Dimensionality Reduction Method of Dynamic Programming under Hourly Scale and Its Application in Optimal Scheduling of Reservoir Flood Control

School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
*
Author to whom correspondence should be addressed.
Energies 2022, 15(3), 676; https://doi.org/10.3390/en15030676
Submission received: 17 November 2021 / Revised: 31 December 2021 / Accepted: 6 January 2022 / Published: 18 January 2022

Abstract

:
In flood control scheduling of reservoirs, the usual conventional scheduling fails to obtain the optimal solution to the problem. The dynamic programming method is applied to the field. However, the problem of ‘dimensional disaster’ restricts its application. To solve these problems, the improved DP is constructed according to the principle of period inflow and water balance, which includes a variable dispersion mechanism of the retraction space and a calculation method for the smallest discrete points of each discrete range. Taking Dongjiang Reservoir as the research object, based on the maximum peak clipping criterion and the maximum flood control safety guarantee criterion, the improved DP is used for optimization. The results find that when the former criterion is used for scheduling, the discharge flow processes of the two floods are more uniform than conventional scheduling. When the latter criterion is used for scheduling, the minimum water levels of the two floods are lower than the conventional scheduling. As such, it is found that in the two flood dispatches, the calculation time after the first flood DP dimensionality reduction processing is reduced by about 65%, and the second flood is reduced by about 59%, which greatly improves the calculation efficiency of the DP.

1. Introduction

Reservoir flood control scheduling is usually a multi-constrained, multi-stage, non-linear, and complex decision-making process. The commonly used conventional scheduling method is a semi-empirical and semi-theoretical method with the help of scheduling criteria. This method uses empirical charts, such as the flood control scheduling map of the reservoir, to implement the operation, so the flood control scheduling plan obtained is often only a feasible solution or a reasonable solution rather than an optimal solution. Therefore, to further improve the flood control benefits of the reservoir and ensure the safety of the reservoir and downstream protection objects, it is very necessary to research the optimization of flood control scheduling in combination with the characteristics of the flood control scheduling of the reservoir.
After nearly 50 years of research, there are many existing mathematical models of reservoir scheduling. They can be divided into four categories according to system input and functional characteristics: deterministic reservoir optimal scheduling model; random reservoir optimal scheduling model; fuzzy reservoir optimal scheduling model; and multi-objective decision-making theory and its application in reservoir optimal scheduling. At present, many optimization algorithms have been applied to the solution of the reservoir flood control optimal scheduling model. The traditional optimization algorithms include linear programming (LP) [1], nonlinear programming (NLP) [2], and dynamic programming (DP) [3]. Dynamic programming has many advantages: First, Bellman’s optimality principle promotes a two-stage formula that greatly simplifies the multi-stage decision process (Bellman 1957) [4]. Second, the DP discretizes the continuous storage state of the reservoir and searches for the optimal decisions numerically. The numerical search efficiently deals with nonlinear and non-continuous objective functions and constraints [5,6,7]. Third, the two-stage formulation of DP quantifies the trade-offs between current and future time periods and provides insights into black-box optimization models. However, the DP method also has shortcomings, such as serious dimensionality problems. Especially when the scheduling period is a small time scale, and the flow of a period is very small, to ensure the validity of the calculation the dispersion is very large and the calculation time will be very long in the whole calculation process. If the dispersion is reduced, the DP penalty mechanism will be destroyed, and the negative discharge flow will occur.
Based on the above shortcomings of DP, many improved DP algorithms have emerged. For example, Larson and Korsak (1970) [8] proposed the dynamic programming successive approximations (DPSA) technique which reduced the number of DP optimized reservoirs by decomposing the multi-reservoir problem into a series of single reservoir problems. Heidari et al. (1971) [9] provided the discrete differential dynamic programming (DDDP) approach, whose characteristic is that it reduces the number of DP runs by iteratively searching in a constantly changing corridor. Bai et al. (2015) [10] and Zhang et al. (2016) [11] applied a hybrid approach, combining the progressive optimality algorithm (POA) and dynamic programming successive approximation (DPSA) to multi-reservoir operation, inheriting the advantages of the two methods. Cheng et al. (2014) [12] and He et al. (2019) [13] used parallel computing technology to solve the problem of multi-reservoir operation and reduced the execution time of the search program. Feng et al. (2020a) [14] applied the Latin hypercube sampling technique to the optimization of the cascade reservoir system, reducing the computational burden of DP. Although these methods can alleviate the ‘dimensional disaster’ problem to a certain extent, with the increase of the calculation scale or the decrease of the calculation time scale, they will still face a serious ‘dimensional disaster’ problem. In addition, Zhang et al. (2015) [15] alleviated the dimension disaster problem of dynamic programming from the perspective of parallel computing but did not do relevant research on the solving mechanism. Ji et al. (2015) [16] proposed a multi-dimensional dynamic programming algorithm with nested structure for medium and long term scheduling problems, and studied the problem of dimension disaster in multi-library joint scheduling. Jiang et al. (2017) [17] proposed two-dimensionality reduction methods of multidimensional dynamic programming, but the model solving speed was improved mainly through the coupling application of a stepwise search method and multi-dimensional dynamic programming, as well as the optimization mechanism of coarse, fine, and granularity coupling. Moreover, the research problem was the medium and long-term optimization scheduling problem of power generation. At present, there are few researches on short-term scheduling and reservoir flood control optimal scheduling.
In this paper, to make the DP method better applied to the flood control optimal scheduling of reservoir, a dynamic programming dimensionality reduction method on the hourly scale is proposed to further alleviate the dimensional disaster of DP and avoid the negative discharge flow. Taking the two floods of Dongjiang Reservoir during the flood season as an example, they are applied to the solution of the flood control optimal scheduling problem of the reservoir. The maximum peak clipping criterion and the maximum flood control safety guarantee criterion are adopted as the control objectives of the optimal scheduling models. By comparing the results of conventional scheduling and optimal scheduling, the characteristics of optimized scheduling and the effectiveness of the proposed DP dimensionality reduction method are analyzed. According to the scheduling results, the feasible measures for improving the flood control level of the reservoir are summarized and extracted.

2. Reservoir Flood Control Scheduling Model

Reservoir flood control scheduling is mainly divided into conventional scheduling and optimal scheduling. Conventional scheduling mainly relies on empirical charts, such as scheduling charts to implement operations. Optimal scheduling mainly relies on the establishment of optimal scheduling models, including system inputs, objective functions, and constraint equations. In this paper, the maximum peak clipping criterion and the maximum flood control safety guarantee criterion are used as the objective functions of optimal scheduling.

2.1. Reservoir Optimal Scheduling Model

In this paper, the maximum peak clipping criterion and the maximum flood control safety guarantee criterion are used as the optimal scheduling model. The specific introduction is as follows.

2.1.1. Objective Function

Maximum Peak Clipping Criterion

The criterion is to take the minimum value of the maximum flow (qmax) of the downstream protection point as the control target of the model under the premise of controlling the maximum water level of the reservoir. The objective function is divided into no interval inflow at the reservoir Equation (1) and interval inflow at the reservoir Equation (2):
min f = t 0 t d q t 2 d t
min f = t 0 t d q t + q int , t 2 d t  
where t0 is the beginning of the scheduling period, td is the end of the scheduling period, qt is the outbound flow of the reservoir during the t period and is also a variable for model optimization, and qint,t is the interval flow during the t period. In this paper, formula (2) is taken as the objective function.

Maximum Flood Control Safety Guarantee Criterion

The criterion is based on the lowest value of the highest water level (Zmax) of the reservoir as the control objective. The objective function is as follows:
min z = t = 1 T V t + Q t q t Δ t 2
where T is the total number of scheduling periods, t is the number of periods, qt is the outbound flow of the reservoir during the t period, Qt is the inbound flow of the reservoir during the t period, Δt is the length of a period, and Vt is the storage capacity at the end of the period and is also a variable for model optimization.

2.1.2. Constraint Conditions

(1) Reservoir water balance constraint
V t = V t 1 + Q t q t Δ t
where Vt is the storage capacity at the end of the period, Vt−1 is the storage capacity at the beginning of the period, Qt is the inbound flow of the reservoir at the end of period t, qt is the outbound flow of the reservoir at the end of period t, and Δt is the length of a period.
(2) Water level constraint
Z min Z t Z max
where Zt is the water level of the reservoir during the t period, Zmin is the lowest water level allowed by the reservoir during the t period, and Zmax is the highest water level allowed by the reservoir during the t period.
(3) Discharge capacity constraint
q Δ t q Z t , B t
where qΔt is the average discharge flow during the t period, Bt is the operation mode of the spillway, Zt is the water level of the reservoir, and q is the discharge flow during the t period.
(4) Variability constraint of outbound flow
q t q t 1   q
where |qtqt1| is the amplitude of change of outbound flow in adjacent periods, and q is the allowable value of the amplitude of outbound flow in adjacent periods.
(5) Flood control storage capacity constraint
t 0 t D Q a v e q Δ t Δ t   V p r e
where t0 is the start time of the flood exceeding the downstream safe discharge, tD is the end time of the flood exceeding the downstream safe discharge, Qave is the average inbound flow during the period Δt, qΔt is the average discharge flow during the t period, Vpre is the flood control capacity of the reservoir, and Δt is the length of a period.
(6) Flood control strategy constraint
q t q s a f , q t Q max
where qsaf is the downstream safe discharge, qmax is the maximum discharge flow of the flood control strategy, and qt is the discharge flow during the t period.
(7) Regarding the maximum flood control safety guarantee criterion, the following constraint should be added to convert the maximum discharge flow into constraint:
Q t + q int , t q t max
where Qt represents the inbound flow of the reservoir during the t period, qint,t represents the interval flow during the t period, and qtmax represents the maximum discharge flow allowed by the downstream protection point during the t period.

2.2. Reservoir Conventional Scheduling Model

The conventional scheduling method is relative to the mathematical model, which is a general term for a class of methods that can make flood control scheduling decisions without complicated calculations. At present, the most common forms are scheduling charts and scheduling rules. The scheduling diagram is a two-dimensional graph composed of a set of water level process lines, and the discharge process of the reservoir is decided according to the position of the water level on the scheduling chart.

2.2.1. Conventional Scheduling Rules

The conventional reservoir scheduling rules are an important part of the conventional reservoir scheduling procedures and the basis for generating the reservoir scheduling plan. It is the specific regulations and operating instructions for determining reservoir flood control operation which are formulated according to the tasks of reservoir flood control scheduling, flood control characteristic water level, reservoir flood control method, reservoir discharge flow, etc. Its function is to specify how the reservoir should store and discharge under various possible conditions, such as inbound flow and the reservoir water level.
(1) Judgment of the highest water level
During the flood scheduling, the level of the inbound flood is determined according to the highest flood level of which frequency the actual reservoir water level reaches. The discharge flow of the reservoir is then controlled according to the flood regulation rules of the corresponding level of flood. This method is generally used for reservoirs with large flood regulation capacity and heavy downstream flood control tasks.
(2) The maximum flow judgment method
During flood scheduling, the level of flooding in the reservoir is judged according to the peak flow of the inbound flow (known by the forecast) to which frequency the flood reaches. The reservoir is then determined to control the discharge flow according to the flood regulation rules of the corresponding level of flood. This method is generally applicable to reservoirs with a small flood capacity.
(3) Comprehensive judgment method
During flood scheduling, the level of the flood is judged according to which of the reservoir water level and the inbound flow meets the respective maximum value first. The reservoir is then determined to control the discharge flow according to the flood regulation rules of the corresponding level of flood. In addition, there is a method (flood discriminant chart method) that comprehensively considers the inflow of the reservoir, the initial storage volume of the reservoir, and the steepest recession curve in the later stage to determine and control the discharge.

2.2.2. Application of Conventional Flood Control Scheduling Rules

It is assumed that flood forecasting is not considered in the flood regulation process, the initial flood water level is the flood limit water level, and the initial discharge capacity is Qdis. The general flood control scheduling steps are as follows:
Step 1: When the flood first starts, the inbound flow Qinb is less than Qdis, and at this time, the gate opening should be controlled to make the outbound flow equal to the inbound flow. When it is greater than Qdis but less than the safe discharge amount Qsaf of the downstream channel, the gate should be fully opened.
Step 2: When the inbound flow is greater than the safe discharge of the downstream channel, the gate should be closed gradually at this time to make the reservoir discharge according to the safe discharge of the downstream channel to protect the downstream safety.
Step 3: When the reservoir water level exceeds the high flood control level Zhig, it indicates that the flood has exceeded the downstream flood control guarantee. At this time, all gates should be opened in time for flood discharge to ensure the safety of the reservoir.
Step 4: When the reservoir water level exceeds the design flood level Zdes, extraordinary flood discharge facilities should be activated to ensure the safety of the reservoir.
Step 5: Once the highest flood level is reached, the inbound flow decreases to be less than the discharge flow. The level then drops until it reaches the flood control limit level, when the discharge is stopped.

3. Model Solution and Dimensionality Reduction of Dynamic Programming Based on the Hourly Scale

The maximum peak clipping criterion and the maximum flood control safety guarantee criterion are taken as examples, and the optimal scheduling model is solved based on the DP algorithm after dimensionality reduction.

3.1. The Idea of Model Solving Based on Dynamic Programming

The mathematical model of the DP algorithm is relatively flexible. Generally, as long as it can constitute a multi-stage decision-making process, this method can be used to solve the problem [18]. When the maximum peak clipping criterion is used as the optimal scheduling objective, the algorithm steps of DP are as follows:
Step 1: Divide the periods: divide the scheduling periods into multiple periods.
Step 2: Define state variables: use the water level Z or reservoir capacity V at the end of each period as the state variable. In period t, Vt (initial reservoir storage) at the start time is the initial state, and Vt-1 at the terminal time is the terminal state.
Step 3: Define decision-making variables: the average discharge flow of the reservoir in each period (qt) is taken as the decision-making variable.
Step 4: Define the state transition equation: Vt = Vt−1 + (Qtqtt.
Step 5: Define the stage index: take the square of the discharge flow during the period (qt2) as the stage index.
Step 6: Recursive equation: according to the state variable of the current period and the benefit function of the reserved period at the previous moment, the value of the benefit function of the reserved period at the next moment is pushed out. The recursive equation is:
F t V t 1   = min Ω q t 2 Δ t + F t + 1 V t
where Vt is the state variable at time t, Vt−1 is the state variable at time t − 1, Ft(Vt−1) is the benefit function of the reserved period at time t − 1, Ft+1(Vt) is the benefit function of the reserved period at the time t, and qt2 is the state variable at time t.
When the maximum flood control safety guarantee criterion is used as the optimal scheduling objective, the algorithm steps are similar to those of the maximum peak clipping criterion. The difference is that the phase goal at this time is: Vt + (Qtqtt. The recursive equation is:
F t ' V t 1   = min Ω V t +   Q t q t Δ t 2 + F t + 1 ' V t
where Vt is the state variable at time t. Vt-1 is the state variable at time t − 1. [Vt + (Qtqtt] is the state variable at time t.

3.2. Dimensionality Reduction Processing of DP Based on Changing Retracting Space

In the DP calculation, the upper and lower limits of the initially given water level are generally high. For example, the upper and lower limits of the water level in the flood control scheduling are generally taken from the flood limit water level to the design flood level, etc. If, in the process of DP discrete calculation, the same retraction space is discretized at each period, to achieve a better numerical calculation effect, the dispersion requirement will be very large and the calculation time will be very long.
To solve this problem, the rules for determining the upper and lower limits of the dynamic water level are proposed in this paper. The process is shown in Figure 1. According to the amount of inbound flow and initial storage capacity in each period, the upper limit of the water level in each period is determined according to the total inbound flow into the reservoir (as shown in Figure 2). The lower limit of the water level at each period is determined based on the outbound flow equal to the inbound flow or the principle of maximum discharge. In this way, a dynamic upper and lower limit of the water level is obtained, and at the same time, unnecessary discrete calculation of DP in the initial retraction space is avoided, which can greatly reduce the calculation time.

3.3. Reason Analysis and Processing of Negative Value of Drainage Flow in DP Calculation

In the DP calculation, when the period is very small, such as on the hourly scale, if the degree of dispersion is insufficient, the discharge flow will often be negative in the calculation result. At this time, the total amount of water in a period is very small. When there are fewer discrete points of storage capacity, each discrete storage capacity is very large, so even if all the water in a period is stored, it cannot meet the demand for upward fluctuation of a discrete point. At this time, the penalty mechanism of DP calculation will be destroyed. Eventually, to meet the requirements of the final water level of the scheduling, the water level will forcibly rise, and then there will be a negative discharge flow (as shown in Figure 3). To solve this problem, an effective variation dispersion mechanism is proposed in this paper. That is, according to the amount of inbound flow in each period, the discrete degree of reservoir capacity is dynamically determined to ensure that inbound flow can make the discrete point of water level change upward by at least one point. The process is shown in Figure 4. The rules for determining the minimum number of discrete points in each period are as follows:
N t =   V t u p V t l o / W t
where Nt is the minimum variable discrete points in the tth period, Vtup is the upper limit of the storage capacity in the tth period, Vtlo is the lower limit of the storage capacity in the tth period, and Wt is the total inbound flow in the tth period. In actual calculations, the number of discrete points of variation Nt in the tth period is the lower limit. To achieve higher accuracy, the number of discrete points can be a multiple of Nt, but the calculation time will increase at this time.

3.4. Overall Scheme of Algorithm Implementation

In this paper, Dongjiang Hydropower Station is taken as the research object and the dimension reduction method based on dynamic programming under the hour scale is adopted to further alleviate the dimension disaster of DP and avoid negative discharge. The specific implementation scheme is as follows in Figure 5:

4. Case Study

This paper takes Dongjiang Reservoir as an example to study two typical flood processes in flood season and compares their conventional and optimal scheduling.

4.1. Overview of Dongjiang Reservoir Project

The Dongjiang Hydropower Station (as shown in Figure 6) is located in an ashlar canyon 11 km upstream of Dongjiang Town, Zixing County, Hunan Province, China. It is the leading project in the cascade development of the Leishui River Basin. The installed capacity of the Dongjiang Reservoir is 615 MW, the normal storage level of the reservoir is 285 m, and the total installed capacity of the downstream cascade power stations is 265 MW. The effective volume of the Dongjiang Reservoir is 5.25 billion m3 and the storage capacity coefficient is 1.16. It has excellent regulation performance. The flood control design standard of the Dongjiang Dam is a thousand-year flood, and the check flood standard is a ten thousand-year flood. The flood control limit water level of the reservoir is 284 m. The downstream farmland flood control standard is a five-year flood, and the discharge flow of the Dongjiang River does not exceed 1500 m3/s. The flood control standard for the Leiyang section of the Beijing-Guangzhou Railway is a hundred-year flood, and the discharge flow of the Dongjiang River does not exceed 3500 m3/s.

4.2. Conventional Scheduling Rules of Dongjiang Reservoir

According to the conventional scheduling rules in Section 2.2.1 and the technical scheme recorded in literature by Hunan Power Grid Corporation of China, it can be known that the ‘comprehensive judgment method’ is adopted by the scheduling of Dongjiang Reservoir to judge the flood level of entering the reservoir. Combined with the ‘Dongjiang Reservoir Scheduling Regulations’, the flood control scheduling procedures of the Dongjiang Reservoir can then be obtained as follows:
(1)
In a five-year flood, The peak flow is 3730 m3/s, the five-day flood volume is 569 million m3, the starting water level is 284 m, the discharge flow does not exceed 1500 m3/s, and the maximum water level of the reservoir does not exceed 285 m.
(2)
In a twenty-year flood, the peak flow is 5850 m3/s, the five-day flood volume is 900 million m3, the starting water level is 284 m, the discharge flow does not exceed 3500 m3/s, and the maximum water level of the reservoir does not exceed 285.40 m.
(3)
In a hundred-year flood, the peak flow is 10,100 m3/s, the five-day flood volume is 1.34 billion m3, the starting water level is 284 m, the discharge flow does not exceed 3500 m3/s, and the maximum water level of the reservoir does not exceed 286.65 m.
(4)
In a thousand-year flood, the peak flow is 15,300 m3/s, the five-day flood volume is 19.4 billion m3, the starting water level is 284 m, the discharge flow does not exceed 3500 m3/s. When the water level of the reservoir is less than 286.65 m, the discharge flow does not exceed 3500 m3/s. After the water level exceeds 286.65 m, the control discharge flow does not exceed 4090 m3/s, and the maximum control water level of the reservoir does not exceed 288.88 m.
(5)
In a ten thousand-year flood, the peak flow is 20,600 m3/s, the five-day flood volume is 25.4 billion m3, and the starting water level is 284 m. When the water level of the reservoir is below 286.65 m, the control discharge flow does not exceed 3500 m3/s. When the water level does not reach 288.88 m, the control discharge flow does not exceed 4090 m3/s. When the water level exceeds 288.88 m and the inbound flow of the reservoir exceeds the thousand-year flood, the water level of the reservoir does not exceed 291.92 m, and the maximum discharge flow can reach 4130 m3/s.

4.3. Input Data

The input data of the flood control optimal scheduling model is as follows:
(1)
From the technical scheme recorded in the literature by the Hunan Power Grid Corporation of China (2015), it can be seen that the flood control limit water level is 284 m, which is also the starting water level of the reservoir. As such, during the scheduling, the starting water levels of the two floods are 284 m. The water level at the end of the scheduling period is set to be consistent with the initial water level.
(2)
The designed flood level of Dongjiang Reservoir is 288.88 m and the dead water level is 242 m. Therefore, the lower limit of the water level in the DP calculation is set to 242 m, and the upper limit of the water level is 288.88 m.
(3)
The scheduling time intervals of the two floods are 1 h. The scheduling periods of the first flood are 136 periods; the scheduling periods of the second flood are 89 periods. Among them, the first flood began on 17 March 2020, and stopped on 22 March 2020 and the second flood began on 1 April 2020, and stopped on 5 April 2020.
(4)
The inflow process of the first flood is shown in Figure 7, and the inflow process of the second flood is shown in Figure 8.

4.4. Calculation Results and Analysis

The two typical floods in Dongjiang Reservoir are selected for conventional scheduling and optimal scheduling, and the results are as follows.

4.4.1. Conventional Scheduling Results

It can be seen from Figure 7 that the maximum peak flow is about 736.4 m3/s. The comprehensive judgment method is used to know that the first flood is a five-year flood, and, similarly, the second flood is also a five-year flood. The conventional flood control scheduling rules described in Section 2.2.2 and flood control scheduling procedures of the Dongjiang Reservoir described in Section 4.2 are adopted in scheduling. The conventional scheduling results of two floods are shown in Figure 9 and Figure 10.

4.4.2. Optimal Scheduling Results

The maximum peak clipping criterion and the maximum flood control safety guarantee criterion are combined with the improved DP algorithm to optimize the scheduling of two floods of Dongjiang Reservoir. The results of optimal scheduling with the maximum peak clipping criterion are shown in Figure 11 and Figure 12, and the results of optimal scheduling with the maximum flood control safety guarantee criterion are shown in Figure 13 and Figure 14.

4.4.3. Comparative Analysis of Results of Conventional Scheduling and Optimal Scheduling

The two floods are five-year floods and, when scheduling, the corresponding scheduling rules are adopted. It can be seen from Figure 9 that the upstream inbound flow in the entire process of the first flood is lower than the maximum discharge flow. The discharge flow is equal to the inbound flow to ensure the reservoir water level remains unchanged and ensure the water utilization requirements. Therefore, the maximum discharge flow during the entire discharge process is the maximum inbound flow of 736.4 m3/s, and the water level remains unchanged at 284 m. It can be seen from Figure 10 that at the beginning of the second flood, the inbound flow of the reservoir is lower than the maximum discharge flow. To keep the reservoir water level unchanged, the discharge flow is equal to the inbound flow. With the increased inflow of the reservoir, the upstream inbound flow of the second flood exceeds the maximum discharge. At this time, the gate is opened and the maximum discharge flow is 1500 m3/s, and the water level remains unchanged at 284 m.
When scheduling, according to the maximum peak clipping criterion the discharge flow of the entire discharge process is relatively uniform. It can be seen from Figure 11 that the discharge flow of the first flood is mainly concentrated at about 300 m3/s. It can be seen from Figure 12 that the discharge flow of the second flood is mainly concentrated at about 1000 m3/s, and the maximum discharge flow of the two floods during the entire discharge process is lower than the conventional scheduling, which is conducive to the stability of the downstream protection objects. When scheduling, according to the maximum flood control safety guarantee criterion, the water level during the entire discharge process shows a trend of the first decline and then rise. It can be seen from Figure 13 that the water level of the first flood first drops to about 283.6 m, and then rises to about 284 m. It can be seen from Figure 14 that the water level of the second flood first drops to about 283.1 m, and then rises to about 284 m. The lowest reservoir water levels of the two floods are both lower than the 284 m of the conventional scheduling, which can increase the flood control capacity of the reservoir and benefit the safety of the reservoir itself and the downstream protection objects.

4.4.4. Results before and after DP Dimensionality Reduction Processing

This paper takes the maximum peak clipping criterion as an example to compare and analyze the effects of the DP algorithm before and after dimensionality reduction processing. The specific results are shown in Table 1 and Figure 15 and Figure 16.

4.4.5. Comparative Analysis of Results before and after DP Dimensionality Reduction Processing

It can be seen from Table 1 that after the DP processing, the calculation time is lower than that before the processing due to the formation of a variable retraction space. The first flood is reduced by 106 s, which is equivalent to a reduction of 65%, and the second flood is reduced by 37 s, which is equivalent to a reduction of 59%. It can be seen from Figure 15 that, on the whole, after the DP dimensionality reduction processing, the discharge flow is concentrated around 300 m3/s, and the flow before processing fluctuates in the range of 100 m3/s–600 m3/s, which is extremely unstable. Especially in the 49–61 period, the contrast is obvious. For the same reason, it can be seen from Figure 16 that the discharge flow after DP dimensionality reduction processing is mainly concentrated around 1000 m3/s, and the flow before processing fluctuates in the range of 800 m3/–1400 m3/s, which is not concentrated near a certain fixed value.

5. Conclusions

In this paper, aiming at solving the problem of reservoir flood control optimal operation, the variable cable space of DP is constructed by improving the application of the DP algorithm, and the variable discrete mechanism of cable space is proposed to solve the problem of negative downstream discharge, which effectively reduces the calculation amount of DP to improve the calculation speed of DP and avoids the negative downstream discharge. The conclusions are as fol1ows by taking the Dongjiang Reservoir as an example to conduct research.
(1)
Through the analysis of the results of conventional scheduling and optimal scheduling, it is found that the conventional scheduling is scheduled according to the five-year flood standard, the maximum discharge flow does not exceed the allowable value during scheduling, and the reservoir water level remains unchanged. This paper is based on the improved DP algorithm, when scheduling with the maximum peak clipping criterion, the discharge flows of the two floods in the whole process are concentrated near a certain fixed value, and both are lower than the maximum discharge flow of conventional scheduling, which is more conducive to the safety of downstream protection objects. When scheduling under the maximum flood control safety guarantee criterion, the lowest water level of the reservoir is lower than the conventional scheduling result, which increases the flood control storage capacity of the reservoir and is beneficial to the safety of the reservoir itself and the downstream protection objects.
(2)
In terms of the DP dimensionality reduction processing method, due to the proposed variable discrete mechanism of retracting space, the computation amount of DP is reduced, so the calculation time after processing is lower than that before processing. The calculation time after the first flood dimensionality reduction processing is reduced by about 65%, and the second flood is reduced by about 59%, which effectively reduces the calculation time of the DP algorithm. Therefore, when this method is applied to the joint scheduling of reservoirs and flood scheduling on an hourly scale, the calculation efficiency and the accuracy of the calculation results will be greatly improved.
In addition, the selected floods in this paper are all small floods that occur once in five years. Whether this improved algorithm will have the same effect on the application of large floods needs further verification. The algorithm has only been successfully applied in this reservoir to date. Whether it can adapt to the optimal operation of other reservoirs requires further verification.

Author Contributions

Writing—original draft, S.W.; Writing—review & editing and Methodology, Z.J.; Investigation, Y.L. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Natural Science Foundation of China (52179016, 51809098), Natural Science Foundation of Hubei Province (2021CFB597).

Acknowledgments

This study was financially funded by the Natural Science Foundation of China (52179016, 51809098), Natural Science Foundation of Hubei Province (2021CFB597).

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Su, C.; Yuan, W.; Cheng, C.; Wang, P.; Sun, L.; Zhang, T. Short-term generation scheduling of cascade hydropower plants with strong hydraulic coupling and head-dependent prohibited operating zones. J. Hydrol. 2020, 591, 125556. [Google Scholar] [CrossRef]
  2. Periçaro, G.A.; Karas, E.W.; Gonzaga, C.C.; Marcílio, D.C.; Oening, A.P.; Matioli, L.C.; Detzel, D.H.; de Geus, K.; Bessa, M.R. Optimal non-anticipative scenarios for nonlinear hydrothermal power systems. Appl. Math. Comput. 2020, 387, 124820. [Google Scholar] [CrossRef]
  3. Zeng, X.; Hu, T.; Cai, X.; Zhou, Y.; Wang, X. Improved dynamic programming for parallel reservoir system operation optimization. Adv. Water Resour. 2019, 131, 103373. [Google Scholar] [CrossRef]
  4. Bellman, R.E. Dynamic Programming; Princeton University Press: Princeton, NJ, USA, 1957. [Google Scholar]
  5. Zhao, T.T.G.; Cai, X.M.; Lei, X.H.; Wang, H. Improved dynamic programming for reservoir operation optimization with a concave objective function. J. Water Resour. Plan Manag. 2012, 138, 590–596. [Google Scholar] [CrossRef]
  6. Yang, D.W.; Zhao, T.T.G.; Zhao, J.S. Improved dynamic programming for hydropower reservoir operation. J. Water Resour. Plan Manag. 2014, 140, 365–374. [Google Scholar]
  7. Cheng, C.T.; Cheng, X.; Shen, J.J.; Wu, X.Y. Short-term peak shaving operation for multiple power grids with pumped storage power plants. Int. J. Electr. Power Energy Syst. 2015, 67, 570–581. [Google Scholar] [CrossRef]
  8. Larson, R.; Korsak, A. A dynamic programming successive approximations technique with convergence proofs. Automatica 1970, 6, 245–252. [Google Scholar] [CrossRef]
  9. Heidari, M.; Chow, V.T.; Kokotović, P.V.; Meredith, D.D. Discrete differential dynamic programing approach to water resources systems optimization. Water Resour. Res. 1971, 7, 273–282. [Google Scholar] [CrossRef]
  10. Bai, T.; Chang, J.X.; Chang, F.J.; Huang, Q.; Wang, Y.M.; Chen, G.S. Synergistic gains from the multi-objective optimal operation of cascade reservoirs in the Upper Yellow River basin. J. Hydrol. 2015, 523, 758–767. [Google Scholar] [CrossRef]
  11. Zhang, W.; Liu, P.; Chen, X.; Wang, L.; Ai, X.; Feng, M.; Liu, D.; Liu, Y. Optimal operation of multi-reservoir systems considering time-lags of flood routing. Water Resour. Manag. 2016, 30, 523–540. [Google Scholar] [CrossRef]
  12. Cheng, C.; Wang, S.; Chau, K.W.; Wu, X. Parallel discrete differential dynamic programming for multi-reservoir operation. Environ. Model Softw. 2014, 57, 152–164. [Google Scholar] [CrossRef] [Green Version]
  13. He, S.; Guo, S.; Chen, K.; Deng, L.; Liao, Z.; Xiong, F.; Yin, J. Optimal impoundment operation for cascade reservoirs coupling parallel dynamic programming with importance sampling and successive approximation. Adv. Water Resour. 2019, 131, 103375. [Google Scholar] [CrossRef]
  14. Feng, Z.; Niu, W.; Jiang, Z.; Qin, H.; Song, Z.G. Monthly operation optimization of cascade hydropower reservoirs with dynamic programming and Latin hypercube sampling for dimensionality reduction. Water Resour. Manag. 2020, 34, 2029–2041. [Google Scholar] [CrossRef]
  15. Zhang, Y.K.; Jiang, Z.Q.; Ji, C.M.; Sun, P. Contrastive analysis of three parallel modes in multi-dimensional dynamic programming and its application in cascade reservoirs operation. J. Hydrol. 2015, 529, 22–34. [Google Scholar] [CrossRef]
  16. Ji, C.M.; Jiang, Z.Q.; Sun, P.; Zhang, Y.K.; Wang, L.P. Research and Application of Multidimensional Dynamic Programming in Cascade Reservoirs Based on Multilayer Nested Structure. J. Water Resour. Plan. Manag. 2015, 141, 1–13. [Google Scholar] [CrossRef]
  17. Jiang, Z.Q.; Hui, Q.; Ji, C.M.; Feng, Z.K.; Zhou, J.Z. Two Dimension Reduction Methods for Multi-Dimensional Dynamic Programming and Its Application in Cascade Reservoirs Operation Optimization. Water 2017, 9, 634. [Google Scholar] [CrossRef] [Green Version]
  18. Liu, J.; Wang, L. Research status and the prospect of joint flood control dispatching of reservoir group. Hydropower Energy Sci. 2004, 2, 30–32. [Google Scholar]
Figure 1. Flow chart for determining the upper and lower limits of the water level during the period.
Figure 1. Flow chart for determining the upper and lower limits of the water level during the period.
Energies 15 00676 g001
Figure 2. Schematic diagram of determining the upper and lower limits of the water level during the period.
Figure 2. Schematic diagram of determining the upper and lower limits of the water level during the period.
Energies 15 00676 g002
Figure 3. Schematic diagram of the negative value of discharge flow.
Figure 3. Schematic diagram of the negative value of discharge flow.
Energies 15 00676 g003
Figure 4. Flow chart of the negative value of discharge flow.
Figure 4. Flow chart of the negative value of discharge flow.
Energies 15 00676 g004
Figure 5. Implementation scheme diagram of improved DP algorithm.
Figure 5. Implementation scheme diagram of improved DP algorithm.
Energies 15 00676 g005
Figure 6. Dongjiang River Basin Map.
Figure 6. Dongjiang River Basin Map.
Energies 15 00676 g006
Figure 7. The inflow process line of the first flood.
Figure 7. The inflow process line of the first flood.
Energies 15 00676 g007
Figure 8. The inflow process line of the second flood.
Figure 8. The inflow process line of the second flood.
Energies 15 00676 g008
Figure 9. Conventional scheduling results of the first flood.
Figure 9. Conventional scheduling results of the first flood.
Energies 15 00676 g009
Figure 10. Conventional scheduling results of the second flood.
Figure 10. Conventional scheduling results of the second flood.
Energies 15 00676 g010
Figure 11. Optimal scheduling results of the first flood with the maximum peak clipping criterion.
Figure 11. Optimal scheduling results of the first flood with the maximum peak clipping criterion.
Energies 15 00676 g011
Figure 12. Optimal scheduling results of the second flood with the maximum peak clipping criterion.
Figure 12. Optimal scheduling results of the second flood with the maximum peak clipping criterion.
Energies 15 00676 g012
Figure 13. Optimal scheduling results of the first flood with the maximum flood control safety guarantee criterion.
Figure 13. Optimal scheduling results of the first flood with the maximum flood control safety guarantee criterion.
Energies 15 00676 g013
Figure 14. Optimal scheduling results of the second flood with the maximum flood control safety guarantee criterion.
Figure 14. Optimal scheduling results of the second flood with the maximum flood control safety guarantee criterion.
Energies 15 00676 g014
Figure 15. Comparison of discharge flow before and after DP dimensionality reduction processing in the first flood.
Figure 15. Comparison of discharge flow before and after DP dimensionality reduction processing in the first flood.
Energies 15 00676 g015
Figure 16. Comparison of discharge flow before and after DP dimensionality reduction processing in the second flood.
Figure 16. Comparison of discharge flow before and after DP dimensionality reduction processing in the second flood.
Energies 15 00676 g016
Table 1. Comparison of results before and after dimensionality reduction of the maximum peak clipping criterion.
Table 1. Comparison of results before and after dimensionality reduction of the maximum peak clipping criterion.
Comparative ItemsBefore the First Flood DP Dimensionality Reduction ProcessingAfter the First Flood DP Dimensionality Reduction ProcessingBefore the Second Flood DP Dimensionality Reduction ProcessingAfter the Second Flood DP Dimensionality Reduction Processing
Calculated time (s)162566326
The average number of discrete points in each period15008001000735
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Wang, S.; Jiang, Z.; Liu, Y. Dimensionality Reduction Method of Dynamic Programming under Hourly Scale and Its Application in Optimal Scheduling of Reservoir Flood Control. Energies 2022, 15, 676. https://doi.org/10.3390/en15030676

AMA Style

Wang S, Jiang Z, Liu Y. Dimensionality Reduction Method of Dynamic Programming under Hourly Scale and Its Application in Optimal Scheduling of Reservoir Flood Control. Energies. 2022; 15(3):676. https://doi.org/10.3390/en15030676

Chicago/Turabian Style

Wang, Suiling, Zhiqiang Jiang, and Yi Liu. 2022. "Dimensionality Reduction Method of Dynamic Programming under Hourly Scale and Its Application in Optimal Scheduling of Reservoir Flood Control" Energies 15, no. 3: 676. https://doi.org/10.3390/en15030676