account—alternative set II (own study).
Sustainability 12 00226 g003
Figure 4. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG, TC, FC and FI where the impact of risk on the amount of the parameter concerned will be taken into account—alternative set III (own study).
Figure 4. Fuzzy number membership functions for input parameters: (a) for the input data without risk; (b) for discount rate; (c,d) for the input data TG, TC, FC and FI where the impact of risk on the amount of the parameter concerned will be taken into account—alternative set III (own study).
Sustainability 12 00226 g004
Figure 5. Resulting membership distributions for the LCC criterion—basic set (own study).
Figure 5. Resulting membership distributions for the LCC criterion—basic set (own study).
Sustainability 12 00226 g005
Figure 6. Triangular distribution of the discount rate parameter—r (own study).
Figure 6. Triangular distribution of the discount rate parameter—r (own study).
Sustainability 12 00226 g006
Figure 7. LCCA—probabilistic approach for the cross-section corresponding to the 0.5 cross-section, according to the fuzzy approach (own study).
Figure 7. LCCA—probabilistic approach for the cross-section corresponding to the 0.5 cross-section, according to the fuzzy approach (own study).
Sustainability 12 00226 g007
Figure 8. LCCA—probabilistic approach with certainty level equal to 10% (own study).
Figure 8. LCCA—probabilistic approach with certainty level equal to 10% (own study).
Sustainability 12 00226 g008
Figure 9. LCCA—probabilistic approach with certainty level equal to 50% (own study).
Figure 9. LCCA—probabilistic approach with certainty level equal to 50% (own study).
Sustainability 12 00226 g009
Figure 10. LCCA—probabilistic approach with certainty level equal to 90% (own study).
Figure 10. LCCA—probabilistic approach with certainty level equal to 90% (own study).
Sustainability 12 00226 g010
Table 1. Complex approach involving financial risk—the estimated cost elements in the selected cases of life cycle costs analysis (LCCA) analyses in the construction industry (own study).
Table 1. Complex approach involving financial risk—the estimated cost elements in the selected cases of life cycle costs analysis (LCCA) analyses in the construction industry (own study).
Authors, Year and the Subject of StudyType of ApproachCost ElementsMain Aim of the Analysis
Building Materials and Components
Zayed, Chang and Fricker, 2002 [6]
Paint coatings on steel bridges
Deterministic, including the net present value and equivalent annual costsInitial costs and costs incurred during the utilization of paint coatingsCost comparison for three alternative coating maintenance strategies, that is maintenance, on-site repairs and repainting
Noor and Aizuddin, 2013 [7]
Floor coverings in public buildings
Deterministic, based on an economic model, taking into account the quality of building components, construction, operation and maintenanceInitial construction costs and the sum of all costs relating to maintenance, repair, as well as the annual costs of staff and taxesDetermination of the influence of individual factors on costs, construction of the most favourable result
Buildings and Constructed Assets
Aye, Bamford, Charters and Robinson, 2000 [10]
Office and commercial buildings
Deterministic, based on an economic feasibility study, using a discount account to reflect the change in money value over timeInitial construction costs, operating costs, including energy demand and withdrawal costsComparison and identification of the best of the four preferred alternatives in terms of life cycle costs
Hasan, Vuolle and Siren, 2008 [12]
Detached houses
Deterministic, using simulation and economic optimization methods to calculate cost differences in the building life cycle costsInvestment and operating costs, including maintenance and replacement costsComparison of calculated cases and minimization of building life cycle costs
Marszal and Heiselberg, 2011 [13]
Residential, multi-storey buildings with zero energy demand
Deterministic, including the net present value and equivalent annual costsInvestment, operating and demolition costs including revenues from renewable energy systemsDetermine the value of life cycle costs and choose the optimal solution from a variety of alternatives
Plebankiewicz, 2014 [14]
Urban buildings
Deterministic, based on the analysis of the net present value and economic efficiency of the investment, taking into account environment protection issuesInitial costs for land acquisition, design and construction of the building, as well as maintenance and operating costsComparison and selection of the best alternative solution in terms of environmental and economic criteria
Table 2. Input data accepted for the life cycle costs analysis (LCCA) analysis (own study).
Table 2. Input data accepted for the life cycle costs analysis (LCCA) analysis (own study).
ParametersValues
Life cycle (Ti = ESLB)50 years
Discount rate (r)about 8%
Initial costs (Cin,i)1,675,837 EUR
Annual operating costs (CopA,ij)23,581 EUR
Periodical operating costs (CopNA,ik) after the time of (tik) = …1052,884 EUR
2052,884 EUR
30211,558 EUR
4052,884 EUR
50not applicable
Withdrawal costs (Cwd,i) after the time of (Ti = ESLB)121,256 EUR
ESLB = estimated service life of a building.
Table 3. Results of the comparative analysis of the fuzzy and probabilistic approaches to LCCA (own study).
Table 3. Results of the comparative analysis of the fuzzy and probabilistic approaches to LCCA (own study).
Parameter (Value)LCC Results (in EUR) According toDifferences
A Fuzzy ApproachA Probabilistic ApproachEUR%
Defuzzification2,034,978not applicable--
Mean2,032,0932,029,618−2475−0.122
Median2,024,7422,026,179+1437+0.071
Minimum1,951,6311,952,316+685+0.035
Maximum2,138,3842,142,021+3637+0.170
Table 4. The results of the Monte Carlo analysis (own study).
Table 4. The results of the Monte Carlo analysis (own study).
Certainty LevelBoundaryLCC Results (in EUR)Differences to Mean ValueDifferences to Median
EUR%EUR%
10%left2,021,541−8077−0.398−4638−0.399
right2,030,929+1311+0.065+4750+0.065
50%left2,001,202−28,416−1.400−24,977−1.402
right2,054,653+25,035+1.233+28,474+1.236
90%left1,972,313−57,305−2.823−53,866−2.828
right2,099,343+69,725+3.435+73,164+3.441

Share and Cite

MDPI and ACS Style

Plebankiewicz, E.; Meszek, W.; Zima, K.; Wieczorek, D. Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk. Sustainability 2020, 12, 226. https://doi.org/10.3390/su12010226

AMA Style

Plebankiewicz E, Meszek W, Zima K, Wieczorek D. Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk. Sustainability. 2020; 12(1):226. https://doi.org/10.3390/su12010226

Chicago/Turabian Style

Plebankiewicz, Edyta, Wiesław Meszek, Krzysztof Zima, and Damian Wieczorek. 2020. "Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk" Sustainability 12, no. 1: 226. https://doi.org/10.3390/su12010226

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop